Province | Subbasin | % |
---|---|---|
Columbia Plateau | Crab | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental Compliance | A: 165. Environmental Compliance | 09/30/2007 | 09/30/2007 | |
Water Use Documentation | B: 181. Coordinate with BOR and Quincy Irrigation District | 09/30/2007 | 09/30/2007 | |
Design specifications for fish screen. | C: 175. Design fish screen | 08/15/2007 | ||
Installed fish screen. | D: 69. Install fish screen at TD-1 | 06/15/2007 | ||
Excavation of cell#2 at TD-1 site. | E: 181. Excavate Cell #2 at TD-1 | 09/30/2007 | 09/30/2007 | |
Armor dikes at the TD-1 site. | F: 55. Armor dikes at TD-1 site. | 03/15/2007 | 03/15/2007 | |
Armor dikes at the TD-2 site. | G: 55. Armor dikes at TD-2 site. | 03/15/2007 | 03/15/2007 | |
Fish-free ponds. | H: 181. Remove fish from project ponds. | 09/30/2007 | ||
Seed disturbed soil at TD-1. | I: 55. Seed disturbed soil at TD-1 site. | 03/15/2007 | 03/15/2007 | |
Seed disturbed soil at TD-2. | J: 55. Seed disturbed soil at TD-2 site. | 03/15/2007 | 03/15/2007 | |
TD-1 cells tilled | K: 47. Till cells at TD-1 | 04/30/2007 | 03/30/2007 | |
Control of undesirable/invasive vegetation. | L: 53. Control undesirable vegetation at TD-1 | 09/30/2007 | 09/30/2007 | |
Control of undesirable/invasive vegetation. | M: 53. Control undesirable vegetation at TD-2 | 09/30/2007 | 09/30/2007 | |
Functional physical features. | N: 181. Inspect/repair physical enhancements at TD-1 | 09/30/2007 | 09/30/2007 | |
Functional physical features. | O: 181. Inspect/repair dikes at TD-2. | 09/30/2007 | 09/05/2007 | |
Develop M & E methods | P: 156. Design M & E Methods for submerged aquatic vegetation (SAV) at TD- 2 | 08/01/2007 | 08/01/2007 | |
M & E at TD-2 | Q: 157. Monitor and Evaluate submerged aquatic vegetation at TD-2 | 09/30/2007 | 09/30/2007 | |
Annual Report | S: 132. Annual Report for BPA | 09/30/2007 | ||
BPA required administrative duties | T: 119. BPA Administrative requirements | 09/30/2007 | 09/30/2007 | |
Wildlife Area Administrative duties | U: 119. WDFW Administrative Requirements | 09/30/2007 | 09/30/2007 |
Primary Focal Species | Work Statement Elements |
---|---|
Wildlife |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Environmental Compliance | 02/09/2007 | ||||||
B | 181 | Coordinate with BOR and Quincy Irrigation District | 02/09/2007 | ||||||
C | 175 | Design fish screen | 02/09/2007 | ||||||
D | 69 | Install fish screen at TD-1 | 02/26/2007 | ||||||
E | 181 | Excavate Cell #2 at TD-1 | 02/26/2007 | ||||||
F | 55 | Armor dikes at TD-1 site. | 02/26/2007 | ||||||
G | 55 | Armor dikes at TD-2 site. | 02/26/2007 | ||||||
H | 181 | Remove fish from project ponds. | 02/09/2007 | ||||||
I | 55 | Seed disturbed soil at TD-1 site. | 02/26/2007 | ||||||
J | 55 | Seed disturbed soil at TD-2 site. | 02/26/2007 | ||||||
K | 47 | Till cells at TD-1 | 02/26/2007 | ||||||
L | 53 | Control undesirable vegetation at TD-1 | 02/26/2007 | ||||||
M | 53 | Control undesirable vegetation at TD-2 | 02/26/2007 | ||||||
N | 181 | Inspect/repair physical enhancements at TD-1 | 02/26/2007 | ||||||
O | 181 | Inspect/repair dikes at TD-2. | 02/26/2007 | ||||||
P | 156 | Design M & E Methods for submerged aquatic vegetation (SAV) at TD- 2 | 02/09/2007 | ||||||
Q | 157 | Monitor and Evaluate submerged aquatic vegetation at TD-2 | 02/09/2007 | ||||||
R | 185 | Quarterly Status Reports for BPA | 02/09/2007 | ||||||
S | 132 | Annual Report for BPA | 02/09/2007 | ||||||
T | 119 | BPA Administrative requirements | 02/09/2007 | ||||||
U | 119 | WDFW Administrative Requirements | 02/09/2007 |