Project 2006-008-00 - Mainstem Columbia Amendments Research at Libby Dam
Project Number:
2006-008-00
Agency, Institution or Organization:
Montana Department of Fish, Wildlife and Parks
Short Description:
The Northwest Power and Conservation Council (Council) directed the region to test, implement, and evaluate an interim summer operation, called for by the Mainstem Amendments, that implement new drafting limits at Hungry Horse and Libby Dams.
Status:
Finalized
Province:
Mountain Columbia
Subbasin:
Flathead
Contact Name:
Brian Marotz
Contact Organization:
Montana Fish, Wildlife & Parks
Contact Email:
bmarotz@mt.gov
Contact Address:
490 N Meridian Rd.
Contact City, State, Zip:
Kalispell MT 59901
Contact Role(s):
Contract Manager
Information Transfer:
The expected outcomes of this project will be quantitative and qualitative. Data generated by this project will include model derivations supported by primary field data. Use of these data will be stored electronically at MFWP and backed up on CD while the project is in progress and will be available with approval after the results are published. Data will be managed by MFWP locally in printed and electronic form and backed up regularly. Public access will be available through printed reports, peer review journals and postings on the BPA web page. Information will be published in project reports and journal publications, and archived in computer files and hard copies.

Description Latitude Longitude
Hungry horse Reservoir and Flathead River downstream
Libby Reservoir and Kootenai River downstream
48.364783248243200 -115.321072389540000
48.341943458705900 -114.016662567446000

Name Primary Secondary
Trout
Burbot
Whitefish
Sturgeon
Cutthroat Trout
Trout

Short Objective Detailed Objective Strategy Subbasin Plan
Objective 1. Model reservoir habitat response Objective 1. Use HRMOD and LRMOD to calculate the amount of physical habitat available for aquatic productivity resulting from reservoir drafts in the Mainstem Amendments at Hungry Horse and Libb... Strategies in subbasin objective M1 and R3 include modelling the physical effects of the Mainstem Amendments and other alterantive dam operations. Specifically, strategies attempt to restore hydra... Kootenai
Objective 2. Model reservoir biological response Objective 2. Use HRMOD and LRMOD to calculate the biological responses resulting from reservoir drafts in the Mainstem Amendments at Hungry Horse and Libby Reservoirs.... Reservoir objectives R1 and R3 contain strategies to operate Libby Reservoir to reduce negative impacts on reservoir biota... Kootenai
Objective 3. Assess reservoir age/growth/condition Objective 3. Compile age-growth and condition factor data from annual gill net series to compare actual growth at age under varying reservoir operating strategies to long-term composite growth in... Addresses regulated mainstem M1 and M4 and reservoir objectives R1and R3. Fish related strategies include monitoring growth and survival under various dam operation scenarios.... Kootenai
Objective 5. Estimate biological effects with IFIM Objective 5. Use IFIM models to estimate the biological responses resulting from river flow in the Mainstem Amendments in the Flathead and Kootenai Rivers.... Strategies under regulated mainstem Objectives M1 and M4 use models to determine operations suited for fish survival, growth and reproduction.... Kootenai
Objective 6. Estimate salmonid cohort survival Objective 6. Estimate annual salmonid cohort survival, and relate that survival to environmental variables including weekly and daily summer flow variation (tributary and river phase).... Strategies under regulated mainstem Objectives M1 and M4 use models to determine operations suited for fish survival, growth and reproduction.... Kootenai
Objective 7. Assess fish movement & habitat use Objective 7. Use radio telemetry to assess fish locations and movement associated with river flows and ramping rates. Verify IFIM model simulations by using radio telemetry to assess fish locati... Relates to strategies under M1 Altered hydrograph, M5 Habitat diversity and Fish objectives. Kootenai
Objective 8. Migrant trapping to estimate survival Objective 8. Use migrant trapping (i.e., screw and box traps) and Passive Integrated Transponder (PIT) tagging to estimate survival and growth of cutthroat, rainbow, and bull trout populations.... Strategies under tributary objectives T1, T4, T5, T6, T7 and T8. Specifically, movements of PIT tagged fish are related to habitat protection, spawn timing, temperature, habitat preference and hy... Kootenai
Objective 9. Assess river age/growth/condition Objective 9. Compare length at age and growth increments of rainbow, westslope cutthroat and bull trout captured below Libby and Hungry Horse Dams via electrofishing to compare alternative system ... Evaluates fish growth in both reservoirs, objective R1, R2 and R3. Strategies associated with fish performance related to environmental factors.... Kootenai
Objective 4. Update river / reservoir models Objectove 4. Update the Libby Reservoir model LRMOD and Hungry Horse model HRMOD using data from recent years to improve model utility and predictive capability. Also update RIVBIO model.... Models evaluate trophic level responses to dam operating strategies in Hungry Horse and Libby Reservoirs. Addresses M3, R2 strategies to improve hydraulic turnover rates and annual operations to r... Flathead
Objective 10. Model factors affecting population Objective 10. Develop conservation theory and methods for effective application of risk-based monitoring of salmonid populations.... Addresses research on resident fish populations called for by the NPCC Mainstem Amendments. Addresses M3,R2, BT1, BT3, WCT1, WCT2 and RW1. Relates to strategies requiring an understanding of facto... Flathead

