Show new navigation
On
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
RSS Feed for updates to Project 1994-015-00 - Idaho Fish Screening Improvement Follow this via RSS feed. Help setting up RSS feeds?

View 2007-2009 Proposal

Project 1994-015-00 - Idaho Fish Screening Improvement
Project Number:
1994-015-00
Agency, Institution or Organization:
Idaho Department of Fish & Game
Short Description:
The project protects anadromous fish and improves fish passage in Idaho�s anadromous fish corridors by consolidation and elimination of irrigation diversions, conservation of water, and screening fish from gravity and pump water withdrawal systems.
Status:
Finalized
Province:
Mountain Snake
Subbasin:
Salmon
Contact Name:
Lynn Stratton
Contact Organization:
Idaho Department of Fish & Game
Contact Email:
lstratton@idfg.idaho.gov
Contact Address:
97 Hwy 93 N PO Box 1336
Contact City, State, Zip:
Salmon ID 83467
Contact Role(s):
Project Lead
Information Transfer:
Data generated by this program is uploaded into the Idaho Statewide Stream Database. Reports on work completed are available from the Idaho Department of Fish & Game, Bonneville Power Administration, and the Columbia River Fisheries Development Program (NOAA). Flow measurements are used by the Idaho Department of Water Resources and other agencies. Engineered drawings of fish screens are made available to other agencies working on fish screening projects. A website is maintained with basic fish screen data at http://www.fishandgame.idaho.gov/.

Description Latitude Longitude
Salmon River Subbasin

Name Primary Secondary
All Anadromous Salmonids
Cutthroat Trout
Trout
Trout
Whitefish

Short Objective Detailed Objective Strategy Subbasin Plan
Aquatic Objective 2A By 4th field hydrologic unit, carry out focused activities designed to improve our understanding and definition of small populations, while protecting the genetic integrity of wild populations th... 2A4, 2A7 Salmon
Aquatic Objective 12A Rehabilitate connectivity where it will benefit native fish populations, with an emphasis on bull trout.... 12A1, 12A2 Salmon
Aquatic Objective 12B Implement fish screening in tributaries after de-watering and passage issues are resolved. 12B1, 12B2 Salmon
Aquatic Objective 14A Reduce potential losses of fishes that enter irrigation complexes. 14A1, 14A2, 14A3, 14A4, 14A5, 14A6, Salmon
Aquatic Objective 14B Improve connectivity of tributaries that are currently intercepted by irrigation complexes. 14B1, 14B2, 14B3, 14B4 Salmon
Aquatic Objective 29B Reconnect main stem tributaries and modify diversion structures as needed to provide for Chinook Salmon and steelhead migration.... 12A1, 12A2 Salmon
Aquatic Objective 32A Reconnect main stem tributaries and modify diversion structures as needed to provide for Chinook and steelhead migration.... 12A1, 12A2 Salmon
Aquatic Objective 33B Reconnect main stem tributaries and modify diversion structures as needed to provide for Chinook and steelhead migration.... 12A1, 12A2 Salmon
Aquatic Objective 35B Provided there is adequate funding, personnel, and landowner participation, reconnect a minimum of one tributary every three years that are currently defined as partially or seasonally inaccessible... 12A1, 12A2, 12B1, 12B2 Salmon
Aquatic Objective 40A Reconnect main stem tributaries and modify diversion structures as needed to provide for Chinook and steelhead migration.... 12A1, 12A2, 12B1, 12B2 Salmon
Aquatic Objective 41B Improve connectivity and access to habitat currently blocked by man made barriers. 12A1, 12A2 Salmon

Line Item Notes FY07 Cost FY08 Cost FY09 Cost
Personnel Four permanent employees 1/2 time. Five temporary employees 8 months each performing biological work. Two temporary employees performing O&M five months time each. Assumes an annual inflation rate of 3%. $150,076 $154,578 $159,215
Travel Per deim, lodging, field camp meals. $15,300 $15,500 $15,800
Supplies Minor tools, office supplies, minor equipment, lubricants, fish screen parts, field clothing, waders, PIT antennas, utilities, plants and seedlings for rehab of construction sites. $65,000 $65,000 $65,000
Other Vehicle and equipment rentals. $20,580 $21,200 $21,500
Other Archaeological surveys, cultural monitoring, engineering services, certified inspections on equipment. $75,000 $75,000 $75,000
Capital Equipment Fish screens,fish passageways, pipelines, sprinkler systems.. $501,133 $533,559 $507,634
Overhead Approved overhead rate by cognizant audit agency. Current rate is 21%. Rate is calculated and established annually. $82,196 $83,726 $85,251
Fringe Benefits Fringe varies by job type. This calculation is an average of all positions. Assumes an inflation rate of 3% annually. $65,455 $67,419 $69,442

