Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 43876: 1997-013-25 EXP YKFP O&M LOWER YAKIMA SUPPLEMENTATION COMPLEX
Project Number:
Title:
Yakima River Operations and Maintenance (O&M) for Hatcheries and Acclimation Sites-Yakima/Klickitat Fisheries Project (YKFP)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
43876
Contract Title:
1997-013-25 EXP YKFP O&M LOWER YAKIMA SUPPLEMENTATION COMPLEX
Contract Continuation:
Previous: Next:
37767: 1997-013-25 EXP YKFP O&M LOWER YAKIMA SUPPLEMENTATION COMPLEX
  • 54890: 1997-013-25 EXP YKFP O&M LOWER YAKIMA SUPPLEMENTATION COMPLEX
Contract Status:
Closed
Contract Description:
The Yakima Coho Project and the Yakima Fall Chinook Project are components of the Yakima/Klickitat Fisheries Project (YKFP).   The YKFP is a project designed to use artificial propagation in an attempt to re-establish, supplement, or increase natural production and harvest opportunities of anadromous salmonids while maintaining the long-term fitness of the target population, and while keeping ecological and genetic impacts on non-target species within specified limits.  The planning, implementation, and evaluation of this project were initially guided by the framework developed by the Regional Assessment of Supplementation Project (RASP 1992), but are currently being reviewed for compliance with the recommendations of the Hatchery Scientific Review Group for the Columbia Basin.  The YKFP is designed as an experiment to resolve uncertainties associated with supplementation.  As a "laboratory," the YKFP will help determine the role of supplementation in increasing natural production of anadromous salmonids.  Both controlled experiments and monitoring and evaluation of natural populations contribute information.  

Consistent with the Pacific Northwest Power Planning Council's (NPPC) Fish and Wildlife Program (NPPC 1994), the objectives of the YKFP are to:
• Enhance existing stocks of anadromous fish in the Yakima and Klickitat river basins, while maintaining genetics and ecological resources.
• Reintroduce stocks formerly present in the basins.
• Apply the knowledge gained through supplementation throughout the Columbia River Basin.
Overall Project objectives are achieved while adhering to all relevant environmental laws and regulations, including National Environmental Policy Act (NEPA) and Endangered Species Act (ESA) requirements
    
The YKFP endorses an adaptive management policy, which allows for Project objectives and strategies to change as new information becomes available from Project experiments, monitoring and evaluation, and literature reviews.  

Wild stocks of coho salmon (Oncorhynchus kisutch) were once widely distributed within the Columbia River Basin.  However, coho salmon probably became extinct in the Yakima River in the early 1980s.  For this reason, efforts to restore coho within the Yakima basin have relied largely upon releases of hatchery coho because wild stocks did not exist to supplement.  Hatchery coho releases began in the Yakima basin in 1983 with the first release of 324,000 Little White Salmon hatchery smolts.  At that time, the program was primarily for harvest augmentation.  

The goal of Yakima Coho Project is to determine the feasibility of re-establishing a naturally spawning coho population and a significant fall fishery for coho within the Yakima River Basin, while keeping adverse ecological impacts within specified limits.  The current status of the program indicates that some natural production is occurring, but the population is driven by the hatchery component.  In order to increase the opportunity for increased local adaptation, the program is planning to increase the number of naturally produced adults that will be used in the broodstock of the hatchery component.

The Yakima Klickitat Fisheries Project's (YKFP) ongoing fall Chinook research program aims to test the application of supplementation principles to the two lower Yakima River fall chinook populations, the mainstem and Marion Drain stocks.  The Marion Drain stock spawns in Marion Drain.  Marion Drain is a man-made 19-mile irrigation return ditch constructed in the early 1900's.  The other Yakima stock, the "mainstem stock", is the most abundant stock in the Yakima sub-basin.  The mainstem stock is genetically similar to the composite stock of upriver bright (URB) fall Chinook in the Columbia River, and the Marion Drain stock is similar to Snake and Deschutes River fall Chinook.  Recent genetic sampling has occurred to determine if the stocks are distinct or if the differences detected in 2006 were the result of small sample sizes from Marion Drain.