Line Item Notes FY07 Cost FY08 Cost FY09 Cost
Personnel 3.75 FTE $165,000 $165,000 $165,000
Fringe Benefits Included in Personnel $0 $0 $0
Supplies [blank] $20,000 $20,000 $20,000
Travel [blank] $25,000 $25,000 $25,000
Overhead 19% of non-equipment items $55,000 $55,000 $45,000
Other Major equipment over $10000 $50,000 $50,000 $50,000
Other Communications $1,500 $1,500 $1,500
Other Aerial Flights $15,000 $15,000 $15,000
Other MSU population modeling $50,000 $50,000 $0
Other Dr. Craig Althen, modeling $15,000 $15,000 $15,000

Provision Funding Source Type FY07 Value FY08 Value FY09 Value
This project shares equipment, personnel, and data with other BPA, MFWP management projects BPA / MFWP In-Kind $50,000 $50,000 $50,000

WE ID WE Name Title Budget Start Date End Date Objectives Metrics
119 Manage and Administer Projects Work with model subcontractors, reporting, SOW, budgets $2,000 10/01/2006 09/30/2009 Objective 1. Model reservoir habitat response
157 Collect/Generate/Validate Field and Lab Data Obtain USACE data, run reservoir models, transfer data files from DAT to Excel $15,000 10/01/2006 09/30/2009 Objective 1. Model reservoir habitat response
162 Analyze/Interpret Data Summarize reservoir model output $5,000 10/01/2006 09/30/2009 Objective 1. Model reservoir habitat response
119 Manage and Administer Projects Work with model subcontractors, reporting, SOW, budgets $2,000 10/01/2006 09/30/2009 Objective 2. Model reservoir biological response
157 Collect/Generate/Validate Field and Lab Data Obtain USACE data, run reservoir models, transfer output data files $15,000 10/01/2006 09/30/2009 Objective 2. Model reservoir biological response
162 Analyze/Interpret Data Summarize biological model output $7,000 10/01/2006 09/30/2009 Objective 2. Model reservoir biological response
118 Coordination Coordinate sampling and equipment use with regional staff $1,000 10/01/2006 09/30/2009 Objective 3. Assess reservoir age/growth/condition
119 Manage and Administer Projects Reporting, work with model subcontractors, SOW's, budgets $2,000 10/01/2006 09/30/2009 Objective 3. Assess reservoir age/growth/condition
156 Develop RM&E Methods and Designs Sampling designs $2,500 10/01/2006 09/30/2009 Objective 3. Assess reservoir age/growth/condition
157 Collect/Generate/Validate Field and Lab Data Gill netting, scales, otoliths, age fish, digital records of each fish $35,000 10/01/2006 09/30/2009 Objective 3. Assess reservoir age/growth/condition
162 Analyze/Interpret Data Summarize age / growth / condition data $15,000 10/01/2006 09/30/2009 Objective 3. Assess reservoir age/growth/condition
118 Coordination Coordinate data needs and modeling needs with subcontractors $5,000 10/01/2006 09/30/2009 Objective 4. Update river / reservoir models
119 Manage and Administer Projects Work with modeling subcontractors $5,000 10/01/2006 09/30/2009 Objective 4. Update river / reservoir models
157 Collect/Generate/Validate Field and Lab Data Obtain data for subcontractors and assess modeling needs / changes $50,000 10/01/2006 09/30/2009 Objective 4. Update river / reservoir models
118 Coordination Coordinate with IFM modelers and sampling with regional staff $1,000 10/01/2006 09/30/2009 Objective 5. Estimate biological effects with IFIM
119 Manage and Administer Projects Coordinate with IFIM modelers, SOW, budgets $2,000 10/01/2006 09/30/2009 Objective 5. Estimate biological effects with IFIM
156 Develop RM&E Methods and Designs Telemetry and modeling designs $2,500 10/01/2006 09/30/2009 Objective 5. Estimate biological effects with IFIM
