Province | Subbasin | % |
---|---|---|
Columbia Gorge | Hood | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Christopher Brun | Confederated Tribes of Warm Springs | Yes | Contract Manager | cbrun@hrecn.net | (541) 352-3548 |
Mickey Carter | Bonneville Power Administration | No | Env. Compliance Lead | macarter@bpa.gov | (503) 230-5885 |
Ryan (HRECN) Gerstenberger | Confederated Tribes of Warm Springs | No | Technical Contact | rgerstenberger@hrecn.net | (541) 352-9326 |
Richard Golden Jr | Bonneville Power Administration | Yes | COR | rlgolden@bpa.gov | (503) 230-5119 |
Brad Houslet | Confederated Tribes of Warm Springs | No | Supervisor | brad.houslet@ctwsbnr.org | (541) 553-2039 |
Rosemary Mazaika | Bonneville Power Administration | Yes | F&W Approver | rxmazaika@bpa.gov | (503) 230-5869 |
Arthur Mitchell | Confederated Tribes of Warm Springs | No | Administrative Contact | arthur.mitchell@wstribes.org | (541) 553-3219 |
Kristi Van Leuven | Bonneville Power Administration | Yes | Contracting Officer | kjvleuven@bpa.gov | (503) 230-3605 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
20,500 PIT tagged steelhead and spring Chinook salmon. | B: 158. PIT tag steelhead and spring Chinook salmon | 09/30/2009 | 09/30/2009 | |
Temperature data at 6 locations | C: 157. Collect temperature data in the Hood River subbasin | 09/30/2009 | 09/30/2009 | |
All fish salvage activities complete | D: 28. Salvage and transport fish entrained in irrigation canals to nearest free-flowing waterbody | 12/29/2008 | 12/29/2008 | |
BY 08- 09 spawning distribution and condition. | E: 157. Spring Chinook and winter steelhead spawning surveys | 09/30/2009 | 09/30/2009 | |
Acclimation data | F: 157. Collect data during acclimation | 05/30/2009 | 05/30/2009 | |
Submit PIT tag codes to PTAGIS database. | G: 159. Input Hood River PIT tag data to appropriate databases | 06/20/2009 | 06/12/2009 | |
Estimate of tribal harvest of spring Chinook in Hood River | H: 157. Spring Chinook salmon run forecast and harvest creel | 09/30/2009 | 09/30/2009 | |
Provide reports to BPA as appropriate | I: 191. Hood River Production Program Coordination | 09/30/2009 | 09/30/2009 | |
Submit 2010 SOW to BPA for environmental compliance review. | J: 165. Ensure environmental compliance is adequate | 07/31/2009 | 07/31/2009 | |
2008 Final Report uploaded to Pisces | K: 132. Annual Report | 08/31/2009 | 08/31/2009 | |
Project administration & coordination complete | L: 119. Manage Project | 09/30/2009 | 09/30/2009 | |
Radio tag and track movements of BY 09 spring Chinook salmon and winter steelhead. | M: 157. Determine spring Chinook and winter steelhead run timing. | 09/30/2009 | 09/30/2009 | |
HRPP Spring Chinook M&E Operational Plan | N: 156. HRPP Revised M&E Operational Plan | 08/28/2009 | ||
Develop preferred pre-smolt capture methods for long-term monitoring | O: 157. Develop chinook pre-smolt sampling technique | 09/30/2009 | 09/30/2009 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened) |
|
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 02/09/2007 | ||||||
B | 158 | PIT tag steelhead and spring Chinook salmon | 09/03/2008 | ||||||
C | 157 | Collect temperature data in the Hood River subbasin | 09/03/2008 | ||||||
D | 28 | Salvage and transport fish entrained in irrigation canals to nearest free-flowing waterbody | 09/03/2008 | ||||||
E | 157 | Spring Chinook and winter steelhead spawning surveys | 09/03/2008 | ||||||
F | 157 | Collect data during acclimation | 09/03/2008 | ||||||
G | 159 | Input Hood River PIT tag data to appropriate databases | 02/09/2007 | ||||||
H | 157 | Spring Chinook salmon run forecast and harvest creel | 09/03/2008 | ||||||
I | 191 | Hood River Production Program Coordination | 02/09/2007 | ||||||
J | 165 | Ensure environmental compliance is adequate | 02/09/2007 | ||||||
K | 132 | Annual Report | 02/09/2007 | ||||||
L | 119 | Manage Project | 02/09/2007 | ||||||
M | 157 | Determine spring Chinook and winter steelhead run timing. | 03/31/2009 | ||||||
N | 156 | HRPP Revised M&E Operational Plan | 02/09/2007 | ||||||
O | 157 | Develop chinook pre-smolt sampling technique | 03/31/2009 |