Another component of the Fall Chinook program is to evaluate the feasibility of reestablishing the early fall/summer run population in the Yakima River between Wapato and Naches.  Summer run Chinook eggs are collected at Wells dam and transferred to Prosser/Marion Drain for incubation and early rearing, to be released into the lower Naches River.
Account Type(s):
Expense
Contract Start Date:
07/01/2009
Contract End Date:
06/30/2011
Current Contract Value:
$2,939,470
Expenditures:
$2,939,470

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Shirley Alvarado Yakama Confederated Tribes Yes Administrative Contact shirley_alvarado@yakama.com (509) 865-5121x6304
Hannah Dondy-Kaplan Bonneville Power Administration Yes Env. Compliance Lead hadondy-kaplan@bpa.gov (503) 230-4071
Israel Duran Bonneville Power Administration No Interested Party induran@bpa.gov (503) 230-3967
Dave Fast Yakama Confederated Tribes No Technical Contact fast@yakama.com (509) 966-5291
Bill Fiander Yakama Confederated Tribes Yes Contract Manager bfiander@yakama.com (509) 865-5121x6372
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Michael Mayer Bonneville Power Administration Yes Interested Party msmayer@bpa.gov (503) 230-7692
Rosemary Mazaika Bonneville Power Administration No Interested Party rxmazaika@bpa.gov (503) 230-5869
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Mel Sampson Yakama Confederated Tribes Yes Supervisor mel@yakama.com (509) 865-5121x6303
Patricia Smith Bonneville Power Administration Yes COR prsmith@bpa.gov (503) 230-7349
Adrienne Wilson Yakama Confederated Tribes Yes Administrative Contact Adrienne_Wilson@Yakama.com (509) 865-5121x6306


