Description | Latitude | Longitude |
---|---|---|
The project reach is on the mainstem EFSFSR between Meadow Creek (upstream) and Sugar Creek (downstream) | 44.925095408978580 | -115.333815722123550 |
Short Objective | Detailed Objective | Strategy | Subbasin Plan |
---|---|---|---|
Reduce instream sedimentation | Problem 10, Objective 10A - Starting in important habitats, reduce instream sedimentation to levels meeting applicable water standards (e.g., TMDLs) and measures, with an established upward trend i... | 10A4 - �identify and treat legacy effects from mining-related sedimentation,� 10A8 - �conduct implementation and effectiveness monitoring of projects designed to reduce sediment delivery to streams... | Salmon |
Reduce concentrations of non-organic chemicals | Problem 11, Objective 11A - Reduce concentrations of non-organic chemicals to levels consistent with IDEQ beneficial use criteria. The Stibnite Mine is expressly mentioned as a ?priority area,? an... | 11A1 - �clean up and stabilize (through planting) ... tailings piles at active (and) inactive...sites,� 11A3 - �ensure adequate riparian areas exist both upstream and down stream of the affected si... | Salmon |
Rehabilitate connectivity & improve fish passage | Problem 12, Objective 12A - ?Rehabilitate connectivity where it will benefit native fish populations, with emphasis on bull trout.? The Salmon Subbasin Plan states ?disconnection of tributaries fro... | 12A1 - �reconnect waterways�define which structural barriers should be removed or modified first,� 12A2 - Use information obtained from implementation to obtain a better understanding of the ecolog... | Salmon |
Revegetate tributaries and improve bank stability | Problem 43, Objective 43A - "Localized riparian issues exist in the South Fork Watershed." Revegetate tributary reaches in areas not dominated by rip-rap or road beds and improve bank stability alo... | 8C1 - Stabilize problem areas through riparian plantings, 8C2 - Ensure revegetation efforts succeed by protecting them from grazing and development, 8C3 - Perform M&E on project actions, 8D1,55B4,9... | Salmon |
Restore degraded riparian areas | Problem 51, Objective 51B - The Subbasin Plan states "restore 50% of degraded riparian areas to proper functioning condition by 2019." Riparian area PFC provides: shade, LWM recruitment, habitat p... | 51B1 - Identify and prioritize riparian habitats for restoration, 51B2 - Restore riparian habitats, 51B3, 51B4 - Encourage landowners to replant native vegetation along degraded reaches, 51B8, 8A2,... | Salmon |
Increase number of pieces of LWD | Problem 8, Objective 8A - Increase the number of pieces of LWD in reaches currently deficient, to volumes consistent with PFC ratings (> 20 pieces/mi.)... | 8A2 - "Enhance and rehabilitate riparian ecosystems," 8A3 - Artificially recruit LWD to stream channel if neccesary, 8A4 - Provide M&E for passive and active protection and rehabilitation efforts,4... | Salmon |
Protect cultural uses of natural resources | Socioeconomic Prob. 65, Objective 65 - Protect and foster both Indian and non-Indian cultural uses of natural resources in the Salmon subbasin.... | 65A1- Integrate information and education on important indian and non-indian culture, treaty rights, and historic and current resource use into project selection and implementation... | Salmon |
Improve bank stability to PFC standards | Problem 8, Objective 8C - Improve bank stability to properly functioning condition | 8C1 - stabilize problem areas through riparian plantings, 8C2 - protect plantings from grazing and development, 8C3 - monitor and evaluate... | Salmon |
Line Item | Notes | FY07 Cost | FY08 Cost | FY09 Cost |
---|---|---|---|---|
Personnel | Project Lead, Support Staff, and Technical Staff Salaries | $71,000 | $58,700 | $71,000 |
Fringe Benefits | Nez Perce Tribe Employee Fringe | $21,300 | $17,600 | $21,300 |
Supplies | Supplies, materials, equipment, etc. | $41,000 | $5,200 | $28,200 |
Travel | to and from work site, BPA meetings, coordination meetings, GSA Vehicle, etc. | $13,000 | $11,000 | $11,000 |
Other | Training | $1,000 | $1,000 | $1,000 |
