Contract 45428: 2003-017-00 EXP ISEMP - SALMON R. - QUANTITATIVE CONSULTANTS
Project Number:
Title:
Integrated Status and Effectiveness Monitoring Program (ISEMP)
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
45428
Contract Title:
2003-017-00 EXP ISEMP - SALMON R. - QUANTITATIVE CONSULTANTS
Contract Continuation:
Previous: Next:
40950: 2003-017-00 EXP ISEMP - SALMON RIVER - QUANTITATIVE CONSULTANTS
  • 50585: 2003-017-00 EXP ISEMP - SALMON R. QUANTITATIVE CONSULTANTS
Contract Status:
Closed
Contract Description:
NOTE: CCR19845 amendment reflects additional contract funding in support of implementation of PIT tag arrays described in Fast Track proposals for projects 2003-017-00 and 2010-032-00. The Work Elements associated with the contract change request include A 185, AK175, AL70, AM156, AN157, AO159, AP160, AQ161, and AR162. The bulk of the contract modification exactly follows the original fast track proposal for project 2003-017-00. An additional $5,561.47 will be transferred to CCR19845 from fast track proposal 2010-032-00 to enable contract 45428 CCR19845 to administer satellite communications and propane for the upper Imnaha River and Big Sheep Creek PIT tag arrays originally proposed under fast track proposal 2010-032-00. CCR19845 includes three subcontracts:
1. The Nez Perce Tribe subcontract funds cultural resources surveys for the upper Imnaha River, lower Imnaha River, Joseph Creek, Big Sheep Creek, Grande Ronde, Lolo Creek, and South Fork Clearwater PIT tag arrays. This subcontract also funds a full-time biologist to conduct daily operations of the aforementioned PIT tag arrays, including routine operations and maintenance responsibilities, troubleshooting, and raw data manipulation. Lastly, this subcontract funds the NPT database administrator to assist in development of the ISEMP databank, which will house and distribute data generated by the PIT tag arrays. This subcontract is associated with Work Elements AH165, AK175, AL70, AN157, AP160, and AR162.
2. The Idaho Department of Fish and Game subcontract funds IDFG employees to attend training on routine operations and maintenance and  troubleshooting specific to PIT tag arrays located in the Middle Fork and Upper Salmon Rivers. IDFG was selected to conduct routine operations actions at these sites owing to the proximity of the sites to current IDFG monitoring infrastructure (rotary screw traps). This subcontract is described in Work Element AM156.
3. The Northwind Environmental subcontract funds Northwind Environmental, Inc. to conduct a cultural resources survey at the sites proposed for PIT tag array installation on the mainstem upper Salmon River. Northwind Environmental was selected for this task owing to their familiarity with the upper Salmon River, and demonstrated performance in a prior cultural resources survey conducted for ISEMP under contract 40950. This subcontract supports Work Element AH165.


Since its inception in FY2003, Project #2003-017-00 (the Integrated Status and Effectiveness Monitoring Program; ISEMP) has been developing two novel monitoring and evaluation programs: (i) subbasin-scale pilot status and trend monitoring efforts for anadromous salmonids and their habitat in the Wenatchee/Entiat, John Day and South Fork Salmon River basins, and (ii) effectiveness monitoring for suites of habitat restoration projects in selected watersheds within the three target subbasins. This work - critical for implementing the 2000 NMFS FCRPS Biological Opinion (RPA Actions 180, 181, and 183) (BiOp) and UPAs from the 2004 BiOp - builds on current status and trend monitoring programs within each of these basins. Several regional and local organizations are funding and implementing these programs. In short, this project has integrated existing and new monitoring and evaluation activities in three pilot subbasins to help ensure that provisions of the BiOp are satisfied. This contract is one of several contracts that will implement this project. The final report for this contract will contain data that will 1) be submitted to NOAA Fisheries (also a contractor under this project) for use in a project level integrated Annual Report and 2) be submitted to BPA as a contract final report according to the terms of this contract.  Quantitative Consultants, Inc.  role has been, and continues to be, to enable the Bonneville Power Administration to implement Project #2003-017-00 in the Salmon River subbasin and other pilot subbasins.

The Salmon portion of the ISEMP project began in 2005 with the completion of a study design (attached and available at http://www.nwfsc.noaa.gov/research/divisions/cbd/mathbio/isemp/docs_salmon.cfm#2005), which received a positive review by the Independent Scientific Review Panel in 2006 (ISRP 2006-1; attached and available at http://www.nwfsc.noaa.gov/research/divisions/cbd/mathbio/isemp/docs_salmon.cfm#2005). Implementation of the ISEMP project in the Salmon subbasin was funded in FY2008, with on-the-ground actions commencing in FY2009.
