Province | Subbasin | % |
---|---|---|
Basinwide | - | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
All BPA Contract Documents | A: 119. Overall Project Management | 01/30/2009 | 01/30/2009 | |
Sign-off from BPA's Environmental Compliance Group that EC requirements are met | C: 165. EC for FY08 and pre-work for FY09 contract | 05/07/2008 | 05/07/2008 | |
Steelhead redd counts in Entiat River | D: 157. Steelhead redd surveys in Entiat River | 01/31/2009 | ||
Submission of smolt trap data | E: 157. Operate smolt traps | 01/31/2009 | 01/27/2009 | |
Fish population data | F: 157. Snorkel 24 (summer) and 30 (fall and winter) sampling sites on Entiat River | 01/31/2009 | ||
Final FY08 Contract Annual Report submitted to NOAA Fisheries | G: 132. Annual report covering the period 2/1/2008 to 01/31/2009 | 01/31/2009 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 119 | Overall Project Management | 02/09/2007 | ||||||
B | 185 | Periodic Status Reports for BPA | 02/09/2007 | ||||||
C | 165 | EC for FY08 and pre-work for FY09 contract | 02/09/2007 | ||||||
D | 157 | Steelhead redd surveys in Entiat River | 04/10/2008 | ||||||
E | 157 | Operate smolt traps | 04/10/2008 | ||||||
F | 157 | Snorkel 24 (summer) and 30 (fall and winter) sampling sites on Entiat River | 04/10/2008 | ||||||
G | 132 | Annual report covering the period 2/1/2008 to 01/31/2009 | 02/09/2007 |