Title | Link |
---|---|
NONE - No data repository or not electronically available | N/A |
This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $1,100 | $488 | actual amount spent by % of Salary, G&S,CS |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | EC | Environmental compliance requirements complete | 6/1/2009 | 6/1/2009 | Concluded | Sarah Branum (Inactive) | 5/5/2009 5:26:52 PM |
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA). | |||||||
B | Collect water samples | 6/1/2009 | 5/31/2010 | Concluded | Sarah Branum (Inactive) | 5/5/2009 5:26:52 PM | |
Description: Approximately every 24 days. | |||||||
C | DELIV | Data made available to WDOE, BPA, and other interested parties. | 5/31/2010 | Concluded | Sarah Branum (Inactive) | 5/5/2009 5:26:53 PM | |
Description: Collect water samples approximately every 24 days and run through district lab for analysis of total suspended solids (TSS). Temperature, pH, and dissolved oxygen data is collected at time of sample collection and included in spreadsheet maintained by Pomeroy CD. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1464. Primary R, M, and E Focal Strategy [Population Status, Hydrosystem, Tributary Habitat, Estuary/Ocean, Harvest, Hatchery, Predation, Multiple Strategies] | Tributary Habitat | Tributary Habitat | |||
1472. Primary R, M, and E Type [Status and Trend Monitoring, Action Effectiveness Research, Uncertainties Research, Project Implementation/ Compliance Monitoring] | Status and Trend Monitoring | Status and Trend Monitoring |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
18905 | 46.361142 | -117.556429 | Washington | Garfield | Columbia Plateau | Tucannon |
18906 | 46.472912 | -117.600554 | Washington | Garfield | Columbia Plateau | Tucannon |
Title | Link |
---|---|
NONE - No data repository or not electronically available | N/A |
Study Plan Name | Study Plan Owner | Protocol State | Sample Design Name |
---|---|---|---|
Water quality monitoring in the Hangman Creek Watershed to track changes in water quality over time v1.0 | Stephanie Hallock | Draft | Collect water quality data and analyze in local lab - Pomeroy Conservation District v1.0 |
Title | Category | Subcategory | Subcategory focus 1 | Subcategory focus 2 |
---|---|---|---|---|
Average daily water conducitivity in a stream reach | Water Quality | Conductivity (ID: 154) | NA | NA |
Average pH in a stream reach | Water Quality | pH (ID: 158) | NA | NA |
Average daily turbidity in a stream reach | Water Quality | Turbidity (ID: 161) | NA | NA |
Average daily temperature in a stream reach | Water Quality | Water Temperature (ID: 162) | NA | NA |
Water Quality Index of a stream reach | Water Quality | Water Quality Index (ID: 350) | NA | NA |