Account Type(s):
Expense
Contract Start Date:
12/01/2009
Contract End Date:
11/30/2010
Current Contract Value:
$1,613,355
Expenditures:
$1,613,355

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Time and Materials
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Christopher Beasley Quantitative Consultants Inc Yes Contract Manager chris@qcinc.org (360) 620-2883
Nick Bouwes Eco Logical Research Yes Interested Party nbouwes@gmail.com (435) 760-0771
David Byrnes Bonneville Power Administration Yes COR dmbyrnes@bpa.gov (503) 230-3171
Matthew Campbell Idaho Department of Fish and Game (IDFG) No Interested Party matthew.campbell@idfg.idaho.gov (208) 939-6713
Mickey Carter Bonneville Power Administration No Interested Party macarter@bpa.gov (503) 230-5885
Israel Duran Bonneville Power Administration No Env. Compliance Lead induran@bpa.gov (503) 230-3967
Chris Jordan National Oceanic and Atmospheric Administration Yes Supervisor chris.jordan@noaa.gov (541) 754-4629
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Pamela Nelle Terraqua, Inc. Yes Interested Party pamela@terraqua.biz (509) 885-8143
Charles Petrosky Idaho Department of Fish and Game (IDFG) No Interested Party cpetrosk@idfg.idaho.gov
Steve Rentmeester Environmental Data Services Yes Interested Party environmentaldataservices@gmail.com (503) 247-8431
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Jason Vogel Nez Perce Tribe No Technical Contact jasonv@nezperce.org (208) 621-3602
Carol (VC) Volk Volk Consulting Yes Interested Party volkconsulting@gmail.com (206) 240-0301
Jody White Quantitative Consultants Inc Yes Interested Party jody@qcinc.org (208) 860-5269


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance Documentation B: 165. Environmental Compliance Documentation 05/01/2010 05/01/2010
Funding Package - Submit draft to COTR C: 119. Project Management 09/01/2010 09/30/2010
Produce Draft Progress Report D: 132. Complete Draft Progress Report for the period (Dec 2009) to (Nov 2010) 11/30/2010
Task 1A: Juvenile sampling and marking data. E: 157. Task 1A: Conduct juvenile seining and PIT tagging activities in the South Fork Salmon River. 11/30/2010 11/30/2010
Task 1A: Juvenile tagging data. F: 158. Task 1A: Mark/Tag juvenile anadromous salmonids captured in seining surveys. 11/30/2010 11/30/2010
Task 1C: Juvenile sampling and marking data. G: 157. Task 1B: Conduct juvenile seining and PIT tagging activities in the Lemhi River. 11/30/2010 11/30/2010
Task 1C: Juvenile tagging data. H: 158. Task 1B: Mark/Tag juvenile anadromous salmonids captured in seining surveys. 11/30/2010 11/30/2010
Task 2: Lemhi River habitat survey data. I: 157. Task 2: Lemhi River habitat sampling and LiDAR validation. 11/30/2010 11/30/2010
Task 3A: Report on PIT tag array performance and PIT tag detections. J: 157. Task 3A: Operate PIT tag Arrays in South Fork Salmon River. 11/30/2010 11/30/2010
Task 3B: Report on PIT tag array performance and PIT tag detections. K: 157. Task 3B: Operate PIT tag Arrays in the Lemhi River. 11/30/2010 11/30/2010
Task 4A: Install/remove rotary screw traps. L: 70. Task 4A: Install/remove South Fork Salmon River rotary screw traps. 11/30/2010 11/30/2010
Task 4A: Report juvenile capture data, biological information, and PIT tagging data for SFSR traps. M: 157. Task 4A: Operate ISEMP screw traps in South Fork Salmon River. 11/30/2010 11/30/2010
Task 4B: Install/remove rotary screw traps. N: 70. Task 4B: Assist in installation/removal of Lemhi River rotary screw traps. 11/15/2010 11/15/2010
Task 4B: Report juvenile capture data, biological information, and PIT tagging data for Lemhi traps. O: 157. Task 4B: Assist in operation of screw traps in Lemhi River. 11/30/2010 11/30/2010
Task 5: Lower Granite Dam adult PIT tagging and biological sample data. P: 157. Task 5: Lower Granite Dam adult PIT tagging and data synthesis. 11/30/2010 11/30/2010
Task 5: Conduct adult PIT tagging. Q: 158. Task 5: Lower Granite Dam adult PIT tagging. 11/30/2010 11/30/2010
