Contract 23744: 200301700 EXP INTEGRATED STATUS & EFFECTIVENESS MONITORING ENTIAT
Project Number:
Title:
Integrated Status and Effectiveness Monitoring Program (ISEMP)
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
23744
Contract Title:
200301700 EXP INTEGRATED STATUS & EFFECTIVENESS MONITORING ENTIAT
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
The U.S. Fish and Wildlife Service's Mid-Columbia River Fishery Resource Office will conduct a component of the Entiat Effectiveness Monitoring Study that will evaluate fish habitat utilization associated with in-stream restoration work planned for 1.2 miles (approximately 2000 meters) of the lower Entiat River referred to as the "Bridge to Bridge" reach.  

USFWS will draw upon existing staff (with prior snorkeling experience) to conduct this work. This means however that their other scheduled work obligations will have to be delayed or back filled by other office personnel. To minimize disruption to the office we therefore intend to complete the sampling for each period within a five-day time frame. The successful completion of this scope of work is dependent on the completion of landowner coordination by Chelan County Conservation District (see contract 00018223) and habitat surveys by Terraqua, Inc. (see contract CR-65529).  USFWS will coordinate with CCCD and Terraqua to insure concurrent sampling schedules and consistent sample sites.

Study design, coordination, and analysis of the Entiat Effectiveness Monitoring Study, including the fish habitat utilization component, is being overseen by the Upper Columbia Regional Technical Team and NOAA Fisheries.  This Study will be implemented for 10 years beginning in 2005.  This minimum time frame is necessary to account for at least two salmonid generations, to capture pre and post-treatment monitoring, interannual variability, long-term channel adjustments to the restoration project, and possible changes to restoration project features that might arise from periodic factors like large runoff events or forest fires.
Account Type(s):
Expense
Contract Start Date:
07/01/2005
Contract End Date:
06/30/2006
Current Contract Value:
$45,518
Expenditures:
$45,518

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Jim Craig US Fish and Wildlife Service (USFWS) Yes Administrative Contact jim_l_craig@fws.gov (509) 548-2999
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Gerald McClintock Bonneville Power Administration Yes COR gmcclintock@bpa.gov (503) 230-5375
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
R.D. Nelle US Fish and Wildlife Service (USFWS) Yes Contract Manager rd_nelle@fws.gov (509) 548-7573
Darla Smith US Fish and Wildlife Service (USFWS) No Administrative Contact darla_smith@fws.gov (503) 736-4759
Michael Ward Terraqua, Inc. No Technical Contact mike@terraqua.biz (509) 486-2426
Nancy Weintraub Bonneville Power Administration No Env. Compliance Lead nhweintraub@bpa.gov (503) 230-5373


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Obtain sign-off from BPA's Environmental Compliance Group that requirements are complete. A: 165. "Bridge to Bridge" area of lower Entiat (snorkelling) 07/31/2005 09/23/2005
Raw data sheets and quality controlled, georeferenced raw data B: 157. Nine sampling sites on Entiat River "Bridge to Bridge" 06/08/2006 06/08/2006
Submit BPA Required Project Management Documents C: 119. <No Work Element Title Entered> 05/31/2006 06/07/2006
Load final report on BPA web site D: 132. <No Work Element Title Entered> 06/30/2006 07/26/2006

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
All Anadromous Salmonids
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 "Bridge to Bridge" area of lower Entiat (snorkelling)
B 157 Nine sampling sites on Entiat River "Bridge to Bridge"
C 119
D 132
E 185 Quarterly status report by milestone