Project 1987-100-02 - Umatilla Anadromous Fish Habitat-Oregon Department of Fish and Wildlife (ODFW)
Project Number:
1987-100-02
Agency, Institution or Organization:
Oregon Department of Fish & Wildlife (ODFW)
Short Description:
The ongoing Umatilla Subbasin Fish Habitat Improvement Project (19871-100-02) is aimed at protecting (where possible) and enhancing/rehabilitating (where required), degraded fish habitat on private lands using passive and active restoration techniques.
Status:
Finalized
Province:
Columbia Plateau
Subbasin:
Umatilla
Contact Name:
Danny St. Hilaire
Contact Organization:
Oregon Department of Fish & Wildlife
Contact Email:
danny.r.sthilaire@state.or.us
Contact Address:
73471 Mytinger Lane
Contact City, State, Zip:
Pendleton OR 97801
Contact Role(s):
Information Transfer:
Project information will be included in annual project summary reports submitted to BPA, as well as in monthly status reports submitted to BPA through its on-line PISCES system. Through the Project's adaptive management strategy, information obtained during the O&M and M&E phases of individual projects will be used to refine future project implementation plans and designs, as well as modify operation and maintenance plans to maximize the potential for project success.

Description Latitude Longitude
Lower limit of Birch Creek at confluence with Umatilla River N 45 30' 28.72" W 118 52' 56.47"
Lower limit of East Birch Creek at confluence with Birch Creek N 45 29' 6.57" W 118 50' 3.39
Lower limit of West Birch Creek at confluence with Birch Creek N 45 29' 6.57" W 118 50' 3.39"
North Fork Meacham Creek at confluence with Meacham Creek N 45 31' 36.14" W 118 17' 26.25"
Confluence of Upper Meacham Creek/Twomile Creek N 45 30' 47.91" W 118 25' 16.99"
Upper mainstem Umatilla River at confluence with Meacham Creek N 45 42' 9.95" W 118 21' 43.29"

Name Primary Secondary
Chinook
Steelhead
Anadromous Fish

Short Objective Detailed Objective Strategy Subbasin Plan
Protect and restore riparian vegetation/habitat Protect and restore riparian vegetation, species diversity and community structure to promote positive interactions between the stream, riparian zone and floodplain. Establish stable conditions th... Consistent with Management Strategies No. 6, 7, 10, 11 and 12. Related to Aquatic Objective No. 2. Umatilla
Create naturally stable stream channels Create naturally stable channels along streams that have been destabilized by anthropogenic impacts. Establish conditions that will perpetuate and maintain normative ecological and physical proces... Consistent with Subbasin Plan Management Strategies 5, 7, 8, and 12. Related to Aquatic Objective 2. Umatilla
Enhance instream habitat conditions Enhance instream habitat conditions through structure placement and the modification of detrimental land and water use practices.... Consistent with Subbasin Plan Management Strategies 2, 3, 5, 8, 9, 11 and 12. Related to Aquatic Objectives 2, 4 and 11.... Umatilla
Improve passage efficiency Improve passage efficiency for all species and life stages of salmonids within the Subbasin. Design and implement projects aimed at removing or modifying structures (diversion dams, culverts, bridg... Consistent with Subbasin Plan Management Strategies 5, 8 and 13. Related to Aquatic Objectives 2, 4 and 12.... Umatilla
Conduct project operation and maintenance Conduct operation and maintenance activities on all existing riparian exclosure fences, plantings and instream structures, to ensure maximum program benefits within leased areas.... Consistent with Subbasin Plan Management Strategies 5, 6, 7, 8, 11, 12 and 13. Related to Aquatic Objective 2.... Umatilla
Monitor and Evaluate fish habitat projects Monitor and Evaluate Umatilla Subbasin Fish Habitat Improvement Project completion and effectiveness to determine if goals and objectives are being met at the project, reach, watershed and Subbasin... Consistent with Subbasin Plan Management Strategies 5, 6, 7, 8, 11, 12 and 13. Related to Aquatic Objectives 1, 2 and 14.... Umatilla
Communication and Coordination ADMINISTRATIVE OBJECTIVE - Ensure maximum communication, education and coordination of habitat enhancement activities, by actively pursuing opportunities to work with, educate and learn from person... All Umatilla
Project management ADMINISTRATIVE OBJECTIVE - Ensure the effective and efficient management and implementation of Fish Habitat Improvement Projects.... All Umatilla