Enter data using Automated Template Module in ISEMP Database R: 159. Enter data using Automated Template Module in ISEMP Database (IDFG) 11/30/2010 11/30/2010
Enter data using Automated Template Module in ISEMP Database S: 159. Enter data using Automated Template Module in ISEMP Database (Nez Perce Tribe) 11/30/2010 11/30/2010
Salmon and John Day subbasin Database support and data QA/QC T: 160. Manage databases for Salmon and John Day sub-basins 11/30/2010 11/30/2010
Database trainings and data migration assistance to John Day and Salmon basins U: 161. Database training and support for Salmon and John Day basins 11/30/2010 11/30/2010
Salmon Subbasin Data Analysis V: 162. ISEMP Salmon subbasin data analysis 11/30/2010
ISEMP Regional Data Analysis W: 162. ISEMP Regional Data Analysis 11/30/2010
Produce ISEMP funded activities annual report (IDFG) X: 141. Produce Annual Report on ISEMP Activities (IDFG) 11/30/2010
Produce ISEMP funded activities annual report (IDFG) Y: 141. Produce Annual Report on ISEMP Activities (Nez Perce) 11/30/2010
ISEMP Salmon Subbasin Annual Report Review Z: 122. ISEMP Salmon Subbasin Annual Report Review 11/30/2010
ISEMP Coordination (QCI) AA: 189. ISEMP Project Coordination (QCI) 11/30/2010 11/30/2010
ISEMP Project Coordination (IDFG) AB: 189. ISEMP Project Coordination (IDFG) 11/30/2010 11/30/2010
ISEMP Project Coordination (NPT) AC: 189. ISEMP Project Coordination (Nez Perce) 11/30/2010 11/30/2010
ISEMP Salmon Subbasin Coordination (QCI) AD: 191. ISEMP Salmon Subbasin Coordination (QCI) 11/30/2010 11/30/2010
ISEMP Salmon Subbasin Coordination (IDFG) AE: 191. ISEMP Salmon Subbasin Coordination (IDFG) 11/30/2010 11/30/2010
ISEMP Salmon Subbasin Coordination (NPT) AF: 191. ISEMP Salmon Subbasin Coordination (Nez Perce) 11/30/2010 11/30/2010
ISEMP Annual Review AG: 141. ISEMP Annual Draft Report Review 11/30/2010
Obtain permits for installation of PIT tag arrays proposed under the fast-track proposal process. AH: 165. Obtain permits for installation of PIT tag arrays proposed under the fast-track proposal process. 09/15/2010 09/15/2010
Manage PIT tag array installation for PIT tag arrays proposed under the fast-track review process. AI: 119. Manage PIT tag array installation for PIT tag arrays proposed under the fast-track review process. 11/30/2010 11/30/2010
Annual report describing implementation of PIT tag arrays proposed in the fast-track process. AJ: 132. Submit Progress Report for the period (05/2010) to (11/2010) 11/30/2010
Conduct site surveys to identify primary and backup location for PIT tag arrays. AK: 175. Conduct site surveys to identify primary and backup location for PIT tag arrays. 07/15/2010 09/30/2010
Assist in installation of PIT tag arrays. AL: 70. Assist in installation of PIT tag arrays. 11/30/2010 11/30/2010
Train Idaho Department of Fish and Game Personnel to maintain PIT tag arrays. AM: 156. Train Idaho Department of Fish and Game Personnel to maintain PIT tag arrays. 10/30/2010 10/30/2010
Operate PIT tag arrays proposed for funding under the fast-track process. AN: 157. Operate PIT tag arrays proposed for funding under the fast-track process. 11/30/2010 11/30/2010
Transfer PIT tag array data to QCInc server, STEM databank, and PTAGIS. AO: 159. Transfer PIT tag array data to QCInc server, STEM databank, and PTAGIS. 11/30/2010 11/30/2010
Program and maintain PIT tag array data storage system. AP: 160. Program and maintain PIT tag array data storage system. 09/15/2010 09/15/2010
Transfer PIT tag array data to regional databases, comanagers, and serve summary data to public. AQ: 161. Transfer PIT tag array data to regional databases, comanagers, and serve summary data to public. 10/01/2010 10/01/2010
Develop and test methods to calculate instantaneous and periodic PIT tag array efficiency. AR: 162. Develop and test methods to calculate instantaneous and periodic PIT tag array efficiency. 11/30/2010 11/30/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 175 Produce Design
  • 3 instances of WE 70 Install Fish Monitoring Equipment
