Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 54890: 1997-013-25 EXP YKFP O&M LOWER YAKIMA SUPPLEMENTATION COMPLEX
Project Number:
Title:
Yakima River Operations and Maintenance (O&M) for Hatcheries and Acclimation Sites-Yakima/Klickitat Fisheries Project (YKFP)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
54890
Contract Title:
1997-013-25 EXP YKFP O&M LOWER YAKIMA SUPPLEMENTATION COMPLEX
Contract Continuation:
Previous: Next:
43876: 1997-013-25 EXP YKFP O&M LOWER YAKIMA SUPPLEMENTATION COMPLEX
  • 56662 REL 31: 1997-013-25 EXP YKFP (LOWER YAKIMA) - SUPPLEMENTATION COMPLEX O&M
Contract Status:
Closed
Contract Description:
The Yakima Coho Project and the Yakima Fall Chinook Project are components of the Yakima/Klickitat Fisheries Project (YKFP).   The YKFP is a project designed to use artificial propagation in an attempt to re-establish, supplement, or increase natural production and harvest opportunities of anadromous salmonids while maintaining the long-term fitness of the target population, and while keeping ecological and genetic impacts on non-target species within specified limits.  The planning, implementation, and evaluation of this project were initially guided by the framework developed by the Regional Assessment of Supplementation Project (RASP 1992), but are currently being reviewed for compliance with the recommendations of the Hatchery Scientific Review Group for the Columbia Basin.  The YKFP is designed as an experiment to resolve uncertainties associated with supplementation.  As a "laboratory," the YKFP will help determine the role of supplementation in increasing natural production of anadromous salmonids.  Both controlled experiments and monitoring and evaluation of natural populations contribute information.  

Consistent with the Pacific Northwest Power Planning Council's (NPPC) Fish and Wildlife Program (NPPC 1994), the objectives of the YKFP are to:
• Enhance existing stocks of anadromous fish in the Yakima and Klickitat river basins, while maintaining genetics and ecological resources.
• Reintroduce stocks formerly present in the basins.
• Apply the knowledge gained through supplementation throughout the Columbia River Basin.
Overall Project objectives are achieved while adhering to all relevant environmental laws and regulations, including National Environmental Policy Act (NEPA) and Endangered Species Act (ESA) requirements
    
The YKFP endorses an adaptive management policy, which allows for Project objectives and strategies to change as new information becomes available from Project experiments, monitoring and evaluation, and literature reviews.  

Wild stocks of coho salmon (Oncorhynchus kisutch) were once widely distributed within the Columbia River Basin.  However, coho salmon probably became extinct in the Yakima River in the early 1980s.  For this reason, efforts to restore coho within the Yakima basin have relied largely upon releases of hatchery coho because wild stocks did not exist to supplement.  Hatchery coho releases began in the Yakima basin in 1983 with the first release of 324,000 Little White Salmon hatchery smolts.  At that time, the program was primarily for harvest augmentation.  

The goal of Yakima Coho Project is to determine the feasibility of re-establishing a naturally spawning coho population and a significant fall fishery for coho within the Yakima River Basin, while keeping adverse ecological impacts within specified limits.  The current status of the program indicates that some natural production is occurring, but the population is driven by the hatchery component.  In order to increase the opportunity for increased local adaptation, the program is planning to increase the number of naturally produced adults that will be used in the broodstock of the hatchery component.

The Yakima Klickitat Fisheries Project's (YKFP) ongoing fall Chinook research program aims to test the application of supplementation principles to the two lower Yakima River fall Chinook populations, the mainstem and Marion Drain stocks.  The Marion Drain stock spawns in Marion Drain.  Marion Drain is a man-made 19-mile irrigation return ditch constructed in the early 1900's.  The other Yakima stock, the "mainstem stock", is the most abundant stock in the Yakima sub-basin.  The mainstem stock is genetically similar to the composite stock of upriver bright (URB) fall Chinook in the Columbia River, and the Marion Drain stock is similar to Snake and Deschutes River fall Chinook.  Recent genetic sampling has occurred to determine if the stocks are distinct or if the differences detected in 2006 were the result of small sample sizes from Marion Drain.

Another component of the Fall Chinook program is to evaluate the feasibility of reestablishing the early fall/summer run population in the Yakima River between Wapato and Naches.  Summer run Chinook eggs are collected at Wells dam and transferred to Prosser/Marion Drain for incubation and early rearing, to be released into the lower Naches River.
Account Type(s):
Expense
Contract Start Date:
07/01/2011
Contract End Date:
06/30/2013
Current Contract Value:
$3,303,163
Expenditures:
$3,303,163