Line Item Notes FY07 Cost FY08 Cost FY09 Cost
Personnel Based on annual merit increase of 5% $91,680 $96,264 $101,077
Fringe Benefits OPE Estimated @ 55% $50,424 $52,945 $55,593
Supplies Based on annual increase of 3% $49,626 $50,910 $52,240
Travel Training and workshops $1,500 $1,750 $2,000
Overhead Calculated at 35.87% $69,312 $72,411 $75,653
Other Contractual Services (no overhead applied) $59,225 $61,002 $62,832

Provision Funding Source Type FY07 Value FY08 Value FY09 Value

WE ID WE Name Title Budget Start Date End Date Objectives Metrics
22 Maintain Vegetation Conduct Planting Project Maintenance $22,000 10/01/2006 09/30/2009 Conduct project operation and maintenance Protect and restore riparian vegetation/habitat
22 Maintain Vegetation Maintain CREP Planting Projects $60,000 10/01/2006 09/30/2009 Conduct project operation and maintenance Protect and restore riparian vegetation/habitat
34 Develop Alternative Water Source Construct Off-Site Livestock Water Developments $20,000 10/01/2006 09/30/2009 Protect and restore riparian vegetation/habitat
40 Install Fence Construct Livestock Exclusion Fence $95,000 10/01/2006 09/30/2009 Protect and restore riparian vegetation/habitat * # of miles of fence: 12.0
47 Plant Vegetation Implement Riparian Planting Projects $35,000 10/01/2006 09/30/2009 Create naturally stable stream channels Protect and restore riparian vegetation/habitat * # of riparian miles treated: 4.0
53 Remove vegetation Invasive Weed Control $33,000 10/01/2006 09/30/2009 Conduct project operation and maintenance Protect and restore riparian vegetation/habitat * # of acres treated: 150
185 Produce Pisces Status Report Produce Monthly Pisces Status Reports $8,744 10/01/2006 09/30/2009 Project management
114 Identify and Select Projects Initiate Landowner Contacts/Identify and Select Projects $20,000 10/01/2006 09/30/2009 Project management
118 Coordination Interagency Communicatin/Coordination $15,000 10/01/2006 09/30/2009 Communication and Coordination
118 Coordination Landowner Coordination $15,000 10/01/2006 09/30/2009 Communication and Coordination
119 Manage and Administer Projects Contract Preparation/Review $25,000 10/01/2006 09/30/2009 Project management
119 Manage and Administer Projects Manage and Administer Projects $17,500 10/01/2006 09/30/2009 Project management
157 Collect/Generate/Validate Field and Lab Data Project O&M Inspections $15,000 10/01/2006 09/30/2009 Conduct project operation and maintenance Focal Area: Tributaries
92 Lease Land Develop and Prepare Coop Agreements/Leases/Easements $15,000 10/01/2006 09/30/2009 Create naturally stable stream channels Enhance instream habitat conditions Improve passage efficiency Project management Protect and restore riparian vegetation/habitat * # of acres of new lease: 48.0
132 Produce Annual Report Annual Summary Report Preparation/Submission $23,000 10/01/2006 09/30/2009 Communication and Coordination Monitor and Evaluate fish habitat projects Project management
29 Increase Instream Habitat Complexity Implement Habitat Improvement/Bank Stabilization Projects $55,000 10/01/2006 09/30/2009 Enhance instream habitat conditions * # of stream miles treated: 4.0
157 Collect/Generate/Validate Field and Lab Data Reconnaisance and Pre-Work Channel/Habitat Surveys $35,000 10/01/2006 09/30/2009 Create naturally stable stream channels Enhance instream habitat conditions Improve passage efficiency Focal Area: tributaries
157 Collect/Generate/Validate Field and Lab Data Collect & Summarize Stream Temperature Data $15,000 10/01/2006 09/30/2009 Monitor and Evaluate fish habitat projects Secondary R, M, and E Type: Status and Trend Monitoring
