Province | Subbasin | % |
---|---|---|
Intermountain | Pend Oreille | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Sep-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Idaho scientific collection, transportation, and federal permits | A: 165. Obtain necessary permits and set up contract for genetic analysis | 02/28/2009 | 02/28/2009 | |
Angling for bull trout below Albeni Falls Dam | B: 157. Angling for bull trout | 11/30/2008 | 04/28/2009 | |
Weekly electrofishing collection of bull trout below Albeni Falls Dam | C: 157. Weekly electrofishing collecting a representative sample of bull trout below Albeni Falls Dam | 04/30/2009 | 04/30/2009 | |
Implanting of radio tags | D: 158. Implant combination radio acoustic transmitter into bull trout | 04/30/2009 | 04/15/2009 | |
Genetic Analysis | E: 157. Rapid response genetic analysis of bull trout biopsy samples | 04/30/2009 | 04/30/2009 | |
Bull trout transported above Albeni Falls Dam | F: 28. Transport bull trout above Albeni Falls Dam | 04/30/2009 | 04/30/2009 | |
Annual maintenance of monitoring equipment | G: 70. Annual overhaul and recalibration of ground receiver stations | 03/28/2009 | 04/15/2009 | |
Electrofishing data entry | H: 157. Compile electronic spread sheet data base of electrofishing data | 04/30/2009 | 03/15/2009 | |
Downloading stationary ground radio receiver | I: 157. Download stationary ground radio receiving station | 04/30/2009 | 04/30/2009 | |
Tracking of radio tagged fish with aircraft, vehicle, and boat. | J: 157. Mobile tracking surveys by fixed wing aircraft, vehicle, and boat | 04/30/2009 | 01/15/2009 | |
Project coordination among stakeholders | K: 189. Project coordination among all stakeholders | 04/30/2009 | 04/30/2009 | |
Funding Package - Submit draft to COTR | M: 119. Manage Project | 02/01/2009 | 01/30/2009 | |
Final report uploaded to the BPA website | N: 132. Submit Annual Report for the period (5/1/2008) to (4/30/2009) | 04/30/2009 | 04/30/2009 | |
Data analysis of tracking data | O: 162. Data reduction and analysis | 04/30/2009 | 04/30/2009 |
Primary Focal Species | Work Statement Elements |
---|---|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Obtain necessary permits and set up contract for genetic analysis | 02/09/2007 | ||||||
B | 157 | Angling for bull trout | 02/19/2007 | ||||||
C | 157 | Weekly electrofishing collecting a representative sample of bull trout below Albeni Falls Dam | 02/09/2007 | ||||||
D | 158 | Implant combination radio acoustic transmitter into bull trout | 02/09/2007 | ||||||
E | 157 | Rapid response genetic analysis of bull trout biopsy samples | 02/09/2007 | ||||||
F | 28 | Transport bull trout above Albeni Falls Dam | 02/09/2007 | ||||||
G | 70 | Annual overhaul and recalibration of ground receiver stations | 02/09/2007 | ||||||
H | 157 | Compile electronic spread sheet data base of electrofishing data | 02/09/2007 | ||||||
I | 157 | Download stationary ground radio receiving station | 02/09/2007 | ||||||
J | 157 | Mobile tracking surveys by fixed wing aircraft, vehicle, and boat | 02/09/2007 | ||||||
K | 189 | Project coordination among all stakeholders | 02/09/2007 | ||||||
L | 185 | Periodic Status Reports for BPA | 02/09/2007 | ||||||
M | 119 | Manage Project | 02/09/2007 | ||||||
N | 132 | Submit Annual Report for the period (5/1/2008) to (4/30/2009) | 02/09/2007 | ||||||
O | 162 | Data reduction and analysis | 02/09/2007 |