A | 165 | Produce Environmental Compliance Documentation | "Bridge to Bridge" area of lower Entiat (snorkelling) | Assemble, gather, acquire, or prepare documents in support of obtaining environmental compliance from BPA (such as filling out a NEPA Checklist, providing maps, drafting a Biological Assessment, obtaining permits, conducting public involvement activities, completing an archaeological survey, etc.). | |||
B | 157 | Collect/Generate/Validate Field and Lab Data | Nine sampling sites on Entiat River "Bridge to Bridge" | Conduct fish habitat utilization surveys using snorkelling at treatment and control sites in the Entiat River. | All Anadromous Salmonids | ||
C | 119 | Manage and Administer Projects | Manage on-the-ground efforts. Also covers administrative work in support of on-the-ground efforts and in support of BPA's programmatic requirements such as metric reporting, financial reporting (e.g., accruals), and development of an SOW package (includes draft SOW, budget, spending plan, and property inventory). | ||||
D | 132 | Produce Progress (Annual) Report | Prepare an Annual Report. | ||||
E | 185 | Produce CBFish Status Report | Quarterly status report by milestone | Prepare a status report against each milestone, indicating whether the milestone is green, yellow, or red. Reports will be submitted electronically until Pisces is available, at which time reports will be filed on-line via Pisces. |