Provision Funding Source Type FY07 Value FY08 Value FY09 Value

WE ID WE Name Title Budget Start Date End Date Objectives Metrics
69 Install Fish Screen Thompson Creek Fish Screen Project $16,000 10/01/2006 04/01/2007 Aquatic Objective 12B
69 Install Fish Screen Knapp Creek-01 and 02 Fish Screening Project $97,000 10/01/2006 06/30/2007 Aquatic Objective 12B * Does the screen meet NOAA/FSOC specs?: Yes * Is the screen New or a Replacement?: Replacement
69 Install Fish Screen Wimpey Creek-02 Fish Screen & Passage Project $22,000 10/01/2006 11/30/2006 Aquatic Objective 12B
69 Install Fish Screen Challis Creek-04 Fish Screen Project $37,500 10/01/2006 12/30/2006 Aquatic Objective 12B * Does the screen meet NOAA/FSOC specs?: Yes * Is the screen New or a Replacement?: New
69 Install Fish Screen East Fork-13 Fish Screen Project $44,000 03/15/2007 06/30/2007 Aquatic Objective 12B * Does the screen meet NOAA/FSOC specs?: Yes * Is the screen New or a Replacement?: New
69 Install Fish Screen SEF-16/16A Consolidation Project $68,000 03/15/2008 06/30/2008 Aquatic Objective 12B * Does the screen meet NOAA/FSOC specs?: Yes * Is the screen New or a Replacement?: Replacement
69 Install Fish Screen SVCGC-03 Fish Screen and Passage Project $18,000 10/01/2006 12/30/2006 Aquatic Objective 12B * Does the screen meet NOAA/FSOC specs?: Yes * Is the screen New or a Replacement?: New
69 Install Fish Screen SEF-14 Fish Screen Project $47,500 03/15/2007 06/30/2007 Aquatic Objective 12B * Does the screen meet NOAA/FSOC specs?: Yes * Is the screen New or a Replacement?: Replacement
184 Install Fish Passage Structure S-39 and S-39A Fish Passage Barrier Project $6,500 10/01/2006 12/30/2006 Aquatic Objective 14A * Does the structure remove or replace a fish passage barrier?: No
69 Install Fish Screen Beaver Creek-03 Screen Project $19,500 10/01/2006 12/30/2006 Aquatic Objective 12B * Flow rate at the screen diversion allowed by the water right: Yes * Is the screen New or a Replacement?: New
69 Install Fish Screen SSmC-01 Fish Screen & Passage Project $23,000 10/01/2007 12/30/2007 Aquatic Objective 12B * Does the screen meet NOAA/FSOC specs?: Yes * Is the screen New or a Replacement?: New
114 Identify and Select Projects Develop prelim plans, projects and proposals $58,000 10/01/2006 09/30/2009
119 Manage and Administer Projects Perform contract and project management. $166,712 10/01/2006 09/30/2009
132 Produce Annual Report Produce annual report $18,000 07/01/2007 08/30/2009
141 Produce Status Report Produce quarterly reports $5,000 10/01/2006 09/30/2009
157 Collect/Generate/Validate Field and Lab Data Perform fisheries investigations on five designated tributary streams. $54,800 10/01/2006 09/30/2007 Primary R, M, and E Type: Data collection Primary R, M, and E Type: Project Implementation/Compliance Monitoring
157 Collect/Generate/Validate Field and Lab Data Perform fisheries investigations on six designated streams. $57,000 10/01/2007 09/30/2008 Primary R, M, and E Type: Project Implementation/ Compliance Monitoring Focal Area: Tributaries
175 Produce Design and/or Specifications Survey project sites and produce designs. $249,000 10/01/2006 09/30/2009
165 Produce Environmental Compliance Documentation Perform cultural surveys, biological assessments, NEPA checklists, etc. $196,272 10/01/2006 09/30/2009
186 Operate and Maintain Habitat/Passage Perform Fish Screen and Passageway O&M $150,000 10/01/2006 09/30/2009 Aquatic Objective 12B
98 Other Maintain Office/Shop Operations $110,000 10/01/2006 09/30/2009
157 Collect/Generate/Validate Field and Lab Data Perform fisheries investigations on six designated streams. $62,000 10/01/2008 09/30/2009 Primary R, M, and E Type: Project Implementation/ Compliance Monitoring
149 Install Pipeline Carmen Creek Water Conservation Project $55,000 10/01/2008 09/30/2009 Aquatic Objective 41B * Amount of unprotected water flow returned to the stream by conservation in cfs: 3 cfs
