Contract 46273 REL 28: 2003-017-00 EXP ISEMP - NOAA FISHERIES COORDINATION & PROJ DESIGN
Project Number:
Title:
Integrated Status and Effectiveness Monitoring Program (ISEMP)
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
46273 REL 28
Contract Title:
2003-017-00 EXP ISEMP - NOAA FISHERIES COORDINATION & PROJ DESIGN
Contract Continuation:
Previous: Next:
46273 REL 8: 2003-017-00 EXP ISEMP - NOAA FISH. COORDINATION & PROJ. DESIGN
  • 46273 REL 48: 2003-017-00 EXP ISEMP - NOAA FISHERIES COORDINATION - PROJ DESIGN
Contract Status:
Closed
Contract Description:
****
Note regarding property inventory:  

Prior Contract 35962 -- NOAA-Fisheries

Digital Angel FS1001M Multiplexing PIT tag transceiver  S/N 7100  Acquisition Date 2/1/09  Cost: $8,500 POC: Chris Jordan 541.754.4629
Digital Angel FS1001M Multiplexing PIT tag transceiver  S/N 7101  Acquisition Date 2/1/09  Cost: $8,500 POC: Chris Jordan 541.754.4629

Prior Contract 41715 -- NOAA-Fisheries

Digital Angel FS1001M Multiplexing PIT tag transceiver  S/N 7188  Acquisition Date 3/10/10  Cost: $8,500 POC: Chris Jordan 541.754.4629
Digital Angel FS1001M Multiplexing PIT tag transceiver  S/N 7189  Acquisition Date 3/10/10  Cost: $8,500 POC: Chris Jordan 541.754.4629
Digital Angel FS1001M Multiplexing PIT tag transceiver  S/N 7190  Acquisition Date 3/10/10  Cost: $8,500 POC: Chris Jordan 541.754.4629
Digital Angel FS1001M Multiplexing PIT tag transceiver  S/N 7194  Acquisition Date 3/10/10  Cost: $8,500 POC: Chris Jordan 541.754.4629
Digital Angel FS1001M Multiplexing PIT tag transceiver  S/N 7195  Acquisition Date 3/10/10  Cost: $8,500 POC: Chris Jordan 541.754.4629

Prior Contract 46273 Rel 8 -- NOAA-Fisheries

Global Thermoelectric 5060 Peltier Generator S/N 5060-7313-S1K  Acquisition Date 10/1/10  Cost: $6,540 POC: Chris Jordan 541.754.4629

****

This project seeks to develop two novel monitoring and evaluation programs: (i) subbasin-scale pilot status and trend monitoring efforts for anadromous salmonids and their habitat in the Wenatchee, John Day and Salmon River basins, and (ii) effectiveness monitoring for suites of habitat restoration projects in selected watersheds within the three target subbasins.  This work builds on current status and trend monitoring programs within each of these basins; however, the proposed work differs structurally from much of the ongoing status and trend monitoring work as it focuses on the explicit development and testing of the sampling protocols and methodologies required for generating habitat and population monitoring data of known spatio-temporal resolution, accuracy and precision.  The proposed work expands on the utility of status monitoring data to explicitly address watershed-scale questions of habitat restoration action effectiveness.  The ultimate objective of the project is to develop an end-to-end data gathering to analysis system that supports tributary habitat off-site mitigation actions.

This contract's specific portion of the entire project (2003-017-00) will address overall coordination tasks.  The overall technical and scientific coordination of the project will be accomplished by the project sponsor (NMFS/NWFSC, Dr. Chris Jordan) through this contract.  

This contract will also cover three additional technical coordination tasks: data collation to support initial design and scoping, data management system design and development, and statistical support for project data analysis.  These tasks fall under the overarching heading of technical project management, and are identified as individual tasks as they will be accomplished through a variety of subcontracting vehicles initiated by the project sponsor.

The role of actions under this contract are to integrate and oversee all other ISEMP (2003-017) contract and cost-share actions.  As a result, some WEs appear redundant with other contracts; however, these are shared tasks and tasks where direct NOAA staff or contractor participation is necessary.  All potential WE overlap is identified in the WE description.

**********
Account Type(s):
Expense
Contract Start Date:
07/01/2011
Contract End Date:
06/30/2012
Current Contract Value:
$438,853
Expenditures:
$438,853

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Christopher Beasley Quantitative Consultants Inc Yes Interested Party chris@qcinc.org (360) 620-2883
David Byrnes Bonneville Power Administration Yes COR dmbyrnes@bpa.gov (503) 230-3171
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Chris Jordan National Oceanic and Atmospheric Administration Yes Contract Manager chris.jordan@noaa.gov (541) 754-4629
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Pamela Nelle Terraqua, Inc. Yes Interested Party pamela@terraqua.biz (509) 885-8143
Mary Nolting National Oceanic and Atmospheric Administration No Administrative Contact mary.nolting@noaa.gov (206) 860-3232
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Carol (VC) Volk Volk Consulting Yes Supervisor volkconsulting@gmail.com (206) 240-0301
Michael Ward Terraqua, Inc. Yes Technical Contact mike@terraqua.biz (509) 486-2426
Jody White Quantitative Consultants Inc Yes Interested Party jody@qcinc.org (208) 860-5269


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
In-water work -- Beaver Dam Support A: 29. Install Beaver Dam Support structures 12/01/2011 12/01/2011
Beaver Pond and BDS monitoring data B: 157. Monitor Beaver Dam Support structures 06/30/2012 06/30/2012
Enterprise-level tools to manage project data C: 160. Develop pilot enterprise-level data management system 06/30/2012 06/30/2012
PIT tag antenna design standardization D: 156. PIT tag antenna design and installation 06/30/2012 06/30/2012
ISEMP Project Data Reduction and Analysis E: 162. ISEMP data analysis coordination 06/30/2012 06/30/2012
Social structure underlying community of practice fish and habitat monitoring and restoration work. F: 162. Develop models of learning and information flow 06/30/2012 06/30/2012
Funding Package - Submit draft to COTR G: 119. Manage and Administer Projects 03/01/2012 03/01/2012
Support development of CHaMP Annual Lessons Learned/Synthesis Report H: 132. Support development of CHaMP Annual Synthesis Report 01/31/2012 03/31/2012
Environmental Compliance supporting documentation I: 165. Environmental Compliance 12/31/2011 12/31/2011
Final Approved Annual Report uploaded to BPA web site K: 132. Combined Annual report of all project participants 06/30/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 29 Install Beaver Dam Support structures 05/12/2011
B 157 Monitor Beaver Dam Support structures 05/01/2011
C 160 Develop pilot enterprise-level data management system 05/01/2011
D 156 PIT tag antenna design and installation 05/01/2011
E 162 ISEMP data analysis coordination 05/01/2011
F 162 Develop models of learning and information flow 05/01/2011
G 119 Manage and Administer Projects 05/01/2011
H 132 Support development of CHaMP Annual Synthesis Report 07/01/2011
I 165 Environmental Compliance 05/01/2011
J 185 Periodic Status Reports for BPA 05/01/2011
K 132 Combined Annual report of all project participants 05/01/2011