1995-013-00 EXP NPT RESIDENT FISH SUBSTITUTION
Contract Start Date:
5/1/2013
Contract End Date:
4/30/2014
Title:
I: 157 - Monitor habitat at three ponds
Description:
Collect water quality data at Mud Springs, Talmaks Reservoir, and Tunnel Pond throughout the year in order to better manage fish stocking levels.
WE Agreement Type:
Contracted
Deliverable Specification:
An OxyGuard Handy Polaris water quality instrument will be used to collect twenty sets of water quality measurements from each pond, Mud Springs, Talmaks, and Tunnel Pond, including water temperature to one tenth of a degree Celsius, dissolved oxygen levels to one tenth of a milligram per liter, specific conductivity to one tenth microsiemen per centimeter, pH to one hundredth of a pH unit, and depth to one thousandth of a meter throughout the year in order to determine the quality of trout habitat in each of the three project ponds.

Water quality measurements will be collected twice monthly, first and second halves of each month, from May through October, then once per month from November through February, and then again twice monthly in March and April to determine extent of suitable trout habitat in each of the three ponds. Increased frequency of monitoring in warmer months occurs in response to increased limnological dynamics during these months.

Measurements will be taken from a boat at predetermined stations of maximum pond depth as determined from survey maps of each pond, at .303 m depth intervals. In order to determine the minimum dissolved oxygen levels that may limit the trout carrying capacity, measurements will be taken as early in the day as possible.
WSE Effective Budget:
$25,000
% of Total WSE Effective Budget:
11.79%
WSE Start:
05/01/2013
WSE End:
04/30/2014
WSE Completion:
04/30/2014
WSE Progress:
Concluded
WSE ID Continued From:
n/a
WSE ID Continued To:
n/a
Finite or Recurring:
Recurring

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
Work Element Budget (Current Performance Period) $25,000 $25,000

6 Milestones
Sort Type Title Start End Status Modified By Modified Date
A EC Environmental compliance requirements complete 5/1/2013 5/1/2013 Concluded Tod Sween 1/22/2013 2:37:04 PM
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA).
B PUBPROTOCOL Review, revise, and Publish protocol, study design, and methods in monitoringmethods.org 5/1/2013 4/30/2014 Concluded Tod Sween 1/22/2013 2:37:04 PM
Description: The Protocol (including temporal and spatial design) and Methods for this work element are stored at monitoringmethods.org and need to be finalized (i.e., "Published" through monitoringmethods.org), preferably prior to data collection. Preparations for contract renewals must include reviewing any previously published Protocols/Methods to ensure that they are consistent with how work will be done in any subsequent contract.
C Water quality data collection at Mud Springs Reservoir 5/1/2013 4/30/2014 Concluded Tod Sween 1/22/2013 2:37:04 PM
Description: Monitor trout habitat through measurements of water quality parameters at Mud Springs Reservoir throughout the year.
D Water quality data collection at Talmaks Reservoir 5/1/2013 4/30/2014 Concluded Tod Sween 1/22/2013 2:37:04 PM
Description: Monitor trout habitat through measurements of water quality parameters at Talmaks Reservoir throughout the year.
E Water quality data collection at Tunnel Pond 5/1/2013 4/30/2014 Concluded Tod Sween 1/22/2013 2:37:05 PM
Description: Monitor trout habitat through measurements of water quality parameters at Tunnel Pond throughout the year.
F DELIV Water Quality Data Collection at Mud Springs and Talmaks Reservoirs, and at Tunnel Pond 4/30/2014 Concluded Tod Sween 1/31/2013 6:51:05 AM
Description: An OxyGuard Handy Polaris water quality instrument will be used to collect twenty sets of water quality measurements from each pond, Mud Springs, Talmaks, and Tunnel Pond, including water temperature to one tenth of a degree Celsius, dissolved oxygen levels to one tenth of a milligram per liter, specific conductivity to one tenth microsiemen per centimeter, pH to one hundredth of a pH unit, and depth to one thousandth of a meter throughout the year in order to determine the quality of trout habitat in each of the three project ponds. Water quality measurements will be collected twice monthly, first and second halves of each month, from May through October, then once per month from November through February, and then again twice monthly in March and April to determine extent of suitable trout habitat in each of the three ponds. Increased frequency of monitoring in warmer months occurs in response to increased limnological dynamics during these months. Measurements will be taken from a boat at predetermined stations of maximum pond depth as determined from survey maps of each pond, at .303 m depth intervals. In order to determine the minimum dissolved oxygen levels that may limit the trout carrying capacity, measurements will be taken as early in the day as possible.

Work Site ID Latitude Longitude State County Province Subbasin
46317 46.199051 -116.584141 Idaho Lewis Mountain Snake Clearwater
46387 46.469509 -116.24485 Idaho Clearwater Mountain Snake Clearwater
62089 46.17 -116.5605 Idaho Lewis Mountain Snake Clearwater

Primary Focal Species:
Trout, Rainbow (Oncorhynchus mykiss)
Secondary Focal Species:
None

Title Link
NONE - No data repository or not electronically available N/A
Study Plan Name Study Plan Owner Protocol State Sample Design Name
NPT Resident Fish Substitution Data Collection Activities v1.0 Tod Sween Draft Monitor habitat at three ponds - Nez Perce Tribe v1.0

ID Name Type Optional Customized Based On Status
1127 Access-Access Creel Survey for Lakes and Reservoirs v1.0 Data Collection No N/A Finalized
184 Effort Estimation - Private Vessel Bar Crossing Count Method – Foggy days and Columbia River Estuary v1.0 Data Collection No N/A Finalized
973 Fish condition v1.0 Data Analysis/Interpretation No N/A Draft
3789 Standard Operating Procedures for the Collection, Processing, and Analysis of Stream Samples v1.0 Data Collection No N/A Finalized
72 Water Chemistry (EMAP) v1.0 Data Collection No N/A Finalized
320 Water Temperature-USGS Gauges v1.0 Data Collection No N/A Revising

Title Category Subcategory Subcategory focus 1 Subcategory focus 2
Collect Fecal Coliform Data Contaminants/Toxics/Pollutants Concentration: Bacteria (ID: 11) NA NA
Collect harvest data at three ponds Fish Catch Per Unit Effort (ID: 54) Fish Life Stage: Adult Fish NA
Monitor Fish Health at three ponds Fish Condition Factor (ID: 282) NA NA
Monitor Fish Habitat at three ponds Water Quality Dissolved Gas Concentration (By Gas) (ID: 155) NA NA
Collect Total Ammonia data Water Quality Nitrogen (ID: 157) NA NA
Collect Total Phosphorus data at Mud Springs Water Quality Phosphorus (ID: 159) NA NA
Monitor Fish Habitat at three ponds Water Quality Water Temperature (ID: 162) NA NA