SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $49,000 | $49,000 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | EC | Environmental compliance requirements complete | 5/1/2014 | 5/1/2014 | Concluded | Hannah Dondy-Kaplan | 8/19/2013 11:32:12 AM |
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA). | |||||||
B | PUBPROTOCOL | Review, revise, and Publish protocol, study design, and methods in monitoringmethods.org | 5/1/2014 | 4/30/2015 | Concluded | Hannah Dondy-Kaplan | 8/19/2013 11:32:12 AM |
Description: The Protocol (including temporal and spatial design) and Methods for this work element are stored at monitoringmethods.org and need to be finalized (i.e., "Published" through monitoringmethods.org), preferably prior to data collection. Preparations for contract renewals must include reviewing any previously published Protocols/Methods to ensure that they are consistent with how work will be done in any subsequent contract. | |||||||
C | Harvest survey at Mud Springs | 5/1/2014 | 9/30/2014 | Concluded | Hannah Dondy-Kaplan | 8/19/2013 11:32:12 AM | |
Description: Five randomly selected weekdays and 5 randomly selected weekend days are surveyed per 2-month sample unit per pond. Within each of the randomly chosen sample days, one of the three following secondary sample units (sampling periods) are selected: (1) Morning; AM 6:00 a.m.- 10:00 a.m., (2) Mid-day; MD 10:00 am - 5:00 pm, and (3) Evening; PM 5:00 pm - 8:00 pm. The secondary sample units are randomly selected based on non-uniform probabilities determined from distribution of fisher effort from past surveys. The intent of this approach is to increase precision of data for the higher use periods. | |||||||
D | Harvest survey at Talmaks | 5/1/2014 | 9/30/2014 | Concluded | Hannah Dondy-Kaplan | 8/19/2013 11:32:12 AM | |
Description: Five randomly selected weekdays and 5 randomly selected weekend days are surveyed per 2-month sample unit per pond. Within each of the randomly chosen sample days, one of the three following secondary sample units (sampling periods) are selected: (1) Morning; AM 6:00 a.m.- 10:00 a.m., (2) Mid-day; MD 10:00 am - 5:00 pm, and (3) Evening; PM 5:00 pm - 8:00 pm. The secondary sample units are randomly selected based on non-uniform probabilities determined from distribution of fisher effort from past surveys. The intent of this approach is to increase precision of data for the higher use periods. | |||||||
E | Harvest survey at Tunnel Pond | 5/1/2014 | 10/31/2014 | Concluded | Hannah Dondy-Kaplan | 8/19/2013 11:32:12 AM | |
Description: Five randomly selected weekdays and 5 randomly selected weekend days are surveyed per 2-month sample unit per pond. Within each of the randomly chosen sample days, one of the three following secondary sample units (sampling periods) are selected: (1) Morning; AM 6:00 a.m.- 10:00 a.m., (2) Mid-day; MD 10:00 am - 5:00 pm, and (3) Evening; PM 5:00 pm - 8:00 pm. The secondary sample units are randomly selected based on non-uniform probabilities determined from distribution of fisher effort from past surveys. The intent of this approach is to increase precision of data for the higher use periods. | |||||||
F | Harvest survey at Mud Springs | 4/1/2015 | 4/30/2015 | Concluded | Hannah Dondy-Kaplan | 8/19/2013 11:32:12 AM | |
Description: Five randomly selected weekdays and 5 randomly selected weekend days are surveyed per 2-month sample unit per pond. Within each of the randomly chosen sample days, one of the three following secondary sample units (sampling periods) are selected: (1) Morning; AM 6:00 a.m.- 10:00 a.m., (2) Mid-day; MD 10:00 am - 5:00 pm, and (3) Evening; PM 5:00 pm - 8:00 pm. The secondary sample units are randomly selected based on non-uniform probabilities determined from distribution of fisher effort from past surveys. The intent of this approach is to increase precision of data for the higher use periods. | |||||||
G | Harvest survey at Talmaks | 4/1/2015 | 4/30/2015 | Concluded | Hannah Dondy-Kaplan | 8/19/2013 11:32:12 AM | |
