Project 2003-017-00 - Integrated Status and Effectiveness Monitoring Program (ISEMP)
Project Number:
2003-017-00
Agency, Institution or Organization:
Northwest Fisheries Science Center
Short Description:
ISEMP is a collaborative effort to design, implement and evaluate Status and Trends Monitoring for salmon and steelhead populations and habitat and watershed-scale Effectiveness Monitoring for restoration actions impacting salmon habitat in the CRB.
Status:
Finalized
Province:
Mainstem/Systemwide
Subbasin:
Systemwide
Contact Name:
Chris Jordan
Contact Organization:
NOAA/NMFS/NWFSC-NRS
Contact Email:
chris.jordan@noaa.gov
Contact Address:
CBD - 950 NAL / 2032 SE OSU Dr.
Contact City, State, Zip:
Newport, OR 97365
Contact Role(s):
Project Lead
Information Transfer:
Web-based data, tools and document communication Guidance documents for regional management agencies Progress reporting Peer-reviewed journal articles Outreach and presentations

Description Latitude Longitude
John Day Basin - basinwide Pilot Project habitat action effectiveness monitoring and population habitat status and trend monitoring. 45.701218446143905 -120.591836362287270
Wenatchee Subbasin - basinwide Pilot Project population status and trend monitoring. 47.463056933757050 -120.345681694716400
Entiat Subbasin - basinwide Pilot Project habitat actions effectiveness monitoring. 47.666301738079156 -120.264364629575820
Salmon Subbasin - South Fork Salmon River Pilot Project habitat and population status and trend monitoring. 45.366837533728810 -115.518263907456730
Salmon River Subbasin - Lemhi River Pilot Project habitat action effectiveness monitoring. 45.176808643728750 -113.882082956270210

Name Primary Secondary
Chinook
Chinook
All Anadromous Salmonids
Steelhead
Steelhead
Steelhead

Short Objective Detailed Objective Strategy Subbasin Plan
1. Programmatic coordination, design, planning and Coordinate implementation of pilot-scale habitat action effectiveness and habitat and population status and trend monitoring in the Wenatchee/Entiat, John Day, and Salmon subbasins... The objectives of the ISEMP are supported by the NPCC (2000) fish and wildlife program (page 32), in the relevant subbasin plans, and the ISEMP is explicitly named and supported in the final UPA (P... None
2. Indicators and metric development and testing This question has two scales, the first is determining whether landscape scale features can provide important determinants of freshwater habitat condition and aquatic processes and whether these fe... The objectives of the ISEMP are supported by the NPCC (2000) fish and wildlife program (page 32), in the relevant subbasin plans, and the ISEMP is explicitly named and supported in the final UPA (P... None
3. Protocol development, refinement and testing This proposal develops habitat and population monitoring protocols, implements them at a test-scale in the Wenatchee/Entiat, John Day, and Salmon subbasins, and refines the methods based on impleme... The objectives of the ISEMP are supported by the NPCC (2000) fish and wildlife program (page 32), in the relevant subbasin plans, and the ISEMP is explicitly named and supported in the final UPA (P... None
4. Sampling design development and testing This objective develops design alternatives fo the implementation of indicators, metrics, and protocols developed under Objecives 2 and 3 (above) and implements the designs at the scale of Pilot su... The objectives of the ISEMP are supported by the NPCC (2000) fish and wildlife program (page 32), in the relevant subbasin plans, and the ISEMP is explicitly named and supported in the final UPA (P... None
5. Implement effectiveness and status/trend plans Objectives 1, 2, 3, and 4 (above) provide components of an integrated monitoring plan. This objective adaptively implements the plans in the Wenatchee/Entiat, John Day, and Salmon subbasins... The objectives of the ISEMP are supported by the NPCC (2000) fish and wildlife program (page 32), in the relevant subbasin plans, and the ISEMP is explicitly named and supported in the final UPA (P... None