157 Collect/Generate/Validate Field and Lab Data Operate Birch Creek Stream Flow Gauges $30,000 10/01/2006 09/30/2009 Conduct project operation and maintenance Focal Area: Tributaries
174 Produce Plan Produce Project-Specific Plans $20,000 10/01/2006 09/30/2009 Project management
175 Produce Design and/or Specifications Develop and Prepare Project Designs $40,000 10/01/2006 09/30/2009 Create naturally stable stream channels Enhance instream habitat conditions Improve passage efficiency
165 Produce Environmental Compliance Documentation Prepare Environmental Compliance Documentation $24,000 10/01/2006 09/30/2009 Project management
165 Produce Environmental Compliance Documentation Environmental Surveys $20,000 10/01/2006 09/30/2009 Project management
99 Outreach and Education Program Presentations/Information Sessions/Inquires $15,000 10/01/2006 09/30/2009 Communication and Coordination * # of general public reached: 50 * # of students reached: 30 * # of teachers reached: 3
122 Provide Technical Review Provide input and technical review $15,000 10/01/2006 09/30/2009 Project management
186 Operate and Maintain Habitat/Passage Maintain Livestock Exclusion Fences $30,000 10/01/2006 09/30/2009 Conduct project operation and maintenance Protect and restore riparian vegetation/habitat
186 Operate and Maintain Habitat/Passage Maintain Stable Channel Designs/Instream Structures/Bank Stability Structures $60,000 10/01/2006 09/30/2009 Conduct project operation and maintenance Create naturally stable stream channels Enhance instream habitat conditions
30 Realign, Connect, and/or Create Channel Implement Stable Channel Design Projects $60,000 10/01/2006 09/30/2009 Create naturally stable stream channels * # of stream miles treated, including off-channels, after realignment: 2.0
38 Improve/Relocate Road Implement Projects to Improve/Relocate/Decommission Roads $60,000 10/01/2006 09/30/2009 Enhance instream habitat conditions * # of road miles improved, upgraded, or restored: 2.0
154 Develop and Negotiate Water Right Transaction Purchase Water Rights From Willing Sellers $25,000 10/01/2006 09/30/2009 Enhance instream habitat conditions
85 Remove/Modify Dam Implement Barrier Remediation Projects $55,000 10/01/2006 09/30/2009 Improve passage efficiency * # of miles of habitat accessed: 20.0
188 Provide Public Access/Information Maintain Informational Kiosk/Signs $3,200 10/01/2006 09/30/2009 Communication and Coordination
157 Collect/Generate/Validate Field and Lab Data Collect M&E Data $25,000 10/01/2006 09/30/2009 Monitor and Evaluate fish habitat projects Primary R, M, and E Type: Project Implementation/Compliance Monitoring Primary R, M, and E Type: Action Effectiveness Research

Date Reviewer Short Recommendation Comments FY07 FY08 FY09
06/02/2006 ISRP Response requested This and the CTUIR proposal 198710001 should be presented as a unified proposal, as requested in previous reviews. At the very least, this proposal should better demonstrate its link to the CTUIR habi... More N/A N/A N/A
08/31/2006 ISRP Not fundable (Qualified) See comments under 198343600 and 198710001, and in particular, 199000501, as well as others from this subbasin. The Umatilla ecosystem and the human intervention within it remains complex, and the ... More N/A N/A N/A
09/15/2006 NPCC $280,264.00 $280,264.00 $280,264.00
10/23/2006 NPCC Fund See decision memo discussion of the Umatilla subbasin projects. $280,264.00 $280,264.00 $280,264.00