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Shirley Alvarado Yakama Confederated Tribes Yes Administrative Contact shirley_alvarado@yakama.com (509) 865-5121x6304
Dave Fast Yakama Confederated Tribes No Technical Contact fast@yakama.com (509) 966-5291
Bill Fiander Yakama Confederated Tribes Yes Contract Manager bfiander@yakama.com (509) 865-5121x6372
Andre L'Heureux Bonneville Power Administration Yes COR allheureux@bpa.gov (503) 230-4482
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Jennifer Lord Bonneville Power Administration Yes Env. Compliance Lead jklord@bpa.gov (503) 230-5192
Rosemary Mazaika Bonneville Power Administration No Interested Party rxmazaika@bpa.gov (503) 230-5869
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Mel Sampson Yakama Confederated Tribes Yes Supervisor mel@yakama.com (509) 865-5121x6303
Adrienne Wilson Yakama Confederated Tribes Yes Administrative Contact Adrienne_Wilson@Yakama.com (509) 865-5121x6306


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Participate in ESA/NEPA Compliance Year 1 B: 165. 2011-12 Participate in ESA/NEPA Compliance Year 1 06/30/2012 06/30/2012
Reintroduce coho to the Yakima Basin C: 176. 2011-12 Reintroduction of BY 2010 Coho in the Yakima Basin 06/30/2012 06/30/2012
Reintroduce coho to the Yakima Basin D: 176. 2011-12 Reintroduction of BY 2011 Coho in the Yakima Basin 06/30/2012 06/30/2012
Increase Yakima River Mainstem Fall Chinook through supplementation E: 176. 2011-12 Supplementation to Increase Yakima Mainstem Fall Chinook (BY11) 06/30/2012 06/30/2012
Increase Yakima River Mainstem Fall Chinook through supplementation F: 176. 2011-12 Supplementation to Increase Yakima Mainstem BY 2010 yearling Fall Chinook 05/31/2012 05/31/2012
Produce Early Fall/Summer Chinook BY11 G: 176. 2011-12 Produce Early Fall/Summer Chinook (sub-yearlings) BY 2011 06/30/2012 06/30/2012
Operate and maintain LYRSR sites. H: 61. 2011-12 Operate & Maintain the Prosser Hatchery, Marion Drain Hatchery & the Acclimation Sites 06/30/2012 06/30/2012
Design New Storage Facility at Prosser Hatchery I: 175. Design New Storage Structure at Prosser hatchery 10/31/2012 06/20/2012
Construction of New Storage Facility at Prosser Hatchery J: 171. Construction of New Storage Structure at Prosser Hatchery 10/31/2012 11/16/2012
Maintain fish health of LYRSR project fish. K: 60. 2011-12 USFW to Maintain Fish Health/ Lower Yakima River Supplementation and Research Faciliti 06/30/2012 06/30/2012
Manage and Administer Projects L: 119. 2011-12 Manage and Administer Projects 06/30/2012 06/30/2012
Produce Monthly Reports M: 141. 2011-12 Produce Monthly Status Reports on Fish Production 06/30/2012 06/30/2012
Prepare Annual Report N: 132. 2011-12 Prepare Annual Report (July 1, 2010 - June 30, 2011) 01/31/2012 02/21/2012
Monitor, Log and Report on hatchery water O: 165. 2011-12 Monitor hatchery water 06/30/2012 06/30/2012
Develop a Coho/Fall Chinook Program Master Plan/an initial facility layout & cost estimate P: 168. 2011-12 Develop a Program Master Plan/an initial facility layout & cost estimate 03/30/2013 02/21/2013
Update the Annual Operation Plan & Annual Maintenance Plan R: 174. 2011-12 Update the Annual Operation Plan & the Annual Maintenance Plan 01/31/2012 01/30/2012
Participate in ESA/NEPA Compliance T: 165. 2012-13 Participate in ESA/NEPA Compliance Year 2 06/30/2013 06/30/2013
Reintroduce coho to the Yakima Basin U: 176. 2012-13 Reintroduction of BY 2011 Coho in the Yakima Basin 06/30/2013 06/30/2013
Reintroduce coho to the Yakima Basin V: 176. 2012-13 Reintroduction of BY 2012 Coho in the Yakima Basin 06/30/2013 06/30/2013
Increase Yakima River Mainstem Fall Chinook through supplementation W: 176. 2012-13 Supplementation to Increase Yakima Mainstem stock BY12 Fall Chinook 06/30/2013 06/30/2013
Increase Yakima River Mainstem Fall Chinook through supplementation X: 176. 2012-13 Supplementation to Increase Yakima Mainstem BY 11 Yearling Fall Chinook 05/31/2013 05/31/2013
Produce Early Fall/Summer Chinook BY12 Y: 176. 2012-13 Produce Early Fall/Summer BY 12 Subyearling Chinook 06/30/2013 06/30/2013
Operate and maintain LYRSRC sites. Z: 61. 2012-13 Operate & Maintain the Prosser Hatchery, Marion Drain Hatchery & the Acclimation Sites 06/30/2013 06/30/2013
