This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $184,459 | $184,459 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | EC | Environmental compliance requirements complete | 11/15/2007 | 11/30/2007 | Concluded | Michael Parsley (Inactive) | 10/4/2007 9:34:26 AM |
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA). | |||||||
B | Collect point data describing substrates | 11/15/2007 | 4/30/2008 | Concluded | Michael Parsley (Inactive) | 10/4/2007 3:01:33 PM | |
Description: Use a variety of methods to characterize riverbed substrates at point locations. An automated sediment classification system will be used on the bathymetric survey vessel to capture data during surveys. Additional point data will be taken using visual techniques or grab samplers. | |||||||
C | Create sediment facies datasets | 11/15/2007 | 11/14/2008 | Concluded | Michael Parsley (Inactive) | 10/4/2007 3:02:06 PM | |
Description: Aggregate substrate classification point data and interpret data to create sediment facies maps. Ground-truth data as needed. Produce metadata. | |||||||
D | DELIV | Sediment GIS layer | 11/14/2008 | Concluded | Michael Parsley (Inactive) | 10/4/2007 9:34:27 AM | |
Description: ArcGIS coverages (electronic files) on desktop PC's of interpreted sediment facies. Raw data used to generate the maps will also be stored in databases. All data will be proofed and error checked, and backed up on servers or other media. Metadata describing the datasets will be produced. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1464. Primary R, M, and E Focal Strategy [Population Status, Hydrosystem, Tributary Habitat, Estuary/Ocean, Harvest, Hatchery, Predation, Multiple Strategies] | Hydrosystem | Hydrosystem | |||
1472. Primary R, M, and E Type [Status and Trend Monitoring, Action Effectiveness Research, Uncertainties Research, Project Implementation/ Compliance Monitoring] | Uncertainty Research | Uncertainty Research |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
58988 | 48.704838 | -116.361026 | Idaho | Boundary | Mountain Columbia | Kootenai |
58990 | 45.929892 | -119.377745 | Washington | Benton | Columbia Plateau | Columbia Lower Middle |
58997 | 45.554163 | -122.23655 | Washington | Skamania | Lower Columbia | Columbia Lower |
Study Plan Name | Study Plan Owner | Protocol State | Sample Design Name |
---|---|---|---|
BPA Fish and Wildlife Program Monitoring v1.0 | Russell Scranton | Draft | Characterize riverbed substrates - US Geological Survey (USGS) v1.0 |