N: 157 - Harvest monitoring at three ponds
Description:
Harvest data will be collected for all three ponds in order to determine the harvest rate (Catch Per Unit Effort-CPUE: amount of time invested by the anglers versus the number of fish caught, in fish per hour) for each pond.
WE Agreement Type:
Contracted
Deliverable Specification:
Harvest data will be collected from Mud Springs, Talmaks, and Tunnel Pond using the creel survey design which provides individual estimates of effort, fisher hours, and harvest rate per two month period for each of the three ponds. The creel survey design applies a stratified two stage probability sampling approach as described by Malvestuto (1983).
WSE Effective Budget:
$49,000
% of Total WSE Effective Budget:
23.11%
WSE Start:
05/01/2014
WSE End:
04/30/2015
WSE Completion:
04/30/2015
WSE Progress:
Concluded
WSE ID Continued From:
n/a
WSE ID Continued To:
n/a
Finite or Recurring:
Recurring

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
Work Element Budget (Current Performance Period) $49,000 $49,000

9 Milestones
Sort Type Title Start End Status Modified By Modified Date
A EC Environmental compliance requirements complete 5/1/2014 5/1/2014 Concluded Hannah Dondy-Kaplan 8/19/2013 11:32:12 AM
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA).
B PUBPROTOCOL Review, revise, and Publish protocol, study design, and methods in monitoringmethods.org 5/1/2014 4/30/2015 Concluded Hannah Dondy-Kaplan 8/19/2013 11:32:12 AM
Description: The Protocol (including temporal and spatial design) and Methods for this work element are stored at monitoringmethods.org and need to be finalized (i.e., "Published" through monitoringmethods.org), preferably prior to data collection. Preparations for contract renewals must include reviewing any previously published Protocols/Methods to ensure that they are consistent with how work will be done in any subsequent contract.
C Harvest survey at Mud Springs 5/1/2014 9/30/2014 Concluded Hannah Dondy-Kaplan 8/19/2013 11:32:12 AM
Description: Five randomly selected weekdays and 5 randomly selected weekend days are surveyed per 2-month sample unit per pond. Within each of the randomly chosen sample days, one of the three following secondary sample units (sampling periods) are selected: (1) Morning; AM 6:00 a.m.- 10:00 a.m., (2) Mid-day; MD 10:00 am - 5:00 pm, and (3) Evening; PM 5:00 pm - 8:00 pm. The secondary sample units are randomly selected based on non-uniform probabilities determined from distribution of fisher effort from past surveys. The intent of this approach is to increase precision of data for the higher use periods.
D Harvest survey at Talmaks 5/1/2014 9/30/2014 Concluded Hannah Dondy-Kaplan 8/19/2013 11:32:12 AM
Description: Five randomly selected weekdays and 5 randomly selected weekend days are surveyed per 2-month sample unit per pond. Within each of the randomly chosen sample days, one of the three following secondary sample units (sampling periods) are selected: (1) Morning; AM 6:00 a.m.- 10:00 a.m., (2) Mid-day; MD 10:00 am - 5:00 pm, and (3) Evening; PM 5:00 pm - 8:00 pm. The secondary sample units are randomly selected based on non-uniform probabilities determined from distribution of fisher effort from past surveys. The intent of this approach is to increase precision of data for the higher use periods.
E Harvest survey at Tunnel Pond 5/1/2014 10/31/2014 Concluded Hannah Dondy-Kaplan 8/19/2013 11:32:12 AM
Description: Five randomly selected weekdays and 5 randomly selected weekend days are surveyed per 2-month sample unit per pond. Within each of the randomly chosen sample days, one of the three following secondary sample units (sampling periods) are selected: (1) Morning; AM 6:00 a.m.- 10:00 a.m., (2) Mid-day; MD 10:00 am - 5:00 pm, and (3) Evening; PM 5:00 pm - 8:00 pm. The secondary sample units are randomly selected based on non-uniform probabilities determined from distribution of fisher effort from past surveys. The intent of this approach is to increase precision of data for the higher use periods.
F Harvest survey at Mud Springs 4/1/2015 4/30/2015 Concluded Hannah Dondy-Kaplan 8/19/2013 11:32:12 AM
Description: Five randomly selected weekdays and 5 randomly selected weekend days are surveyed per 2-month sample unit per pond. Within each of the randomly chosen sample days, one of the three following secondary sample units (sampling periods) are selected: (1) Morning; AM 6:00 a.m.- 10:00 a.m., (2) Mid-day; MD 10:00 am - 5:00 pm, and (3) Evening; PM 5:00 pm - 8:00 pm. The secondary sample units are randomly selected based on non-uniform probabilities determined from distribution of fisher effort from past surveys. The intent of this approach is to increase precision of data for the higher use periods.
G Harvest survey at Talmaks 4/1/2015 4/30/2015 Concluded Hannah Dondy-Kaplan 8/19/2013 11:32:12 AM
Description: Five randomly selected weekdays and 5 randomly selected weekend days are surveyed per 2-month sample unit per pond. Within each of the randomly chosen sample days, one of the three following secondary sample units (sampling periods) are selected: (1) Morning; AM 6:00 a.m.- 10:00 a.m., (2) Mid-day; MD 10:00 am - 5:00 pm, and (3) Evening; PM 5:00 pm - 8:00 pm. The secondary sample units are randomly selected based on non-uniform probabilities determined from distribution of fisher effort from past surveys. The intent of this approach is to increase precision of data for the higher use periods.
H Harvest survey at Tunnel Pond 4/1/2015 4/30/2015 Concluded Hannah Dondy-Kaplan 8/19/2013 11:32:12 AM
Description: Five randomly selected weekdays and 5 randomly selected weekend days are surveyed per 2-month sample unit per pond. Within each of the randomly chosen sample days, one of the three following secondary sample units (sampling periods) are selected: (1) Morning; AM 6:00 a.m.- 10:00 a.m., (2) Mid-day; MD 10:00 am - 5:00 pm, and (3) Evening; PM 5:00 pm - 8:00 pm. The secondary sample units are randomly selected based on non-uniform probabilities determined from distribution of fisher effort from past surveys. The intent of this approach is to increase precision of data for the higher use periods.
I DELIV Harvest Data Collection at Mud Springs, Talmaks, and Tunnel Pond 4/30/2015 Concluded Hannah Dondy-Kaplan 8/19/2013 11:32:12 AM
Description: Harvest data will be collected from Mud Springs, Talmaks, and Tunnel Pond using the creel survey design which provides individual estimates of effort, fisher hours, and harvest rate per two month period for each of the three ponds. The creel survey design applies a stratified two stage probability sampling approach as described by Malvestuto (1983).