6. Evaluation tools development and testing This objective develops statistical methods to reduce and analyze data with respect to reliability, precision versus cost, and effectiveness at addressing information needs.... The objectives of the ISEMP are supported by the NPCC (2000) fish and wildlife program (page 32), in the relevant subbasin plans, and the ISEMP is explicitly named and supported in the final UPA (P... None
7. Data management tools development and testing Evaluation of project goals (e.g., adaptive management of designs, indicators, metrics etc.) requires that data are available in a common and accessible format. This objective is aimed at developin... The objectives of the ISEMP are supported by the NPCC (2000) fish and wildlife program (page 32), in the relevant subbasin plans, and the ISEMP is explicitly named and supported in the final UPA (P... None

Line Item Notes FY07 Cost FY08 Cost FY09 Cost
Fringe Benefits Salmon River ISEMP $210,000 $231,002 $254,103
Personnel Salmon River ISEMP $602,006 $662,207 $728,427
Overhead Salmon River ISEMP $203,002 $223,302 $245,632
Supplies Salmon River ISEMP $224,002 $246,402 $271,043
Travel Salmon River ISEMP $161,002 $177,102 $194,812
Personnel Wenatchee/Entiat ISEMP $787,379 $861,300 $942,613
Fringe Benefits Wenatchee/Entiat ISEMP $246,495 $269,637 $295,092
Overhead Wenatchee/Entiat ISEMP $237,015 $259,266 $283,743
Travel Wenatchee/Entiat ISEMP $16,346 $17,880 $19,568
Supplies Wenatchee/Entiat ISEMP $347,349 $379,959 $415,830
Personnel Umbrella ISEMP $188,322 $192,965 $197,839
Fringe Benefits Umbrella ISEMP $99,117 $101,560 $104,126
Overhead Umbrella ISEMP $99,117 $101,560 $104,126
Travel Umbrella ISEMP $9,912 $10,156 $10,413
Personnel John Day ISEMP $223,512 $198,074 $153,067
Fringe Benefits John Day ISEMP $77,969 $69,096 $53,395
Overhead John Day ISEMP $75,370 $66,792 $51,616
Supplies John Day ISEMP $83,167 $73,702 $56,955
Travel John Day ISEMP $59,776 $52,973 $40,937
Personnel John Day Habitat $0 $120,000 $120,000
Fringe Benefits John Day Habitat $0 $43,000 $43,000
Overhead John Day Habitat $0 $81,500 $81,500
Supplies John Day Habitat $0 $81,500 $81,500

Provision Funding Source Type FY07 Value FY08 Value FY09 Value
Wen/Ent--Coordination and technical oversight by RTT multiple agencies In-Kind $36,000 $39,600 $43,560
Wen/Ent--Genetic sampling in Wenatchee NOAA Fisheries In-Kind $300,000 $330,000 $363,000
Wen/Ent--Contributions to PIT tagging NOAA Fisheries In-Kind $240,000 $0 $0
Wen/Ent--Contributions to habitat surveying Wa. Dept. of Ecology In-Kind $28,924 $31,816 $34,998
Wen/Ent--Flow gaging station operations Wa. Dept. of Ecology In-Kind $96,000 $105,600 $116,160
Wen/Ent--Development of RIVPACS model for macroinvertebrate analysis Wa. Dept. of Ecology In-Kind $10,000 $0 $0
Wen/Ent--Contribution to snorkel surveying NOAA Fisheries In-Kind $100,000 $110,000 $121,000
Wen/Ent--Survey and analysis of salmon and steelhead habitat access Wa. Dept. of Fish and Wildlife In-Kind $200,000 $0 $0
Wen/Ent--Depth fines sampling in Wenatchee and Entiat subbasins U.S. Forest Service In-Kind $50,000 $55,000 $60,500
Wen/Ent--Entiat monitoring planning and oversight U.S. Forest Service In-Kind $10,000 $11,000 $12,100
Wen/Ent--Contributions to snorkel, recon, and redd surveying U.S. Forest Service In-Kind $20,000 $22,000 $24,200
Wen/Ent--Smolt trapping contributions Chelan PUD In-Kind $249,256 $274,182 $301,600
Wen/Ent--Other BPA contributions to smolt trapping BPA Reproductive Success and Coho studies In-Kind $68,062 $74,868 $82,355
Wen/Ent--Spawning ground survey contributions Chelan PUD In-Kind $160,245 $176,270 $193,896
Wen/Ent--Other spawning ground surveys (summers in Entiat and springers in Entiat and Wenatchee) agencies not yet identified In-Kind $300,000 $330,000 $363,000
Wen/Ent--Contributions to spawning ground surveys NOAA Fisheries In-Kind $100,000 $110,000 $121,000
Wen/Ent--PIT tagging in Wenatchee Chelan PUD In-Kind $100,000 $110,000 $121,000