150 Install Sprinkler Upper Carmen Creek Improvement Project $280,000 10/01/2008 09/30/2009 Aquatic Objective 41B * Amount of unprotected water flow returned to the stream by conservation in cfs: 5cfs
69 Install Fish Screen Big Casino Creek Screen Project $16,800 10/01/2006 09/30/2007 Aquatic Objective 12B * Does the screen meet NOAA/FSOC specs?: Yes * Is the screen New or a Replacement?: New
69 Install Fish Screen Freeman Creek-02 & 03 Fish Screening Project $34,300 10/01/2008 05/30/2009 Aquatic Objective 12B Aquatic Objective 41B * Does the screen meet NOAA/FSOC specs?: Yes * Is the screen New or a Replacement?: Replacement
84 Remove/Install Diversion Freeman Creek Fish Passaage Project $28,000 10/01/2008 05/30/2009 Aquatic Objective 14B Aquatic Objective 41B * # of miles of habitat accessed: 1.0
69 Install Fish Screen P-13 Fish Screen Project $0 10/01/2008 09/30/2009 Aquatic Objective 12B Aquatic Objective 33B * Does the screen meet NOAA/FSOC specs?: Yes * Is the screen New or a Replacement?: Replacement
149 Install Pipeline Big Timber-02 Pipeline $270,000 10/01/2007 09/30/2008 Aquatic Objective 12B Aquatic Objective 40A * Amount of unprotected water flow returned to the stream by conservation in cfs: 5cfs * Estimated # of miles of primary stream reach improvement: 1.0 miles
69 Install Fish Screen Big Timber-02 Screen Project $50,000 03/15/2009 06/30/2009 Aquatic Objective 12B Aquatic Objective 40A * Does the screen meet NOAA/FSOC specs?: Yes * Is the screen New or a Replacement?: New
84 Remove/Install Diversion Big Springs Creek Fish Passage Project $45,000 10/01/2006 04/30/2007 Aquatic Objective 12B Aquatic Objective 32A * # of miles of habitat accessed: 3 miles
69 Install Fish Screen PBSC-09 Fish Screen Project $28,000 10/01/2006 12/30/2006 Aquatic Objective 12B * Does the screen meet NOAA/FSOC specs?: Yes * Is the screen New or a Replacement?: New
69 Install Fish Screen Wimpey Creek Fish Screening Project Phase I $232,000 10/01/2006 09/30/2009 Aquatic Objective 12B Aquatic Objective 35B * Does the screen meet NOAA/FSOC specs?: Yes * Is the screen New or a Replacement?: New
84 Remove/Install Diversion Wimpey Creek Diversion Improvement Project Phase I $56,000 10/01/2006 09/30/2008 Aquatic Objective 12B Aquatic Objective 35B
98 Other Approved Contract Government Overhead $251,173 10/01/2007 09/30/2010
69 Install Fish Screen S-23A Fish Screen Project $54,227 06/01/2008 08/30/2008 Aquatic Objective 12B * Does the screen meet NOAA/FSOC specs?: Yes * Is the screen New or a Replacement?: Replacement
98 Other Vehicle & Equipment Rentals $63,280 10/01/2006 09/30/2009
69 Install Fish Screen Panther Creek Consolidation Project $0 10/01/2006 09/30/2007 Aquatic Objective 12B Aquatic Objective 14B * Does the screen meet NOAA/FSOC specs?: Yes * Is the screen New or a Replacement?: New
69 Install Fish Screen Upper Iron Creek Screen Project $0 10/01/2006 09/30/2009 Aquatic Objective 12B * Does the screen meet NOAA/FSOC specs?: Yes * Is the screen New or a Replacement?: New

Date Reviewer Short Recommendation Comments FY07 FY08 FY09
06/02/2006 ISRP Response requested In most regards this is a very nicely prepared proposal that includes an excellent overview of project history. Responses are needed on two items. The ISRP wonders where the agency currently stands in... More N/A N/A N/A
08/31/2006 ISRP Fundable This was a very nicely prepared proposal that included an excellent overview of project history and results to date. Very clear and detailed responses were provided to reviewers' questions. Responses ... More N/A N/A N/A
09/15/2006 NPCC Capital Project or at least elements of the project can be capitalized. Final determination will most likely not occur until contracting (per BPA 8/11/06). More $834,740.00 $834,740.00 $834,740.00
10/23/2006 NPCC Fund Capital Project or at least elements of the project can be capitalized. Final determination will most likely not occur until contracting (per BPA 8/11/06). More $834,740.00 $834,740.00 $834,740.00