Province | Subbasin | % |
---|---|---|
Columbia Plateau | Yakima | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Attach Progress Report in Pisces | A: 132. Submit Progress Report for the period NOV 2008 to OCT 2009 | 01/14/2010 | 12/31/2009 | |
Funding Package - Submit draft to COTR | C: 119. Manage and Administer Coordination and Administration Contract | 08/01/2010 | 08/01/2010 | |
ISRP Proposal | D: 174. Produce ISRP Proposal for Habitat Project | 02/01/2010 | 02/28/2010 | |
Attend Regional Coordination Meetings | E: 189. Attend Regional Coordination Meetings | 10/31/2010 | 10/31/2010 | |
Participation in & Support for Watershed Coordination meetings | F: 191. Attend & Support Watershed Coordination Meetings | 10/31/2010 | 10/31/2010 | |
Provide Technical Review | G: 122. Provide Technical Review of Proposed Projects | 10/31/2010 | 10/31/2010 | |
2 New Staff Members Hired | H: 98. Recruit New Staff | 05/05/2010 | 12/31/2009 | |
Habitat and environmental data for UCR habitat restoration and protection reaches/sites. | I: 160. Upper Columbia Data Steward | 10/31/2010 | 09/30/2010 | |
Construct a pole building | J: 98. Twisp Pole Building | 10/31/2010 | ||
Produce all "H's" report card and assist with development of reporting tools | K: 141. All “H” Integration Report Card and Assistance with Development of Reporting Tools | 10/31/2010 | 09/30/2010 | |
Produce a data gap analysis and report | L: 162. Data Gap Analysis Update and Report | 10/31/2010 | 09/30/2010 | |
Update the EDT model in the Methow, Entiat and Wenatchee Watersheds | M: 162. Ecosystem Diagnosis and Treatment (EDT) Update | 10/31/2010 | ||
Evaluation and Synthesis of Monitoring Data from the Methow, Entiat and Wenatchee Subbasins | N: 162. Evaluation of Monitoring Data | 10/31/2010 | 09/29/2010 | |
Assist with the State of the Science Conference for the Upper Columbia FY 2010 | O: 191. Host two part workshop on the State of the Science in the UC | 10/31/2010 | 12/31/2009 | |
Produce EC documentation as needed | P: 165. Produce EC Documentation | 06/01/2010 | 05/03/2010 | |
Completed environmental permit applications, submitted to Washington State | Q: 191. Project Permit Development & Coordination | 10/31/2010 | 09/30/2010 | |
ISRP Proposal | R: 174. Amend 1: Produce ISRP Proposal for YRWP M&E | 06/04/2010 | ||
Two new building | S: 98. Amend 1: Modular Office space is needed for expanding staff | 10/07/2010 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU |
|
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened) |
|
Coho (O. kisutch) - Unspecified Population |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 132 | Submit Progress Report for the period NOV 2008 to OCT 2009 | 02/09/2007 | ||||||
B | 185 | Periodic Status Reports for BPA | 02/09/2007 | ||||||
C | 119 | Manage and Administer Coordination and Administration Contract | 02/09/2007 | ||||||
D | 174 | Produce ISRP Proposal for Habitat Project | 02/09/2007 | ||||||
E | 189 | Attend Regional Coordination Meetings | 02/09/2007 | ||||||
F | 191 | Attend & Support Watershed Coordination Meetings | 02/09/2007 | ||||||
G | 122 | Provide Technical Review of Proposed Projects | 02/09/2007 | ||||||
H | 98 | Recruit New Staff | 11/01/2009 | ||||||
I | 160 | Upper Columbia Data Steward | 02/09/2007 | ||||||
J | 98 | Twisp Pole Building | 07/28/2009 | ||||||
K | 141 | All “H” Integration Report Card and Assistance with Development of Reporting Tools | 02/09/2007 | ||||||
L | 162 | Data Gap Analysis Update and Report | 02/09/2007 | ||||||
M | 162 | Ecosystem Diagnosis and Treatment (EDT) Update | 02/09/2007 | ||||||
N | 162 | Evaluation of Monitoring Data | 02/09/2007 | ||||||
O | 191 | Host two part workshop on the State of the Science in the UC | 02/09/2007 | ||||||
P | 165 | Produce EC Documentation | 11/01/2009 | ||||||
Q | 191 | Project Permit Development & Coordination | 11/01/2009 | ||||||
R | 174 | Amend 1: Produce ISRP Proposal for YRWP M&E | 11/01/2009 | ||||||
S | 98 | Amend 1: Modular Office space is needed for expanding staff | 11/01/2009 |