Remote Sensing Project staff to develop landscape-scale environmental co-variates USBoR In-Kind $75,000 $75,000 $0
Data analysis tool development support -- collaborations with staff and academic partners NOAA/NMFS In-Kind $75,000 $75,000 $0
Data Management tool development: Protocal tracking software and protocol metadatabase construction USBoR In-Kind $100,000 $30,000 $30,000

WE ID WE Name Title Budget Start Date End Date Objectives Metrics
118 Coordination Umbrella - coordinate design, RME implementation, and habitat actions proposed in the three Pilot Project subbasine (Wenatchee/Entiat, John Day, and Salmon $325,123 10/01/2007 09/30/2010 1. Programmatic coordination, design, planning and 5. Implement effectiveness and status/trend plans
119 Manage and Administer Projects Umbrella - assist in planning activities within Pilot Project subbasins, administer contracts for RME in individual Pilot Subbasins $162,562 10/01/2007 09/30/2010 1. Programmatic coordination, design, planning and 5. Implement effectiveness and status/trend plans
160 Create/Manage/Maintain Database Umbrella - create database structure to store RME data from the Pilot Project subbasins, provide database infrastructure, and maintain the database $162,562 10/01/2007 09/30/2010 6. Evaluation tools development and testing 7. Data management tools development and testing
162 Analyze/Interpret Data Umbrella - complie, reduce, and analyze RME data collected in individual Pilot Project subbasins to address study objectives $243,843 10/01/2007 09/30/2010 6. Evaluation tools development and testing 7. Data management tools development and testing
174 Produce Plan Umbrella - adaptively manage umbrella plan, distribute efforts among Pilot Project subbasins to meet overall project objectives, adaptively revise plan based on Pilot Project outcomes $325,123 10/01/2007 09/30/2010 1. Programmatic coordination, design, planning and 5. Implement effectiveness and status/trend plans 6. Evaluation tools development and testing 7. Data management tools development and testing
70 Install Fish Monitoring Equipment John Day Pilot Project - Install PIT tag arrays $39,405 10/01/2007 09/30/2010 2. Indicators and metric development and testing 3. Protocol development, refinement and testing 4. Sampling design development and testing 5. Implement effectiveness and status/trend plans
118 Coordination John Day Pilot Project - Coordinate RME implementation within subbasin and with umbrella Pilot Project $77,649 10/01/2007 09/30/2010 1. Programmatic coordination, design, planning and 5. Implement effectiveness and status/trend plans
119 Manage and Administer Projects John Day Pilot Project - manage on-the-ground implementation of RME activities, administer subcontracts $96,739 10/01/2007 09/30/2010 1. Programmatic coordination, design, planning and 5. Implement effectiveness and status/trend plans
156 Develop RM&E Methods and Designs John Day Pilot Project - develop sampling methods, attributes, and response designs $28,547 10/01/2007 09/30/2010 1. Programmatic coordination, design, planning and 5. Implement effectiveness and status/trend plans
157 Collect/Generate/Validate Field and Lab Data John Day Pilot Project - collect data as described in Pilot Project study design $727,533 10/01/2007 09/30/2010 2. Indicators and metric development and testing 3. Protocol development, refinement and testing 4. Sampling design development and testing 5. Implement effectiveness and status/trend plans Primary R, M, and E Type: safda
158 Mark/Tag Animals John Day Pilot Project - tag and mark juvenile and adult salmonids as dictated by study design $84,664 10/01/2007 09/30/2010 2. Indicators and metric development and testing 3. Protocol development, refinement and testing 4. Sampling design development and testing 5. Implement effectiveness and status/trend plans
160 Create/Manage/Maintain Database John Day Pilot Project - compile project data, perform quality control, and upload to Pilot Project umbrella database $46,253 10/01/2007 09/30/2010 2. Indicators and metric development and testing 3. Protocol development, refinement and testing 4. Sampling design development and testing
