View the details of the Independent Scientific Review Panel (ISRP) assessment for this project as part of the FY07-09 Solicitation Review.
Assessment Number: | 2002-037-00-ISRP-20060831 |
---|---|
Project: | 2002-037-00 - Freshwater Mussel Research and Restoration |
Review: | FY07-09 Solicitation Review |
Completed Date: | 8/31/2006 |
Final Round ISRP Date: | None |
Final Round ISRP Rating: | Meets Scientific Review Criteria (Qualified) |
Final Round ISRP Comment: | |
This proposal gives a nice background presentation including data collected (including maps) in previous years. This proposal has an exemplary section on past results and reporting of data. It is surprising that more taxonomic work has not been done on these organisms so the genetic analyses in the proposal are well justified, particularly if Anodonta turns out to be a species complex with multiple habitat and fish host requirements. One point that the background section could have made more clear was why so few mussels exist in the Umatilla River relative to the John Day River since both rivers have a long history of anthropogenic disturbance (e.g., mining grazing and logging), and intuitively they should have similar mussel faunas.
Some of these mussels are very long-lived, e.g., 50 years, and the shells can be used like tree-rings to track environmental changes. This fundable recommendation is qualified because better documentation is needed that the sample size is adequate. Have they done a power analysis to show that their sample size is adequate? It is of interest to note that in some areas around Seattle, mussels are used to monitor habitat restoration project effectiveness. It would also be useful to know if other mussel translocation efforts have been attempted in the Columbia River Basin, and if so, how well they have succeeded. |
|
Documentation Links: |
|
Proponent Response: | |
|