Contract 43767: 1988-053-03 EXP CTWS HOOD RIVER M&E
Project Number:
Title:
Hood River Production Program Monitoring and Evaluation (M&E)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Hood 100.00%
Contract Number:
43767
Contract Title:
1988-053-03 EXP CTWS HOOD RIVER M&E
Contract Continuation:
Previous: Next:
39204: 1988-053-03 EXP CTWS HOOD RIVER M&E
  • 48828: 1988-053-03 EXP CTWS HOOD RIVER M&E
Contract Status:
Closed
Contract Description:
Fisheries Program Manager:  Brad Houslet (541) 553-2039
Fiscal Officer: Arthur Mitchell (541) 553-3219
Hood River Production Program Manager: Chris Brun (541) 352-3548
Technical Contact: Ryan Gerstenberger (541) 352-9326
Address: 6030 Dee Highway, Parkdale, OR 97041

The CTWSRO Hood River Production Program staff will conduct monitoring and evaluation of the existing spring Chinook salmon supplementation program. Activities include determining pre-release smolt quality, out migration timing, duration and residualism. Adult spawning locations, timing and success will be monitored. Run size predictions, harvest recommendations and tribal harvest monitoring will be implemented during FY 10. Project staff will assist ODFW with monitoring of summer/winter steelhead supplementation activities by PIT tagging a portion of pre-release smolts and post-spawning kelts.

Funds from this project will be used to provide a BPA contract to ODFW to support M&E efforts that are essential to completion of HRPP tasks, specifically staffing fall migrant trap operation and scale reading.

FY 10 funds from this project will be used to begin the comparative hatchery release group evaluation. NOAA fisheries staff will be contracted by BPA to conduct year 1 of a 3 year smolt physiology study.

Additionally the CTWSR HRPP will plan for future M&E activities in light of the removal of Powerdale dam in 2010 and completion of the revised HRPP Master Plan. This will include: refining the M&E plan identified in the revised master plan for inclusion in an updated HGMP; PIT tagging natural origin spring Chinook  pre-smolt to determine outmigration timing and SARs.

This will be the final year of determining adult spring Chinook salmon and winter steelhear run timing past the new adult trap locations.  Radio tags will be implanted in winter steelhead during the winter 2010. University of Idaho will be contracted to provide telemetry receivers, technical assistance and complete data summary and analysis for the 2008-2010 data sets.
Account Type(s):
Expense
Contract Start Date:
10/01/2009
Contract End Date:
09/30/2010
Current Contract Value:
$356,365
Expenditures:
$356,365

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Submit 2010 SOW to BPA for environmental compliance review. B: 165. Ensure environmental compliance is adequate 07/30/2010 09/28/2010
20,020 PIT tagged steelhead and spring Chinook salmon. C: 158. PIT tag steelhead and spring Chinook salmon 09/30/2010 09/28/2010
Monitor water temperatures in the Hood River subbasin D: 157. Collect temperature data in the Hood River subbasin 09/30/2010 09/28/2010
All fish salvage activities complete E: 28. Salvage and transport fish entrained in irrigation canals to nearest free-flowing waterbody 01/08/2010 12/18/2009
BY 09- 10 spawning distribution and condition. F: 157. Spring Chinook spawning surveys 09/30/2010 09/28/2010
Acclimation data G: 157. Collect data during acclimation 07/28/2010 06/18/2010
Submit PIT tag codes to PTAGIS database. H: 159. Input Hood River PIT tag data to appropriate databases 06/30/2010 06/17/2010
Estimate of adult spring Chinook salmon returns to Powerdale dam for By 2010 I: 157. Spring Chinook salmon preseason adult run size forecast. 04/15/2010 04/15/2010
Estimate number of tribally harvest spring Chinook salmon in the Hood River during run year 2010. J: 157. Spring Chinook salmon tribal harvest monitoring 09/30/2010 09/28/2010
Radio tag and track movements of BY 09-10 winter steelhead and summary of FY 08-10 data. K: 157. Determine spring Chinook and winter steelhead run timing. 09/30/2010 09/28/2010
Implanted up to 1,500 PIT tags in naturally produced spring Chinook salmon. L: 157. PIT tag natural origin Hood River spring Chinook salmon pre-smolt 09/30/2010 09/28/2010
Provide reports to BPA as appropriate M: 191. Hood River Production Program Coordination 09/30/2010 09/28/2010
2009 Final Report uploaded to Pisces N: 132. Produce FY 2009 Annual Report 09/30/2010 09/28/2010
Project administration & coordination complete O: 119. Manage Project 09/30/2010 09/20/2010
HRPP Spring Chinook M&E Operational Plan P: 156. HRPP M&E Operational Plan 09/30/2010 09/28/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 28 Trap and Haul
  • 7 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 28 Trap and Haul
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 28 Trap and Haul
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/09/2007
B 165 Ensure environmental compliance is adequate 02/09/2007
C 158 PIT tag steelhead and spring Chinook salmon 07/13/2009
D 157 Collect temperature data in the Hood River subbasin 07/13/2009
E 28 Salvage and transport fish entrained in irrigation canals to nearest free-flowing waterbody 07/13/2009
F 157 Spring Chinook spawning surveys 07/13/2009
G 157 Collect data during acclimation 07/13/2009
H 159 Input Hood River PIT tag data to appropriate databases 02/09/2007
I 157 Spring Chinook salmon preseason adult run size forecast. 07/13/2009
J 157 Spring Chinook salmon tribal harvest monitoring 07/13/2009
K 157 Determine spring Chinook and winter steelhead run timing. 07/13/2009
L 157 PIT tag natural origin Hood River spring Chinook salmon pre-smolt 07/13/2009
M 191 Hood River Production Program Coordination 02/09/2007
N 132 Produce FY 2009 Annual Report 02/09/2007
O 119 Manage Project 02/09/2007
P 156 HRPP M&E Operational Plan 02/09/2007