Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 34927: 2006-003-00 PL DESERT WILDLIFE AREA O&M
Project Number:
Title:
Desert Wildlife Mitigation
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Crab 100.00%
Contract Number:
34927
Contract Title:
2006-003-00 PL DESERT WILDLIFE AREA O&M
Contract Continuation:
Previous: Next:
30303: 2006-003-00 PL DESERT WILDLIFE AREA O&M
  • 40094: 200600300 EXP DESERT WILDLIFE AREA O&M
Contract Status:
Closed
Contract Description:
Operate and maintain two wetland enhancement projects on the Desert Wildlife Area that have been funded, in part, by BPA.  This contract will provide funding to operate and maintain the enhanced wetlands for at least one year to insure that they remain functional.  The TD-1 project is near completion; and when operated this fall will fill 7 wetland basins by diverting surface water from the Frenchman Hills wasteway into wetland basins.  Enhancements at the TD-1 project included: installation of (10) water control structures, construction of ditches and dikes for water management, sculpting wetland basins to optimal depth for wetland obligate birds,  armoring 200 ft of dikes to protect against beaver and burrowing mammals, seeding disturbed soil resulting from construction activities, and tilling wetland cells to promote desirable moist soil vegetation.  Operation and maintenance of TD-1 will include: coordination with BOR and Quincy Irrigation District, inspecting /repairing enhancements, re-seeding areas that failed to establish desirable vegetation in 2007, controlling undesirable vegetation and noxious weeds, operating water control structures, producing required BPA reports, and administering the contract.  The TD-2 project, enhanced (excavation) 19 late-succession stage wetlands adjacent to the Winchester Wasteway by removing accumulated organic material from them and eliminating surface water connection to the wasteway which allows for the management of fish populations in the project ponds.  Enhancements at the TD-2 project included armoring over 1000 feet of dikes due to beaver activity, and seeding disturbed soil resulting from construction activities.   Operation and maintenance at TD-2 includes inspecting / repairing enhancements, controlling undesirable vegetation and noxious weeds,  removing fish from project ponds, producing required BPA reports, and administering the contract.  Management of the project ponds will be used to maximize habitat quality for wetland obligate birds.
Account Type(s):
Expense
Contract Start Date:
10/01/2007
Contract End Date:
09/30/2008
Current Contract Value:
$56,158
Expenditures:
$56,158

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance A: 165. Environmental compliance documentation 10/01/2007 10/01/2007
Water Use Documentation B: 181. Coordinate with BOR and Quincy Irrigation District 09/30/2008 09/30/2008
Armor dikes at the TD-1 site. C: 186. Inspect, repair, physical enhancements and dikes at TD-1 site 09/30/2008 09/30/2008
Armor dikes at the TD-2 site. D: 186. Inspect and repair dikes at TD-2 site 09/30/2008 09/30/2008
Seed disturbed soil at TD-1. E: 186. Seed disturbed soil at TD-1 site 03/31/2008 03/31/2008
Seed disturbed soil at TD-2. F: 186. Seed disturbed soil at TD-2 site 03/15/2008 03/31/2008
TD-1 cells tilled G: 22. Till cells at TD-1 08/31/2008 07/31/2008
Seed 69 acres of moist soil vegetation at TD-1 project site H: 47. Moist soil seeding in TD-1 08/31/2008 08/31/2008
Monitor and maintain moist soil vegetation stand at TD-1 project site I: 22. Monitor and maintain desirable vegetation 09/30/2008 09/30/2008
Control of undesirable/invasive vegetation at TD-1. J: 53. Control undesirable vegetation at TD-1 09/30/2008 09/30/2008
Control of undesirable/invasive vegetation at TD-2 project site. K: 53. Control undesirable vegetation at TD-2 09/30/2008 09/30/2008
Water in wetland cells at TD-1 L: 186. Operate water control structures at TD-1 06/01/2008 06/01/2008
Recontour basin drainages at TD-1 as needed. M: 181. Ensure wetland cells drain completely at TD-1 09/15/2008
Fish-free ponds. N: 190. Remove Fish from project ponds at TD-2 09/30/2008
BPA required administrative duties O: 119. BPA Administrative requirements 09/30/2008 09/30/2008
Wildlife Area Administrative duties P: 119. WDFW Administrative Requirements 09/30/2008 09/30/2008
Attach Progress Report in Pisces Q: 132. Submit Progress Report for the period October 2007 through September 2008 08/15/2008

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 2 instances of WE 22 Maintain Vegetation
  • 5 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 53 Remove Vegetation
  • 2 instances of WE 181 Create, Restore, and/or Enhance Wetland

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental compliance documentation 02/09/2007
B 181 Coordinate with BOR and Quincy Irrigation District 02/09/2007
C 186 Inspect, repair, physical enhancements and dikes at TD-1 site 02/09/2007
D 186 Inspect and repair dikes at TD-2 site 02/09/2007
E 186 Seed disturbed soil at TD-1 site 02/09/2007
F 186 Seed disturbed soil at TD-2 site 02/09/2007
G 22 Till cells at TD-1 02/09/2007
H 47 Moist soil seeding in TD-1 02/09/2007
I 22 Monitor and maintain desirable vegetation 02/09/2007
J 53 Control undesirable vegetation at TD-1 02/09/2007
K 53 Control undesirable vegetation at TD-2 02/09/2007
L 186 Operate water control structures at TD-1 02/09/2007
M 181 Ensure wetland cells drain completely at TD-1 02/09/2007
N 190 Remove Fish from project ponds at TD-2 02/09/2007
O 119 BPA Administrative requirements 02/09/2007
P 119 WDFW Administrative Requirements 02/09/2007
Q 132 Submit Progress Report for the period October 2007 through September 2008 02/09/2007
R 185 Periodic Status Reports for BPA 02/09/2007