157 Collect/Generate/Validate Field and Lab Data Model habitat quantity / telemetry data collection $20,000 10/01/2006 09/30/2009 Objective 5. Estimate biological effects with IFIM
162 Analyze/Interpret Data Analyze flow data with models and assess / validate with telemetry data $10,000 10/01/2006 09/30/2009 Objective 5. Estimate biological effects with IFIM
118 Coordination Coordinate sampling for population estimates / equipment use with regional staff $1,000 10/01/2006 09/30/2009 Objective 6. Estimate salmonid cohort survival
119 Manage and Administer Projects SOW and budget $2,000 10/01/2006 09/30/2009 Objective 6. Estimate salmonid cohort survival
156 Develop RM&E Methods and Designs Sampling and data analysis designs $2,500 10/01/2006 09/30/2009 Objective 6. Estimate salmonid cohort survival
157 Collect/Generate/Validate Field and Lab Data Electrofishing, PIT tag new fish, process tagged fish, population estimates $30,000 10/01/2006 09/30/2009 Objective 6. Estimate salmonid cohort survival
162 Analyze/Interpret Data Age fish, population estimates, summarize PIT tag database, lengths and weights $10,000 10/01/2006 09/30/2009 Objective 6. Estimate salmonid cohort survival
70 Install Fish Monitoring Equipment Install / place remote radio tag detection stations $25,000 10/01/2006 09/30/2009 Objective 7. Assess fish movement & habitat use
119 Manage and Administer Projects Manage staff for data collection, SOW, budget, reporting $2,000 10/01/2006 09/30/2009 Objective 7. Assess fish movement & habitat use
156 Develop RM&E Methods and Designs Telemetry and sampling designs $2,500 10/01/2006 09/30/2009 Objective 7. Assess fish movement & habitat use
157 Collect/Generate/Validate Field and Lab Data Track radio tagged fish, aerial flights, habitat usage, movements, data in ARCVIEW $160,000 10/01/2006 09/30/2009 Objective 7. Assess fish movement & habitat use
162 Analyze/Interpret Data GIS work and data analysis, map making $25,000 10/01/2006 09/30/2009 Objective 7. Assess fish movement & habitat use
70 Install Fish Monitoring Equipment Install remote PIT tag stations and power supplies $120,000 10/01/2006 09/30/2009 Objective 8. Migrant trapping to estimate survival
118 Coordination Coordinate sampling and equipment use for remote PIT tag stations maintenance with regional staff $2,000 10/01/2006 09/30/2009 Objective 8. Migrant trapping to estimate survival
119 Manage and Administer Projects Reporting, SOW, budgets, manage staff for remote PIT tag station use / maintenance $2,000 10/01/2006 09/30/2009 Objective 8. Migrant trapping to estimate survival
156 Develop RM&E Methods and Designs Develop maintenance schedule, sampling and data analysis designs $3,500 10/01/2006 09/30/2009 Objective 8. Migrant trapping to estimate survival
157 Collect/Generate/Validate Field and Lab Data Population estimates, download data from remote stations, database management, redd counts, PIT tag fish $141,000 10/01/2006 09/30/2009 Objective 8. Migrant trapping to estimate survival
162 Analyze/Interpret Data Calculate survival, growth, and other metrics associated with remote PIT tag stations and redd count data $25,000 10/01/2006 09/30/2009 Objective 8. Migrant trapping to estimate survival
186 Operate and Maintain Habitat/Passage Maintain remote PIT tag stations, data downloads, propane / battery replacements $50,000 10/01/2006 09/30/2009 Objective 8. Migrant trapping to estimate survival
118 Coordination Coordinate sampling and equipment use with regional staff $2,000 10/01/2006 09/30/2009 Objective 9. Assess river age/growth/condition