Work Site ID Latitude Longitude State County Province Subbasin
46306 46.199051 -116.584141 Idaho Lewis Mountain Snake Clearwater
46379 46.469509 -116.24485 Idaho Clearwater Mountain Snake Clearwater
62092 46.17 -116.5605 Idaho Lewis Mountain Snake Clearwater

Primary Focal Species:
Trout, Rainbow (Oncorhynchus mykiss)
Secondary Focal Species:
None

Title Link
NONE - No data repository or not electronically available N/A
Study Plan Name Study Plan Owner Protocol State Sample Design Name
NPT Resident Fish Substitution Data Collection Activities v1.0 Tod Sween Draft Harvest monitoring at three ponds - Nez Perce Tribe v1.0

ID Name Type Optional Customized Based On Status
1127 Access-Access Creel Survey for Lakes and Reservoirs v1.0 Data Collection No N/A Finalized
184 Effort Estimation - Private Vessel Bar Crossing Count Method – Foggy days and Columbia River Estuary v1.0 Data Collection No N/A Finalized
973 Fish condition v1.0 Data Analysis/Interpretation No N/A Draft
3789 Standard Operating Procedures for the Collection, Processing, and Analysis of Stream Samples v1.0 Data Collection No N/A Finalized
72 Water Chemistry (EMAP) v1.0 Data Collection No N/A Finalized
320 Water Temperature-USGS Gauges v1.0 Data Collection No N/A Revising

Title Category Subcategory Subcategory focus 1 Subcategory focus 2
Collect Fecal Coliform Data Contaminants/Toxics/Pollutants Concentration: Bacteria (ID: 11) NA NA
Collect harvest data at three ponds Fish Catch Per Unit Effort (ID: 54) Fish Life Stage: Adult Fish NA
Monitor Fish Health at three ponds Fish Condition Factor (ID: 282) NA NA
Monitor Fish Habitat at three ponds Water Quality Dissolved Gas Concentration (By Gas) (ID: 155) NA NA
Collect Total Ammonia data Water Quality Nitrogen (ID: 157) NA NA
Collect Total Phosphorus data at Mud Springs Water Quality Phosphorus (ID: 159) NA NA
Monitor Fish Habitat at three ponds Water Quality Water Temperature (ID: 162) NA NA