This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
1. 55970 (12/01/2011 - 11/30/2012) | $0 | $0 | ||
Work Element Budget (Current Performance Period) | $0 | $0 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | PROHERB | Provide BPA EC Lead with calendar year 2012 proposed herbicide use form | 12/1/2011 | 2/29/2012 | Concluded | David Byrnes (Inactive) | 4/24/2012 9:54:14 AM |
Description: Contractor submits any proposed herbicide use on an approved form to the BPA EC Lead. The BPA EC Lead will send the form out in December of each year; it will be due January 31. Use this milestone only when you are using BPA funding to apply herbicides as part of your work. | |||||||
B | ACTHERB | Provide BPA EC Lead with calendar year 2012 actual herbicide use form. | 12/1/2011 | 11/30/2012 | Concluded | David Byrnes (Inactive) | 4/24/2012 9:54:14 AM |
Description: Contractor submits any actual herbicide use on an approved form to the BPA Environmental Compliance Lead. The BPA EC Lead will send the form out in December of each year; it will be due January 31. Use this milestone only when you are using BPA funding to apply herbicides as part of your work. | |||||||
C | LAMP | Determine if contract work could adversely affect Pacific lamprey | 12/1/2011 | 2/29/2012 | Concluded | David Byrnes (Inactive) | 4/24/2012 9:54:14 AM |
Description: Contractor will review work proposed under this contract and determine the following: 1) Will field work take place in any area where lamprey may be present? (Any tributary or subbasin where anadromous fish exist is also accessible Pacific lamprey habitat.) 2) Are there any stream disturbing activities or instream activities that could adversely impact Pacific lamprey? Examples of activities posing a threat to lamprey may include (this list is not intended to be all-inclusive): aquatic habitat improvements, fish passage improvements, culvert replacements, water diversions, altered management of water flows, dewatering of any portions of streams, or alteration of irrigation practices. If you answer no to EITHER 1 or 2 above, the following does not apply. If the answer is yes to BOTH 1 and 2, the contractor must implement USFWS Best Management Practices to Minimize Adverse Effects to Pacific Lamprey (Entosphenus tridentatus) http://www.fws.gov/pacific/Fisheries/sphabcon/lamprey/pdf/Best%20Management%20Practices%20for%20Pacific%20Lamprey%20April%202010%20Version.pdf (BMPs). By Feb 15 each year, the contractor should report any lamprey observations during the previous calendar year to US Fish and Wildlife Service contacts listed at http://www.fws.gov/pacific/Fisheries/sphabcon/lamprey/. This data should include date, location (river mile or GPS), number of individuals, and life stage. Report the life stage as ammocoete (larval stage with undeveloped eyes, found burrowed in substrate), macropthalmia (free-swimming juvenile stage with developed eyes) or adult. See page 10 of the BMP document for pictures. This milestone end date should match the last day of any field work that could adversely impact Pacific lamprey, under this contract, or the Feb 15 reporting date, whichever comes later. | |||||||
D | ANS | Inspect water craft, waders, boots, etc. to be used in or near water for aquatic invasive species | 2/1/2012 | 11/30/2012 | Concluded | David Byrnes (Inactive) | 4/24/2012 9:54:14 AM |
Description: Aquatic invasive Species Guidance: Uniform Decontamination Procedures: http://www.aquaticnuisance.org/wordpress/wp-content/uploads/2009/01/Recommended-Protocols-and-Standards-for-Watercraft-Interception-Programs-for-Dreissenid-Mussels-in-the-Western-United-States-September-8.pdf -- Best management guidance for boaters: http://www.coastal.ca.gov/ccbn/bmp-boaters.pdf -- Aquatic Nuisance Species newsletter: http://www.aquaticnuisance.org/newsletters -- State Aquatic Invasive Species Management Plans: Oregon: http://www.clr.pdx.edu/publications/files/OR_ANS_Plan.pdf -- Washington: http://www.wdfw.wa.gov/publications/pub.php?id=00105 -- Montana: http://www.anstaskforce.gov/Montana-FINAL_PLAN.pdf -- Idaho: http://www.idahoag.us/Categories/Environment/InvasiveSpeciesCouncil/documents/Idaho%20Aquatic%20Nuisance%20Species%20Plan.pdf | |||||||
E | NOXIOUS | Inspect and, if necessary, wash vehicles and equipment infested with terrestrial invasive species | 2/1/2012 | 11/30/2012 | Concluded | David Byrnes (Inactive) | 4/24/2012 9:54:14 AM |
Description: Prevent spread of invasive species | |||||||
F | PERMS | Obtain/Renew applicable local, state, federal and tribal environmental permits | 12/1/2011 | 2/29/2012 | Concluded | David Byrnes (Inactive) | 4/24/2012 9:54:14 AM |
Description: Obtain/Renew applicable local, state, federal and tribal environmental permits | |||||||
G | ECCOMP | Obtain BPA's EC Lead sign-off that EC requirements are complete | 12/1/2011 | 2/29/2012 | Concluded | David Byrnes (Inactive) | 4/24/2012 9:54:14 AM |
Description: Obtain BPA's EC Lead sign-off that EC requirements are complete | |||||||
H | DELIV | Environmental Compliance completed | 2/29/2012 | Concluded | David Byrnes (Inactive) | 4/24/2012 9:54:14 AM | |
Description: Documentation and assistance to support BPA's Environmental Compliance Group (such as maps, design drawings, survey reports, permit applications). |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1479. Are herbicides used as part of work performed under this contract? | No | No | |||
1722. Will water craft, heavy equipment, waders, boots, or other equipment be used from outside the local watershed as part of work performed under this contract? | No | Yes |