  • 8 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 158 Mark/Tag Animals
  • 3 instances of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 2 instances of WE 161 Disseminate Raw/Summary Data and Results
  • 3 instances of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 175 Produce Design
  • 3 instances of WE 70 Install Fish Monitoring Equipment
  • 9 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 158 Mark/Tag Animals
  • 3 instances of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 2 instances of WE 161 Disseminate Raw/Summary Data and Results
  • 3 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 12/01/2009
B 165 Environmental Compliance Documentation 12/01/2009
C 119 Project Management 12/01/2009
D 132 Complete Draft Progress Report for the period (Dec 2009) to (Nov 2010) 12/01/2009
E 157 Task 1A: Conduct juvenile seining and PIT tagging activities in the South Fork Salmon River. 12/01/2009
F 158 Task 1A: Mark/Tag juvenile anadromous salmonids captured in seining surveys. 12/01/2009
G 157 Task 1B: Conduct juvenile seining and PIT tagging activities in the Lemhi River. 12/01/2009
H 158 Task 1B: Mark/Tag juvenile anadromous salmonids captured in seining surveys. 12/01/2009
I 157 Task 2: Lemhi River habitat sampling and LiDAR validation. 12/01/2009
J 157 Task 3A: Operate PIT tag Arrays in South Fork Salmon River. 12/01/2009
K 157 Task 3B: Operate PIT tag Arrays in the Lemhi River. 12/01/2009
L 70 Task 4A: Install/remove South Fork Salmon River rotary screw traps. 12/01/2009
M 157 Task 4A: Operate ISEMP screw traps in South Fork Salmon River. 12/01/2009
N 70 Task 4B: Assist in installation/removal of Lemhi River rotary screw traps. 12/01/2009
O 157 Task 4B: Assist in operation of screw traps in Lemhi River. 12/01/2009
P 157 Task 5: Lower Granite Dam adult PIT tagging and data synthesis. 12/01/2009
Q 158 Task 5: Lower Granite Dam adult PIT tagging. 12/01/2009
R 159 Enter data using Automated Template Module in ISEMP Database (IDFG) 12/01/2009
S 159 Enter data using Automated Template Module in ISEMP Database (Nez Perce Tribe) 12/01/2009
T 160 Manage databases for Salmon and John Day sub-basins 12/01/2009
U 161 Database training and support for Salmon and John Day basins 12/01/2009
V 162 ISEMP Salmon subbasin data analysis 12/01/2009
W 162 ISEMP Regional Data Analysis 12/01/2009
X 141 Produce Annual Report on ISEMP Activities (IDFG) 12/01/2009
Y 141 Produce Annual Report on ISEMP Activities (Nez Perce) 12/01/2009
Z 122 ISEMP Salmon Subbasin Annual Report Review 12/01/2009
AA 189 ISEMP Project Coordination (QCI) 12/01/2009
AB 189 ISEMP Project Coordination (IDFG) 12/01/2009
AC 189 ISEMP Project Coordination (Nez Perce) 12/01/2009
AD 191 ISEMP Salmon Subbasin Coordination (QCI) 12/01/2009
AE 191 ISEMP Salmon Subbasin Coordination (IDFG) 12/01/2009
AF 191 ISEMP Salmon Subbasin Coordination (Nez Perce) 12/01/2009
AG 141 ISEMP Annual Draft Report Review 12/01/2009
AH 165 Obtain permits for installation of PIT tag arrays proposed under the fast-track proposal process. 12/01/2009
AI 119 Manage PIT tag array installation for PIT tag arrays proposed under the fast-track review process. 12/01/2009
AJ 132 Submit Progress Report for the period (05/2010) to (11/2010) 12/01/2009
AK 175 Conduct site surveys to identify primary and backup location for PIT tag arrays. 12/01/2009
AL 70 Assist in installation of PIT tag arrays. 05/28/2010
AM 156 Train Idaho Department of Fish and Game Personnel to maintain PIT tag arrays. 12/01/2009
AN 157 Operate PIT tag arrays proposed for funding under the fast-track process. 12/01/2009
AO 159 Transfer PIT tag array data to QCInc server, STEM databank, and PTAGIS. 12/01/2009
AP 160 Program and maintain PIT tag array data storage system. 12/01/2009
AQ 161 Transfer PIT tag array data to regional databases, comanagers, and serve summary data to public. 12/01/2009
AR 162 Develop and test methods to calculate instantaneous and periodic PIT tag array efficiency. 12/01/2009