162 Analyze/Interpret Data John Day Pilot Project - reduce and analyze project data at subbasin and umbrella (combined across Pilot subbasins) scales $178,516 10/01/2007 09/30/2010 6. Evaluation tools development and testing 7. Data management tools development and testing
174 Produce Plan John Day Pilot Project - develop and adaptively update study design for John Day Pilot Project $57,095 10/01/2007 09/30/2010 1. Programmatic coordination, design, planning and 2. Indicators and metric development and testing 3. Protocol development, refinement and testing 4. Sampling design development and testing 5. Implement effectiveness and status/trend plans 6. Evaluation tools development and testing 7. Data management tools development and testing
118 Coordination Wenatchee/Entiat Pilot Project - coordinate design, RME implementation, and habitat actions proposed in the three Pilot Project subbasine (Wenatchee/Entiat, John Day, and Salmon) $271,189 10/01/2007 09/30/2010 1. Programmatic coordination, design, planning and 5. Implement effectiveness and status/trend plans
119 Manage and Administer Projects Wenatchee/Entiat Pilot Project - manage on-the-ground implementation of RME activities, administer subcontracts $397,306 10/01/2007 09/30/2010 1. Programmatic coordination, design, planning and 5. Implement effectiveness and status/trend plans
156 Develop RM&E Methods and Designs Wenatchee/Entiat Pilot Project - develop sampling methods, attributes, and response designs $13,991 10/01/2007 09/30/2010 1. Programmatic coordination, design, planning and 5. Implement effectiveness and status/trend plans
157 Collect/Generate/Validate Field and Lab Data Wenatchee/Entiat Pilot Project - collect data as described in Pilot Project study design $3,807,329 10/01/2007 09/30/2010 2. Indicators and metric development and testing 3. Protocol development, refinement and testing 4. Sampling design development and testing 5. Implement effectiveness and status/trend plans
158 Mark/Tag Animals Wenatchee/Entiat Pilot Project - tag and mark juvenile and adult salmonids as dictated by study design $204,810 10/01/2007 09/30/2010 2. Indicators and metric development and testing 3. Protocol development, refinement and testing 4. Sampling design development and testing 5. Implement effectiveness and status/trend plans
160 Create/Manage/Maintain Database Wenatchee/Entiat Pilot Project - compile project data, perform quality control, and upload to Pilot Project umbrella database $119,002 10/01/2007 09/30/2010 2. Indicators and metric development and testing 3. Protocol development, refinement and testing 4. Sampling design development and testing
162 Analyze/Interpret Data Wenatchee/Entiat Pilot Project - reduce and analyze project data at subbasin and umbrella (combined across Pilot subbasins) scales $69,037 10/01/2007 09/30/2010 6. Evaluation tools development and testing 7. Data management tools development and testing
165 Produce Environmental Compliance Documentation Wenatchee/Entiat Pilot Project - prepare/assist in preparation of handling permits for research $59,933 10/01/2007 09/30/2010 1. Programmatic coordination, design, planning and 5. Implement effectiveness and status/trend plans
174 Produce Plan Wenatchee/Entiat Pilot Project - develop and adaptively update study design documentation $136,410 10/01/2007 09/30/2010 1. Programmatic coordination, design, planning and 5. Implement effectiveness and status/trend plans
70 Install Fish Monitoring Equipment Salmon River Pilot Project - Install Pit tag arrays, DIDSON devices, adult traps, and rotary screw traps $691,790 10/01/2007 09/30/2010 2. Indicators and metric development and testing 3. Protocol development, refinement and testing 4. Sampling design development and testing