Other | Consultants and Contracts | $128,000 | $365,000 | $155,000 |
Overhead | Nez Perce Tribe Indirect Rate | $43,700 | $27,700 | $39,300 |
Other | Office Space Rental | $6,000 | $3,000 | $6,000 |
WE ID | WE Name | Title | Budget | Start Date | End Date | Objectives | Metrics |
---|---|---|---|---|---|---|---|
47 | Plant Vegetation | Revegetate degraded riparian area | $90,000 | 08/01/2008 | 11/01/2009 | Improve bank stability to PFC standards Reduce concentrations of non-organic chemicals Revegetate tributaries and improve bank stability | * # of riparian miles treated: 2 |
180 | Enhance Floodplain | Recontour, construct/ammend soils, and revegetate floodplain | $32,000 | 08/01/2008 | 11/01/2009 | Restore degraded riparian areas | * # of acres treated: 50 |
30 | Realign, Connect, and/or Create Channel | Perform stream channel and streambank restoration | $250,000 | 06/01/2008 | 11/01/2008 | Reduce instream sedimentation | * # of stream miles before treatment: 1 |
29 | Increase Instream Habitat Complexity | Install Large Woody Debris as needed | $20,000 | 06/01/2008 | 11/01/2008 | Increase number of pieces of LWD | * # of stream miles treated: 1 |
175 | Produce Design and/or Specifications | Produce final project designs | $115,000 | 03/01/2007 | 03/01/2008 | Rehabilitate connectivity & improve fish passage | |
184 | Install Fish Passage Structure | Reestablish connectivity and fish passage | $335,000 | 06/01/2008 | 11/01/2008 | Rehabilitate connectivity & improve fish passage | * Does the structure remove or replace a fish passage barrier?: yes * Was barrier Full or Partial?: Full for primary focal species * # of miles of habitat accessed: 13.9 |
118 | Coordination | Coordinate project activities | $100,000 | 03/01/2007 | 02/28/2010 | ||
119 | Manage and Administer Projects | Manage and administer project | $120,000 | 03/01/2007 | 02/28/2010 | ||
99 | Outreach and Education | Provide outreach and education for the public | $35,000 | 05/01/2007 | 12/01/2009 | Protect cultural uses of natural resources | * # of general public reached: 50 * # of students reached: 50 * # of teachers reached: 5 |
157 | Collect/Generate/Validate Field and Lab Data | Collect data for project implementation and efficacy analysis | $20,000 | 03/01/2007 | 02/28/2010 | Rehabilitate connectivity & improve fish passage | Primary R, M, and E Type: Project Implementation/ Compliance Monitoring |
28 | Trap and Haul | Perform fish salvage during implementation | $0 | 07/01/2008 | 11/01/2008 | Rehabilitate connectivity & improve fish passage | * # of fish: as needed |
158 | Mark/Tag Animals | Tag fish to analyze project efficacy | $15,000 | 03/01/2008 | 02/28/2010 | Rehabilitate connectivity & improve fish passage | |
162 | Analyze/Interpret Data | Perform project implementation and efficacy analysis | $0 | 03/01/2009 | 02/28/2010 | Rehabilitate connectivity & improve fish passage | Primary R, M, and E Type: Action Effectiveness Research |
185 | Produce Pisces Status Report | Produce PICES status reports | $5,000 | 03/01/2007 | 02/28/2010 | ||
132 | Produce Annual Report | Produce annual reports | $5,000 | 03/01/2007 | 02/28/2010 | ||
165 | Produce Environmental Compliance Documentation | Provide NEPA, ESA compliance, and cultural clearance documentation as well as obtain relevant USACE 404 and State of Idaho 401permits | $5,000 | 03/01/2007 | 08/01/2008 |
Date | Reviewer | Short Recommendation | Comments | FY07 | FY08 | FY09 | |
---|---|---|---|---|---|---|---|
06/02/2006 | ISRP | Fundable | This project is to provide fish passage for steelhead, chinook and bull trout past an old mine site. This seems like heroic engineering, but that may be what is required in this instance. Future M&E... More | N/A | N/A | N/A | |
08/31/2006 | ISRP | Fundable | This project is to provide fish passage for steelhead, chinook and bull trout past an old mine site. This seems like heroic engineering, but that may be what is required in this instance. Future M&E... More | N/A | N/A | N/A | |
09/15/2006 | NPCC | $0.00 | $0.00 | $0.00 | |||
10/23/2006 | NPCC | Do Not Fund | $0.00 | $0.00 | $0.00 |