Province | Subbasin | % |
---|---|---|
Columbia Plateau | Crab | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental Compliance | A: 165. Environmental compliance documentation | 10/01/2007 | 10/01/2007 | |
Water Use Documentation | B: 181. Coordinate with BOR and Quincy Irrigation District | 09/30/2008 | 09/30/2008 | |
Armor dikes at the TD-1 site. | C: 186. Inspect, repair, physical enhancements and dikes at TD-1 site | 09/30/2008 | 09/30/2008 | |
Armor dikes at the TD-2 site. | D: 186. Inspect and repair dikes at TD-2 site | 09/30/2008 | 09/30/2008 | |
Seed disturbed soil at TD-1. | E: 186. Seed disturbed soil at TD-1 site | 03/31/2008 | 03/31/2008 | |
Seed disturbed soil at TD-2. | F: 186. Seed disturbed soil at TD-2 site | 03/15/2008 | 03/31/2008 | |
TD-1 cells tilled | G: 22. Till cells at TD-1 | 08/31/2008 | 07/31/2008 | |
Seed 69 acres of moist soil vegetation at TD-1 project site | H: 47. Moist soil seeding in TD-1 | 08/31/2008 | 08/31/2008 | |
Monitor and maintain moist soil vegetation stand at TD-1 project site | I: 22. Monitor and maintain desirable vegetation | 09/30/2008 | 09/30/2008 | |
Control of undesirable/invasive vegetation at TD-1. | J: 53. Control undesirable vegetation at TD-1 | 09/30/2008 | 09/30/2008 | |
Control of undesirable/invasive vegetation at TD-2 project site. | K: 53. Control undesirable vegetation at TD-2 | 09/30/2008 | 09/30/2008 | |
Water in wetland cells at TD-1 | L: 186. Operate water control structures at TD-1 | 06/01/2008 | 06/01/2008 | |
Recontour basin drainages at TD-1 as needed. | M: 181. Ensure wetland cells drain completely at TD-1 | 09/15/2008 | ||
Fish-free ponds. | N: 190. Remove Fish from project ponds at TD-2 | 09/30/2008 | ||
BPA required administrative duties | O: 119. BPA Administrative requirements | 09/30/2008 | 09/30/2008 | |
Wildlife Area Administrative duties | P: 119. WDFW Administrative Requirements | 09/30/2008 | 09/30/2008 | |
Attach Progress Report in Pisces | Q: 132. Submit Progress Report for the period October 2007 through September 2008 | 08/15/2008 |
Primary Focal Species | Work Statement Elements |
---|---|
Wildlife |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Environmental compliance documentation | 02/09/2007 | ||||||
B | 181 | Coordinate with BOR and Quincy Irrigation District | 02/09/2007 | ||||||
C | 186 | Inspect, repair, physical enhancements and dikes at TD-1 site | 02/09/2007 | ||||||
D | 186 | Inspect and repair dikes at TD-2 site | 02/09/2007 | ||||||
E | 186 | Seed disturbed soil at TD-1 site | 02/09/2007 | ||||||
F | 186 | Seed disturbed soil at TD-2 site | 02/09/2007 | ||||||
G | 22 | Till cells at TD-1 | 02/09/2007 | ||||||
H | 47 | Moist soil seeding in TD-1 | 02/09/2007 | ||||||
I | 22 | Monitor and maintain desirable vegetation | 02/09/2007 | ||||||
J | 53 | Control undesirable vegetation at TD-1 | 02/09/2007 | ||||||
K | 53 | Control undesirable vegetation at TD-2 | 02/09/2007 | ||||||
L | 186 | Operate water control structures at TD-1 | 02/09/2007 | ||||||
M | 181 | Ensure wetland cells drain completely at TD-1 | 02/09/2007 | ||||||
N | 190 | Remove Fish from project ponds at TD-2 | 02/09/2007 | ||||||
O | 119 | BPA Administrative requirements | 02/09/2007 | ||||||
P | 119 | WDFW Administrative Requirements | 02/09/2007 | ||||||
Q | 132 | Submit Progress Report for the period October 2007 through September 2008 | 02/09/2007 | ||||||
R | 185 | Periodic Status Reports for BPA | 02/09/2007 |