Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 38879: 1988-053-15 EXP HRPP PARKDALE PHASE I EXPANSION
Project Number:
Title:
Hood River Artificial Production-Parkdale
Stage:
Complete
Area:
Province Subbasin %
Columbia Gorge Hood 100.00%
Contract Number:
38879
Contract Title:
1988-053-15 EXP HRPP PARKDALE PHASE I EXPANSION
Contract Continuation:
Previous: Next:
n/a
  • 41209: 1988-053-15 CAP HRPP PARKDALE PHASE 1 EXPANSION--MOA
Contract Status:
Closed
Contract Description:
Warm Springs Fisheries Program Manager: Brad Houslet (541) 553-2039
HRPP Fisheries Program Manager: Chris Brun (541) 352-3548
Parkdale Fish Facility Manager: Jim Gidley (541) 352-7936
Fiscal Officer: Arthur Mitchell (541) 553-3219
Address: 6030 Dee Hwy, Parkdale, OR 97041


Funds awarded to the CTWSRO will be used to begin Step I upgrades to the Parkdale  Fish  Facility (PFF) and begin Step II final design for new fish weirs and an acclimation facility at Moving Falls.  These PFF upgrades and Step II designs have been identified in the Revised HRPP Master Plan.

Tasks to be completed in this contract period include:

1. Final engineering designs to upgrade PFF to begin full term rearing of 30,000 full term spring Chinook salmon smolts. This includes installing two new wells to provide water to PFF, hatch house upgrades and a water heating system incubation and juvenile rearing.
2. Install well pumps and water heating system for Canadian troughs.
3. Develop a RFP a to procure a general contractor to construct well house, pipeline and hatch house upgrades.
4. Develop, advertise a RFP and select a contractor  for Step II final design of Moving Fallls fish weir and temporary acclimation facility and East Fork weir.

















The intent of this contract is to provide the Warm Springs Tribes sufficient funds to complete two major tasks to begin implementing program revisions identified in the Revised HRPP Master Plan and funded (capital portion) in the April 4, 2008 MOA in a timely manner.    

Task 1: Engineer and install wells and necessary infrastructure including hatch house upgrades at Parkdale Fish Facility so the new well water source can be used to raise BY 08 spring Chinook salmon smolts (WE's D, E & F).

Task 2: Complete necessary verification of conceptual plans for PFF upgrades, East and West Fork weirs and Moving falls acclimation facility. This information will be used to develop an implementation plan that will serve as a road map for achieving program expansion through 2014. This will enable well thought out and smooth transition in preliminary / final design through construction. Plan development and review will be overseen by CTWSRO and ODFW.

This work will be administered by the CTWSR Department of Natural Resources.
Account Type(s):
Expense
Contract Start Date:
08/01/2008
Contract End Date:
02/28/2009
Current Contract Value:
$150,101
Expenditures:
$150,101

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Contract management and administrative requirements complete A: 119. Manage Project 01/31/2009 02/26/2009
Copies of permits provided to BPA; SHPO/THPO concurrence on CR survey C: 165. Ensure environmental compliance is current 10/20/2008 10/20/2008
Oversight of PFF upgrades (New wells and hatch house upgrades). D: 100. Provide oversight for Parkdale Improvements 01/31/2009 02/26/2009
Final designs and specifications for PFF well and hatch house improvements. E: 175. Complete Designs to Implement Well and Hatch House Improvements at PFF 01/31/2009 02/26/2009
Well pumps installed F: 171. Install wells and upgrade hatch house. 01/31/2009 02/26/2009
Step 2 and 3 RFP developed, advertised and awarded. G: 174. Develop RFP for Step II final design 01/31/2009 01/15/2009
Water heating system installed. I: 61. Install water heaters for juvenile rearing. 01/31/2009 02/26/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage Project 02/09/2007
B 185 Periodic Status Reports for BPA 02/09/2007
C 165 Ensure environmental compliance is current 02/09/2007
D 100 Provide oversight for Parkdale Improvements 02/09/2007
E 175 Complete Designs to Implement Well and Hatch House Improvements at PFF 02/09/2007
F 171 Install wells and upgrade hatch house. 12/19/2008
G 174 Develop RFP for Step II final design 02/09/2007
H 132 Annual Report 02/09/2007
I 61 Install water heaters for juvenile rearing. 12/19/2008