Province | Subbasin | % |
---|---|---|
Columbia Gorge | Hood | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Submit 2010 SOW to BPA for environmental compliance review. | B: 165. Ensure environmental compliance is adequate | 07/30/2010 | 09/28/2010 | |
20,020 PIT tagged steelhead and spring Chinook salmon. | C: 158. PIT tag steelhead and spring Chinook salmon | 09/30/2010 | 09/28/2010 | |
Monitor water temperatures in the Hood River subbasin | D: 157. Collect temperature data in the Hood River subbasin | 09/30/2010 | 09/28/2010 | |
All fish salvage activities complete | E: 28. Salvage and transport fish entrained in irrigation canals to nearest free-flowing waterbody | 01/08/2010 | 12/18/2009 | |
BY 09- 10 spawning distribution and condition. | F: 157. Spring Chinook spawning surveys | 09/30/2010 | 09/28/2010 | |
Acclimation data | G: 157. Collect data during acclimation | 07/28/2010 | 06/18/2010 | |
Submit PIT tag codes to PTAGIS database. | H: 159. Input Hood River PIT tag data to appropriate databases | 06/30/2010 | 06/17/2010 | |
Estimate of adult spring Chinook salmon returns to Powerdale dam for By 2010 | I: 157. Spring Chinook salmon preseason adult run size forecast. | 04/15/2010 | 04/15/2010 | |
Estimate number of tribally harvest spring Chinook salmon in the Hood River during run year 2010. | J: 157. Spring Chinook salmon tribal harvest monitoring | 09/30/2010 | 09/28/2010 | |
Radio tag and track movements of BY 09-10 winter steelhead and summary of FY 08-10 data. | K: 157. Determine spring Chinook and winter steelhead run timing. | 09/30/2010 | 09/28/2010 | |
Implanted up to 1,500 PIT tags in naturally produced spring Chinook salmon. | L: 157. PIT tag natural origin Hood River spring Chinook salmon pre-smolt | 09/30/2010 | 09/28/2010 | |
Provide reports to BPA as appropriate | M: 191. Hood River Production Program Coordination | 09/30/2010 | 09/28/2010 | |
2009 Final Report uploaded to Pisces | N: 132. Produce FY 2009 Annual Report | 09/30/2010 | 09/28/2010 | |
Project administration & coordination complete | O: 119. Manage Project | 09/30/2010 | 09/20/2010 | |
HRPP Spring Chinook M&E Operational Plan | P: 156. HRPP M&E Operational Plan | 09/30/2010 | 09/28/2010 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened) |
|
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened) |
|
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 02/09/2007 | ||||||
B | 165 | Ensure environmental compliance is adequate | 02/09/2007 | ||||||
C | 158 | PIT tag steelhead and spring Chinook salmon | 07/13/2009 | ||||||
D | 157 | Collect temperature data in the Hood River subbasin | 07/13/2009 | ||||||
E | 28 | Salvage and transport fish entrained in irrigation canals to nearest free-flowing waterbody | 07/13/2009 | ||||||
F | 157 | Spring Chinook spawning surveys | 07/13/2009 | ||||||
G | 157 | Collect data during acclimation | 07/13/2009 | ||||||
H | 159 | Input Hood River PIT tag data to appropriate databases | 02/09/2007 | ||||||
I | 157 | Spring Chinook salmon preseason adult run size forecast. | 07/13/2009 | ||||||
J | 157 | Spring Chinook salmon tribal harvest monitoring | 07/13/2009 | ||||||
K | 157 | Determine spring Chinook and winter steelhead run timing. | 07/13/2009 | ||||||
L | 157 | PIT tag natural origin Hood River spring Chinook salmon pre-smolt | 07/13/2009 | ||||||
M | 191 | Hood River Production Program Coordination | 02/09/2007 | ||||||
N | 132 | Produce FY 2009 Annual Report | 02/09/2007 | ||||||
O | 119 | Manage Project | 02/09/2007 | ||||||
P | 156 | HRPP M&E Operational Plan | 02/09/2007 |