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Reintroduce coho to the Yakima Basin B: 176. 2009-10 Reintroduction of BY08 Coho in the Yakima Basin 06/30/2010 06/30/2010
Reintroduce coho to the Yakima Basin C: 176. 2009-10 Reintroduction of BY09 Coho in the Yakima Basin 06/30/2010 06/30/2010
Increase Yakima River Mainstem Fall Chinook through supplementation D: 176. 2009-10 Supplementation to Increase Yakima Mainstem BY09 Fall Chinook 06/30/2010 06/30/2010
Increase Yakima River Mainstem Fall Chinook through supplementation E: 176. 2009-10 Supplementation to Increase Yakima Mainstem BY08 yearling Fall Chinook 05/31/2010 05/31/2010
Produce Early Fall/Summer Chinook BY09 F: 176. 2009-10 Produce Early Fall/Summer Chinook BY09 05/31/2010 05/31/2010
Increase Marion Drain Fall Chinook through supplementation G: 176. 2009-10 Supplementation to Increase the Marion Drain BY09 Fall Chinook 05/31/2010 05/31/2010
Operate and maintain LYRSR sites. H: 61. 2009-10 Operate & Maintain the Prosser Hatchery, Marion Drain Hatchery & the Acclimation Sites 06/30/2010 06/30/2010
Maintain fish health of LYRSR project fish. I: 60. 2009-10 USFW to Maintain Fish Health/ Lower Yakima River Supplementation and Research Facilities 06/30/2010 06/30/2010
Manage and Administer Projects J: 119. 2009-10 Manage and Administer Projects 06/30/2010 06/30/2010
Produce Monthly Reports K: 141. 2009-10 Produce Monthly Status Reports 06/30/2010 06/30/2010
Prepare Annual Report L: 132. 2009-10 Prepare Annual Report 01/14/2011 01/14/2011
Monitor hatchery water M: 165. 2009-10 Monitor hatchery water 06/30/2010 06/30/2010
New raceways at Marion Drain Hatchery N: 171. 2009-2010 Install raceways at Marion Drain 11/30/2010 03/05/2010
Develop a site plan for Marion Drain Hatchery. O: 175. 2009-10 Develop site plans for Marion Drain Hatchery 06/30/2011 06/30/2011
Participate in ESA/NEPA Compliance for Yakima Basin Monitoring, Evaluation and Fisheries Management P: 165. 2009-10 Participate in ESA/NEPA Compliance for Yakima Basin Monitoring, Evaluation and Fisheries Mgm 06/30/2010 06/30/2010
Develop a Program Master Plan/an initial facility layout & cost estimate Q: 168. 2009-10 Develop a Program Master Plan/an initial facility layout & cost estimate 06/30/2011 06/30/2011
Produce an Annual Operation Plan & an Annual Maintenance Plan R: 174. 2009-10 Produce an Annual Operation Plan & an Annual Maintenance Plan 04/30/2011 06/30/2011
Reintroduce coho to the Yakima Basin S: 176. 2010-11 Reintroduction of BY09 Coho in the Yakima Basin 04/30/2011 05/30/2011
Reintroduce coho to the Yakima Basin T: 176. 2010-11 Reintroduction of BY10 Coho in the Yakima Basin 06/30/2011 06/30/2011
Increase Yakima River Mainstem Fall Chinook through supplementation U: 176. 2010-11 Supplementation to Increase Yakima Mainstem BY2010 Fall Chinook 06/30/2011 06/30/2011
Increase Yakima River Mainstem Fall Chinook through supplementation V: 176. 2010-11 Supplementation to Increase Yakima Mainstem BY09 Fall Chinook 05/31/2011 05/31/2011
Increase Marion Drain Fall Chinook through supplementation W: 176. 2010-11 Supplementation to Increase the Marion Drain BY10 Fall Chinook 05/31/2011 05/31/2011
Operate and maintain LYRSR sites. X: 61. 2010-11 Operate & Maintain the Prosser Hatchery, Marion Drain Hatchery & the Acclimation Sites 06/30/2011 06/30/2011
Maintain fish health of LYRSR project fish. Y: 60. 2010-11 USFW to Maintain Fish Health/ Lower Yakima River Supplementation and Research Facilities. 06/30/2011 06/30/2011
Manage and Administer Projects Z: 119. 2010-11 Manage and Administer Projects 06/30/2011 06/30/2011
Produce Monthly Reports AA: 141. 2010-11 Produce Monthly Status Reports 06/30/2011 06/30/2011
Prepare Annual Report AB: 132. 2010-11 Prepare Annual Report 11/30/2010 11/05/2010
Monitor hatchery water AC: 165. 2010-11 Monitor hatchery water 06/30/2011 06/30/2011
Participate in ESA/NEPA Compliance for Yakima Basin Monitoring, Evaluation and Fisheries Management AD: 165. 2010-11 Participate in ESA/NEPA Compliance for Yakima Basin Monitoring, Evaluation and Fisheries Mgm 06/30/2011 06/30/2011
Develop a well at Marion Drain Hatchery. AE: 34. 2010-11 Develop another well at Marion Drain Hatchery. 06/30/2011 06/30/2011
Purchase and install additional raceways at Marion Drain Hatchery. AF: 171. 2010-11 Install new raceways at Marion Drain Hatchery. 06/30/2011 03/31/2011
Update the Annual Operation Plan & the Annual Maintenance Plan AG: 174. 2010-11 Update the Annual Operation Plan & the Annual Maintenance Plan 04/30/2011 06/30/2011
Develop a Program Master Plan/an initial facility layout & cost estimate AH: 168. 2010-11 Develop a Program Master Plan/an initial facility layout & cost estimate 06/30/2011 06/30/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 34 Develop Alternative Water Source
  • 7 instances of WE 176 Produce Hatchery Fish
  • 2 instances of WE 60 Maintain Fish Health
  • 2 instances of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 2 instances of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
  • 2 instances of WE 168 Council 3-step Process: Step 1
  • 2 instances of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility
Coho (O. kisutch) - Unspecified Population
  • 4 instances of WE 176 Produce Hatchery Fish
  • 2 instances of WE 60 Maintain Fish Health
  • 2 instances of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 2 instances of WE 174 Produce Plan
  • 2 instances of WE 168 Council 3-step Process: Step 1