119 Manage and Administer Projects Manage staff for sampling, SOW, budgets, performance appraisals $2,000 10/01/2006 09/30/2009 Objective 9. Assess river age/growth/condition
156 Develop RM&E Methods and Designs Sampling and data analysis designs $2,500 10/01/2006 09/30/2009 Objective 9. Assess river age/growth/condition
157 Collect/Generate/Validate Field and Lab Data Population estimates, scale /otolith collection / preparation, age fish, digitize $50,000 10/01/2006 09/30/2009 Objective 9. Assess river age/growth/condition
162 Analyze/Interpret Data Summarize age / growth / condition data from population estimates and other Mainstem sampling $15,000 10/01/2006 09/30/2009 Objective 9. Assess river age/growth/condition
175 Produce Design and/or Specifications Remote PIT tag station specs for BIOMARK, site preparation $5,000 10/01/2006 09/30/2007 Objective 8. Migrant trapping to estimate survival
158 Mark/Tag Animals Radio tag fish $5,000 10/01/2006 09/30/2009 Objective 5. Estimate biological effects with IFIM
158 Mark/Tag Animals Electrofishing, PIT tag fish $15,000 10/01/2006 09/30/2009 Objective 6. Estimate salmonid cohort survival
158 Mark/Tag Animals Electrofishing and radio tag fish $5,000 10/01/2006 09/30/2009 Objective 7. Assess fish movement & habitat use
158 Mark/Tag Animals Population estimates in tributaries, electrofishing, PIT tag fish $40,000 10/01/2006 09/30/2009 Objective 8. Migrant trapping to estimate survival
158 Mark/Tag Animals PIT and radio tag fish in Mainstem and tributaries $5,000 10/01/2006 09/30/2009 Objective 9. Assess river age/growth/condition
98 Other Computer purchase $3,000 10/01/2006 09/30/2009 Objective 1. Model reservoir habitat response
98 Other Produce Annual Report $25,000 10/01/2006 09/30/2009 Objective 1. Model reservoir habitat response
98 Other 15-20000 PIT tags $50,000 10/01/2006 09/30/2009 Objective 6. Estimate salmonid cohort survival
98 Other PISCES Status Reports $4,500 10/01/2006 09/30/2009 Objective 1. Model reservoir habitat response
119 Manage and Administer Projects 10a Develop VPM model to isolate factors controlling bull trout populations. $2,000 07/01/2007 06/30/2009 Objective 10. Model factors affecting population
156 Develop RM&E Methods and Designs Develop /refine modeling methods $4,000 07/01/2007 06/30/2009 Objective 10. Model factors affecting population
118 Coordination Coordinate between MSU and MFWP $2,000 07/01/2007 06/30/2009 Objective 10. Model factors affecting population
162 Analyze/Interpret Data Model development / computer programming and data analysis $90,000 07/01/2007 06/30/2009 Objective 10. Model factors affecting population
183 Produce/Submit Scientific Findings Report Annual report by MSU will beincorporated into annual report $2,000 07/01/2007 06/30/2009 Objective 10. Model factors affecting population

Date Reviewer Short Recommendation Comments FY07 FY08 FY09
06/02/2006 ISRP Fundable This is a well-prepared proposal that rates high marks for all ISRP review criteria. The project is well justified and deserves continued funding. The ISRP previously reviewed this proposal; see ISR... More N/A N/A N/A
08/31/2006 ISRP Fundable This is a well-prepared proposal that rates high marks for all ISRP review criteria. The project is well justified and deserves continued funding. The ISRP previously reviewed this proposal; see ISR... More N/A N/A N/A
09/15/2006 NPCC $396,500.00 $396,500.00 $336,500.00
10/23/2006 NPCC Fund $396,500.00 $396,500.00 $336,500.00