118 Coordination Salmon River Pilot Project - coordinate design, RME implementation, and habitat actions proposed in the three Pilot Project subbasins (Wenatchee/Entiat, John Day, and Salmon) $58,256 10/01/2007 09/30/2010 1. Programmatic coordination, design, planning and 5. Implement effectiveness and status/trend plans
119 Manage and Administer Projects Salmon River Pilot Project - manage on-the-ground implementation of RME activities, administer subcontracts $145,640 10/01/2007 09/30/2010 1. Programmatic coordination, design, planning and 5. Implement effectiveness and status/trend plans
156 Develop RM&E Methods and Designs Salmon River Pilot Project - develop sampling methods, attributes, and response designs $36,410 10/01/2007 09/30/2010 1. Programmatic coordination, design, planning and 5. Implement effectiveness and status/trend plans
157 Collect/Generate/Validate Field and Lab Data Salmon River Pilot Project - collect data as described in Pilot Project study design $3,444,386 10/01/2007 09/30/2010 2. Indicators and metric development and testing 3. Protocol development, refinement and testing 4. Sampling design development and testing
158 Mark/Tag Animals Salmon River Pilot Project - tag and mark juvenile and adult salmonids as dictated by study design $50,027 10/01/2007 09/30/2010 2. Indicators and metric development and testing 3. Protocol development, refinement and testing 4. Sampling design development and testing
160 Create/Manage/Maintain Database Salmon River Pilot Project - compile project data, perform quality control, and upload to Pilot Project umbrella database $65,538 10/01/2007 09/30/2010 2. Indicators and metric development and testing 3. Protocol development, refinement and testing 4. Sampling design development and testing
162 Analyze/Interpret Data Salmon River Pilot Project - reduce and analyze project data at subbasin and umbrella (combined across Pilot subbasins) scales $54,615 10/01/2007 09/30/2010 6. Evaluation tools development and testing 7. Data management tools development and testing
165 Produce Environmental Compliance Documentation Salmon River Pilot Project - prepare/assist in preparation of handling permits for research $14,564 10/01/2007 09/30/2010 1. Programmatic coordination, design, planning and 5. Implement effectiveness and status/trend plans
174 Produce Plan Salmon River Pilot Project - develop and adaptively update study design for Salmon River Pilot Project $72,820 10/01/2007 09/30/2010 1. Programmatic coordination, design, planning and 5. Implement effectiveness and status/trend plans
70 Install Fish Monitoring Equipment Wenatchee/Entiat - Install PIT tag arrays and rotary screw traps and purchase PIT tags $300,463 10/01/2007 09/30/2010 2. Indicators and metric development and testing 3. Protocol development, refinement and testing 4. Sampling design development and testing 5. Implement effectiveness and status/trend plans
29 Increase Instream Habitat Complexity John Day Pilot Project � Bridge Ck Reach #17070204000307. Construct bundled log step, centerpiece structure $50,000 05/01/2008 10/30/2008 5. Implement effectiveness and status/trend plans
29 Increase Instream Habitat Complexity John Day Pilot Project � Bridge Ck Reach #17070204000307. Construct bundled log step, centerpiece structure $50,000 05/01/2008 10/30/2008 5. Implement effectiveness and status/trend plans * # of structures installed: 1 centerpiece structure
29 Increase Instream Habitat Complexity John Day Pilot Project � Bridge Ck Reach #17070204000307.Construct upstream post pile fences, secondary structure $24,000 05/01/2008 10/30/2009 5. Implement effectiveness and status/trend plans
29 Increase Instream Habitat Complexity John Day Pilot Project � Bridge Ck Reach #17070204000307.Construct downstream post pile fences, secondary structure $24,000 05/01/2008 10/30/2009 5. Implement effectiveness and status/trend plans
29 Increase Instream Habitat Complexity John Day Pilot Project � Bridge Ck Reach #17070204000305.Construct rock step, centerpiece structure $50,000 05/01/2008 10/30/2008 5. Implement effectiveness and status/trend plans
