Contract 41209: 1988-053-15 CAP HRPP PARKDALE PHASE 1 EXPANSION--MOA
Project Number:
Title:
Hood River Artificial Production-Parkdale
Stage:
Complete
Area:
Province Subbasin %
Columbia Gorge Hood 100.00%
Contract Number:
41209
Contract Title:
1988-053-15 CAP HRPP PARKDALE PHASE 1 EXPANSION--MOA
Contract Continuation:
Previous: Next:
38879: 1988-053-15 EXP HRPP PARKDALE PHASE I EXPANSION
Contract Status:
Closed
Contract Description:
Funds from this contract will be used by the CTWSRO complete Phase I upgrades to the the Parkdale Fish Facility.  Final design engineering to supply the facility with water from two new wells was completed under contract 103322.  Specific work to be performed includes:

1. Construction of a well house containing pump controls, an aeration system and emergency power generator.i
2. Installation of a pipeline to deliver well water to the pump house and to the facility.
3. Installation of a discharge header to deliver water to facility ponds.
4. Installation of all necessary electrical and alarm systems to supply well water to PFF.
5. Determination of costs of electricity to power well pumps and water heater.
6. Install emergency power generator and alarm monitor in facility residences.

Construction inspection will be provided by BPA.
Account Type(s):
Capital
Contract Start Date:
03/01/2009
Contract End Date:
02/28/2010
Current Contract Value:
$295,312
Expenditures:
$295,312

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Christopher Brun Confederated Tribes of Warm Springs Yes Contract Manager cbrun@hrecn.net (541) 352-3548
Mickey Carter Bonneville Power Administration No Env. Compliance Lead macarter@bpa.gov (503) 230-5885
Richard Golden Jr Bonneville Power Administration Yes COR rlgolden@bpa.gov (503) 230-5119
Brad Houslet Confederated Tribes of Warm Springs No Supervisor brad.houslet@ctwsbnr.org (541) 553-2039
Rosemary Mazaika Bonneville Power Administration Yes F&W Approver rxmazaika@bpa.gov (503) 230-5869
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Funding Package - Submit draft to COTR A: 119. Routine administration of project 01/05/2010 09/30/2009
Acquire all EC and permits B: 165. Provide all EC and permits to BPA 03/01/2009 03/01/2009
Well house construction and associated housed equipment and wiring complete C: 171. Construct well house. 08/28/2009 08/28/2009
Pipeline installed D: 171. Install pipeline. 06/26/2009 06/26/2009
Two discharge headers and one standpipe installed at Parkdale Fish Facility. E: 171. Install discharge headers. 07/31/2009 07/31/2009
SCADA alarm monitor installed. G: 61. Install alarm monitor in facility residence 07/31/2009 07/31/2009
Monthly electrical loads determined. H: 61. Determine additional power requirements for well pumps and water heater. 09/30/2009 09/30/2009
Attach Progress Report in Pisces J: 132. Submit Progress Report for the period Aug 2008 thru Feb 2009 10/30/2009
Ensure Parkdale Fish Facility Phase I upgrades meet design specifications and building codes. K: 171. Inspect construction of Phase I upgrades. 09/01/2009 09/01/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 3 instances of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 3 instances of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 3 instances of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 4 instances of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Routine administration of project 02/09/2007
B 165 Provide all EC and permits to BPA 02/09/2007
C 171 Construct well house. 12/17/2008
D 171 Install pipeline. 12/05/2008
E 171 Install discharge headers. 12/17/2008
F 61 Provide emergency power to facility residence. 12/17/2008
G 61 Install alarm monitor in facility residence 12/17/2008
H 61 Determine additional power requirements for well pumps and water heater. 08/05/2000
I 185 Periodic Status Reports for BPA 02/09/2007
J 132 Submit Progress Report for the period Aug 2008 thru Feb 2009 02/09/2007
K 171 Inspect construction of Phase I upgrades. 02/09/2007