Maintain fish health of LYRSR project fish. AA: 60. 2012-13 USFW to Maintain Fish Health/Lower Yak Riv Supp & Research Facilities 06/30/2013 06/30/2013
Manage and Administer Projects AB: 119. 2012-13 Manage and Administer Projects 06/30/2013 06/30/2013
Produce Monthly Fish Production Reports AC: 141. 2012-13 Produce Monthly Fish Production Status Reports 06/30/2013 06/30/2013
Prepare Annual Report July 1, 2011 - June 30, 2012 AD: 132. 2012-13 Prepare Annual Report (July 1, 2011-June 30, 2012) 12/15/2012 11/29/2012
Monitor, Log and Report on hatchery water AE: 165. 2012-13 Monitor hatchery water 06/30/2013 06/30/2013
Update the Annual Operation Plan & the Annual Maintenance Plan AF: 174. 2012-13 Update the Annual Operation Plan & the Annual Maintenance Plan 02/28/2013 06/30/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 6 instances of WE 176 Produce Hatchery Fish
  • 2 instances of WE 60 Maintain Fish Health
  • 2 instances of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 2 instances of WE 174 Produce Plan
  • 2 instances of WE 175 Produce Design
  • 1 instance of WE 168 Council 3-step Process: Step 1
  • 1 instance of WE 169 Council 3-step Process: Step 2
  • 1 instance of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility
Coho (O. kisutch) - Unspecified Population
  • 4 instances of WE 176 Produce Hatchery Fish
  • 2 instances of WE 60 Maintain Fish Health
  • 2 instances of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 2 instances of WE 174 Produce Plan
  • 2 instances of WE 175 Produce Design
  • 1 instance of WE 168 Council 3-step Process: Step 1
  • 1 instance of WE 169 Council 3-step Process: Step 2
  • 1 instance of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 07/01/2011
B 165 2011-12 Participate in ESA/NEPA Compliance Year 1 07/01/2011
C 176 2011-12 Reintroduction of BY 2010 Coho in the Yakima Basin 06/06/2012
D 176 2011-12 Reintroduction of BY 2011 Coho in the Yakima Basin 07/11/2011
E 176 2011-12 Supplementation to Increase Yakima Mainstem Fall Chinook (BY11) 07/11/2011
F 176 2011-12 Supplementation to Increase Yakima Mainstem BY 2010 yearling Fall Chinook 07/11/2011
G 176 2011-12 Produce Early Fall/Summer Chinook (sub-yearlings) BY 2011 07/11/2011
H 61 2011-12 Operate & Maintain the Prosser Hatchery, Marion Drain Hatchery & the Acclimation Sites 07/11/2011
I 175 Design New Storage Structure at Prosser hatchery 07/01/2011
J 171 Construction of New Storage Structure at Prosser Hatchery 09/16/2011
K 60 2011-12 USFW to Maintain Fish Health/ Lower Yakima River Supplementation and Research Faciliti 07/11/2011
L 119 2011-12 Manage and Administer Projects 07/01/2011
M 141 2011-12 Produce Monthly Status Reports on Fish Production 07/01/2011
N 132 2011-12 Prepare Annual Report (July 1, 2010 - June 30, 2011) 07/01/2011
O 165 2011-12 Monitor hatchery water 07/01/2011
P 168 2011-12 Develop a Program Master Plan/an initial facility layout & cost estimate 07/01/2011
Q 169 2011-13 Develop a Program Master Plan/EC Review 07/01/2011
R 174 2011-12 Update the Annual Operation Plan & the Annual Maintenance Plan 07/01/2011
S 175 2011-12 Design an Alternative Water Delivery System for Prosser Hatchery 07/01/2011
T 165 2012-13 Participate in ESA/NEPA Compliance Year 2 07/01/2011
U 176 2012-13 Reintroduction of BY 2011 Coho in the Yakima Basin 04/09/2013
V 176 2012-13 Reintroduction of BY 2012 Coho in the Yakima Basin 04/09/2013
W 176 2012-13 Supplementation to Increase Yakima Mainstem stock BY12 Fall Chinook 04/09/2013
X 176 2012-13 Supplementation to Increase Yakima Mainstem BY 11 Yearling Fall Chinook 04/09/2013
Y 176 2012-13 Produce Early Fall/Summer BY 12 Subyearling Chinook 04/09/2013
Z 61 2012-13 Operate & Maintain the Prosser Hatchery, Marion Drain Hatchery & the Acclimation Sites 11/25/2013
AA 60 2012-13 USFW to Maintain Fish Health/Lower Yak Riv Supp & Research Facilities 04/09/2013
AB 119 2012-13 Manage and Administer Projects 07/01/2011
AC 141 2012-13 Produce Monthly Fish Production Status Reports 07/01/2011
AD 132 2012-13 Prepare Annual Report (July 1, 2011-June 30, 2012) 07/01/2011
AE 165 2012-13 Monitor hatchery water 07/01/2011
AF 174 2012-13 Update the Annual Operation Plan & the Annual Maintenance Plan 07/01/2011