29 Increase Instream Habitat Complexity John Day Pilot Project � Bridge Ck Reach #17070204000305.Construct rock step, centerpiece structure $45,000 05/01/2008 10/30/2008 5. Implement effectiveness and status/trend plans
29 Increase Instream Habitat Complexity John Day Pilot Project � Bridge Ck Reach #17070204000305. Construct upstream post pile fences, secondary structure $24,000 05/01/2008 10/30/2009 5. Implement effectiveness and status/trend plans
29 Increase Instream Habitat Complexity John Day Pilot Project � Bridge Ck Reach #17070204000305. Construct downstream post pile fences, secondary structure $24,000 05/01/2008 10/30/2009 5. Implement effectiveness and status/trend plans
29 Increase Instream Habitat Complexity John Day Pilot Project � Bridge Ck Reach #17070204000299. Construct rock step, centerpiece structure $45,000 05/01/2008 10/30/2008 5. Implement effectiveness and status/trend plans
29 Increase Instream Habitat Complexity John Day Pilot Project � Bridge Ck Reach #17070204000299. Construct rock step, centerpiece structure $45,000 05/01/2008 10/30/2008 5. Implement effectiveness and status/trend plans
29 Increase Instream Habitat Complexity John Day Pilot Project � Bridge Ck Reach #17070204000299. Construct rock step, centerpiece structure $45,000 05/01/2008 10/30/2008 5. Implement effectiveness and status/trend plans
29 Increase Instream Habitat Complexity John Day Pilot Project � Bridge Ck Reach #17070204000299. Construct upstream post pile fences, secondary structure $24,000 05/01/2008 10/30/2009 5. Implement effectiveness and status/trend plans
29 Increase Instream Habitat Complexity John Day Pilot Project � Bridge Ck Reach #17070204000299. Construct downstream post pile fences, secondary structure $24,000 05/01/2008 10/30/2009 5. Implement effectiveness and status/trend plans
29 Increase Instream Habitat Complexity John Day Pilot Project � Bridge Ck Reach #17070204000298. Construct bundled log step, centerpiece structure $50,000 05/01/2008 10/30/2008 5. Implement effectiveness and status/trend plans
29 Increase Instream Habitat Complexity John Day Pilot Project � Bridge Ck Reach #17070204000298. Construct bundled log step, centerpiece structure $50,000 05/01/2008 10/30/2008 5. Implement effectiveness and status/trend plans
29 Increase Instream Habitat Complexity John Day Pilot Project � Bridge Ck Reach #17070204000298. Construct upstream post pile fences, secondary structure $24,000 05/01/2008 10/30/2009 5. Implement effectiveness and status/trend plans
29 Increase Instream Habitat Complexity John Day Pilot Project � Bridge Ck Reach #17070204000298. Construct downstream post pile fences, secondary structure $24,000 05/01/2008 10/30/2009 5. Implement effectiveness and status/trend plans
175 Produce Design and/or Specifications John Day Pilot Project-Design specifications for Bridge Creek instream structures $30,000 01/01/2007 12/31/2007 5. Implement effectiveness and status/trend plans

Date Reviewer Short Recommendation Comments FY07 FY08 FY09
06/02/2006 ISRP Fundable (Qualified) This is a good proposal overall. The large scale, basinwide approach is good. A project such as this one is clearly needed in the Columbia Basin to integrate M&E efforts and provide consistency amon... More N/A N/A N/A
08/31/2006 ISRP Fundable (Qualified) This is a good proposal overall. The large scale, basinwide approach is good. A project such as this one is clearly needed in the Columbia Basin to integrate M&E efforts and provide consistency amon... More N/A N/A N/A
09/15/2006 NPCC Interim funding pending further Council consideration of regional monitoring and evaluation framework. Council decided to hold to low interim level. ISRP fundable (qualified): address ISRP concerns ... More $1,836,000.00 $1,836,000.00 $1,836,000.00
10/23/2006 NPCC Fund Interim funding pending further Council consideration of regional monitoring and evaluation framework. ISRP fundable (qualified): address ISRP concerns during further consideration. More $1,836,000.00 $1,836,000.00 $1,836,000.00