Description: Five randomly selected weekdays and 5 randomly selected weekend days are surveyed per 2-month sample unit per pond. Within each of the randomly chosen sample days, one of the three following secondary sample units (sampling periods) are selected: (1) Morning; AM 6:00 a.m.- 10:00 a.m., (2) Mid-day; MD 10:00 am - 5:00 pm, and (3) Evening; PM 5:00 pm - 8:00 pm. The secondary sample units are randomly selected based on non-uniform probabilities determined from distribution of fisher effort from past surveys. The intent of this approach is to increase precision of data for the higher use periods. | |||||||
H | Harvest survey at Tunnel Pond | 4/1/2015 | 4/30/2015 | Concluded | Hannah Dondy-Kaplan | 8/19/2013 11:32:12 AM | |
Description: Five randomly selected weekdays and 5 randomly selected weekend days are surveyed per 2-month sample unit per pond. Within each of the randomly chosen sample days, one of the three following secondary sample units (sampling periods) are selected: (1) Morning; AM 6:00 a.m.- 10:00 a.m., (2) Mid-day; MD 10:00 am - 5:00 pm, and (3) Evening; PM 5:00 pm - 8:00 pm. The secondary sample units are randomly selected based on non-uniform probabilities determined from distribution of fisher effort from past surveys. The intent of this approach is to increase precision of data for the higher use periods. | |||||||
I | DELIV | Harvest Data Collection at Mud Springs, Talmaks, and Tunnel Pond | 4/30/2015 | Concluded | Hannah Dondy-Kaplan | 8/19/2013 11:32:12 AM | |
Description: Harvest data will be collected from Mud Springs, Talmaks, and Tunnel Pond using the creel survey design which provides individual estimates of effort, fisher hours, and harvest rate per two month period for each of the three ponds. The creel survey design applies a stratified two stage probability sampling approach as described by Malvestuto (1983). |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1464. Primary R, M, and E Focal Strategy [Population Status, Hydrosystem, Tributary Habitat, Estuary/Ocean, Harvest, Hatchery, Predation, Multiple Strategies] | Harvest | Harvest | |||
1472. Primary R, M, and E Type [Status and Trend Monitoring, Action Effectiveness Research, Uncertainties Research, Project Implementation/ Compliance Monitoring] | Project Implementation/Compliance Monitoring | Project Implementation/Compliance Monitoring |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
46306 | 46.199051 | -116.584141 | Idaho | Lewis | Mountain Snake | Clearwater |
46379 | 46.469509 | -116.24485 | Idaho | Clearwater | Mountain Snake | Clearwater |
62092 | 46.17 | -116.5605 | Idaho | Lewis | Mountain Snake | Clearwater |
Title | Link |
---|---|
NONE - No data repository or not electronically available | N/A |
Study Plan Name | Study Plan Owner | Protocol State | Sample Design Name |
---|---|---|---|
NPT Resident Fish Substitution Data Collection Activities v1.0 | Tod Sween | Draft | Harvest monitoring at three ponds - Nez Perce Tribe v1.0 |
ID | Name | Type | Optional | Customized Based On | Status |
---|---|---|---|---|---|
1127 | Access-Access Creel Survey for Lakes and Reservoirs v1.0 | Data Collection | No | N/A | Finalized |
184 | Effort Estimation - Private Vessel Bar Crossing Count Method – Foggy days and Columbia River Estuary v1.0 | Data Collection | No | N/A | Finalized |
973 | Fish condition v1.0 | Data Analysis/Interpretation | No | N/A | Draft |
3789 | Standard Operating Procedures for the Collection, Processing, and Analysis of Stream Samples v1.0 | Data Collection | No | N/A | Finalized |
72 | Water Chemistry (EMAP) v1.0 | Data Collection | No | N/A | Finalized |
320 | Water Temperature-USGS Gauges v1.0 | Data Collection | No | N/A | Revising |
Title | Category | Subcategory | Subcategory focus 1 | Subcategory focus 2 |
---|---|---|---|---|
Collect Fecal Coliform Data | Contaminants/Toxics/Pollutants | Concentration: Bacteria (ID: 11) | NA | NA |
Collect harvest data at three ponds | Fish | Catch Per Unit Effort (ID: 54) | Fish Life Stage: Adult Fish | NA |
Monitor Fish Health at three ponds | Fish | Condition Factor (ID: 282) | NA | NA |
Monitor Fish Habitat at three ponds | Water Quality | Dissolved Gas Concentration (By Gas) (ID: 155) | NA | NA |
Collect Total Ammonia data | Water Quality | Nitrogen (ID: 157) | NA | NA |
Collect Total Phosphorus data at Mud Springs | Water Quality | Phosphorus (ID: 159) | NA | NA |
Monitor Fish Habitat at three ponds | Water Quality | Water Temperature (ID: 162) | NA | NA |