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 2009-11 Periodic Status Reports for BPA 02/09/2007
B 176 2009-10 Reintroduction of BY08 Coho in the Yakima Basin 10/31/2007
C 176 2009-10 Reintroduction of BY09 Coho in the Yakima Basin 10/31/2007
D 176 2009-10 Supplementation to Increase Yakima Mainstem BY09 Fall Chinook 10/31/2007
E 176 2009-10 Supplementation to Increase Yakima Mainstem BY08 yearling Fall Chinook 10/31/2007
F 176 2009-10 Produce Early Fall/Summer Chinook BY09 08/17/2008
G 176 2009-10 Supplementation to Increase the Marion Drain BY09 Fall Chinook 01/01/2008
H 61 2009-10 Operate & Maintain the Prosser Hatchery, Marion Drain Hatchery & the Acclimation Sites 02/11/2008
I 60 2009-10 USFW to Maintain Fish Health/ Lower Yakima River Supplementation and Research Facilities 02/08/2008
J 119 2009-10 Manage and Administer Projects 02/09/2007
K 141 2009-10 Produce Monthly Status Reports 02/09/2007
L 132 2009-10 Prepare Annual Report 02/09/2007
M 165 2009-10 Monitor hatchery water 02/09/2007
N 171 2009-2010 Install raceways at Marion Drain
O 175 2009-10 Develop site plans for Marion Drain Hatchery 02/09/2007
P 165 2009-10 Participate in ESA/NEPA Compliance for Yakima Basin Monitoring, Evaluation and Fisheries Mgm 02/09/2007
Q 168 2009-10 Develop a Program Master Plan/an initial facility layout & cost estimate 02/09/2007
R 174 2009-10 Produce an Annual Operation Plan & an Annual Maintenance Plan 02/09/2007
S 176 2010-11 Reintroduction of BY09 Coho in the Yakima Basin 01/06/2010
T 176 2010-11 Reintroduction of BY10 Coho in the Yakima Basin 10/31/2007
U 176 2010-11 Supplementation to Increase Yakima Mainstem BY2010 Fall Chinook 09/01/2008
V 176 2010-11 Supplementation to Increase Yakima Mainstem BY09 Fall Chinook 09/01/2008
W 176 2010-11 Supplementation to Increase the Marion Drain BY10 Fall Chinook 01/01/2008
X 61 2010-11 Operate & Maintain the Prosser Hatchery, Marion Drain Hatchery & the Acclimation Sites 02/11/2008
Y 60 2010-11 USFW to Maintain Fish Health/ Lower Yakima River Supplementation and Research Facilities. 02/08/2008
Z 119 2010-11 Manage and Administer Projects 02/09/2007
AA 141 2010-11 Produce Monthly Status Reports 02/09/2007
AB 132 2010-11 Prepare Annual Report 02/09/2007
AC 165 2010-11 Monitor hatchery water 02/09/2007
AD 165 2010-11 Participate in ESA/NEPA Compliance for Yakima Basin Monitoring, Evaluation and Fisheries Mgm 02/09/2007
AE 34 2010-11 Develop another well at Marion Drain Hatchery. 02/16/2011
AF 171 2010-11 Install new raceways at Marion Drain Hatchery.
AG 174 2010-11 Update the Annual Operation Plan & the Annual Maintenance Plan 02/09/2007
AH 168 2010-11 Develop a Program Master Plan/an initial facility layout & cost estimate 02/09/2007