A | 29 | Increase Aquatic and/or Floodplain Complexity | Install Beaver Dam Support structures | Fieldwork. Install beaver dam support (BDS) structures in Bridge Ck as specified by EC, annual work plan and ISEMP Bridge Ck. IMW experimental design.
This WE is integrated with, but does not duplicate any work specified by, contract 50685 WE N (Eco Logical Research Inc). This WE will provide field technicians through existing NOAA contracting vehicles to assist with ISEMP restoration actions in Bridge Ck. | A | EC | Environmental compliance requirements complete | 07/01/2011 | 07/15/2011 | Concluded | Chris Jordan | 05/05/2011 4:18 PM |
A | 29 | Increase Aquatic and/or Floodplain Complexity | Install Beaver Dam Support structures | Fieldwork. Install beaver dam support (BDS) structures in Bridge Ck as specified by EC, annual work plan and ISEMP Bridge Ck. IMW experimental design.
This WE is integrated with, but does not duplicate any work specified by, contract 50685 WE N (Eco Logical Research Inc). This WE will provide field technicians through existing NOAA contracting vehicles to assist with ISEMP restoration actions in Bridge Ck. | B | Suggested | Site Plan to include maps, structure types and locations. | 07/01/2011 | 09/01/2011 | Concluded | Chris Jordan | 05/03/2011 11:00 AM |
A | 29 | Increase Aquatic and/or Floodplain Complexity | Install Beaver Dam Support structures | Fieldwork. Install beaver dam support (BDS) structures in Bridge Ck as specified by EC, annual work plan and ISEMP Bridge Ck. IMW experimental design.
This WE is integrated with, but does not duplicate any work specified by, contract 50685 WE N (Eco Logical Research Inc). This WE will provide field technicians through existing NOAA contracting vehicles to assist with ISEMP restoration actions in Bridge Ck. | C | Suggested | Materials for structures purchased and staged at implementation sites | 07/01/2011 | 09/01/2011 | Concluded | Chris Jordan | 05/03/2011 11:00 AM |
A | 29 | Increase Aquatic and/or Floodplain Complexity | Install Beaver Dam Support structures | Fieldwork. Install beaver dam support (BDS) structures in Bridge Ck as specified by EC, annual work plan and ISEMP Bridge Ck. IMW experimental design.
This WE is integrated with, but does not duplicate any work specified by, contract 50685 WE N (Eco Logical Research Inc). This WE will provide field technicians through existing NOAA contracting vehicles to assist with ISEMP restoration actions in Bridge Ck. | D | Suggested | Completion of all structure implementation for the specific system | 08/01/2011 | 10/31/2011 | Concluded | Chris Jordan | 05/03/2011 11:00 AM |
A | 29 | Increase Aquatic and/or Floodplain Complexity | Install Beaver Dam Support structures | Fieldwork. Install beaver dam support (BDS) structures in Bridge Ck as specified by EC, annual work plan and ISEMP Bridge Ck. IMW experimental design.
This WE is integrated with, but does not duplicate any work specified by, contract 50685 WE N (Eco Logical Research Inc). This WE will provide field technicians through existing NOAA contracting vehicles to assist with ISEMP restoration actions in Bridge Ck. | E | DELIV | In-water work -- Beaver Dam Support | | 12/01/2011 | Concluded | Chris Jordan | 05/03/2011 11:00 AM |
B | 157 | Collect/Generate/Validate Field and Lab Data | Monitor Beaver Dam Support structures | Fieldwork. Monitoring the status and condition of beaver ponds and Beaver Dam Support (BDS) structures in Bridge and Murderers Ck. | A | EC | Environmental compliance requirements complete | 07/01/2011 | 07/15/2011 | Concluded | Chris Jordan | 05/05/2011 4:19 PM |
B | 157 | Collect/Generate/Validate Field and Lab Data | Monitor Beaver Dam Support structures | Fieldwork. Monitoring the status and condition of beaver ponds and Beaver Dam Support (BDS) structures in Bridge and Murderers Ck. | B | | Seasonal beaver pond monitoring | 09/01/2011 | 05/01/2012 | Concluded | Chris Jordan | 05/03/2011 11:06 AM |
B | 157 | Collect/Generate/Validate Field and Lab Data | Monitor Beaver Dam Support structures | Fieldwork. Monitoring the status and condition of beaver ponds and Beaver Dam Support (BDS) structures in Bridge and Murderers Ck. | C | | Seasonal BDS monitoring | 09/01/2011 | 06/01/2012 | Concluded | Chris Jordan | 05/03/2011 11:06 AM |
B | 157 | Collect/Generate/Validate Field and Lab Data | Monitor Beaver Dam Support structures | Fieldwork. Monitoring the status and condition of beaver ponds and Beaver Dam Support (BDS) structures in Bridge and Murderers Ck. | D | DELIV | Beaver Pond and BDS monitoring data | | 06/30/2012 | Concluded | Chris Jordan | 05/03/2011 11:06 AM |
C | 160 | Create/Manage/Maintain Database | Develop pilot enterprise-level data management system | Due to the large-scale data collection effort undertaken by ISEMP, and the project's goal of data analysis and interpretation, the project must develop its own approach to data management that takes into explicit account the versioning of protocols, the spatial/temporal representativeness of the data elements, the data flow from generators to managers, and ultimately, the output of data to data analysts. As such, the project will develop novel tools for the management and communication of monitoring data, monitoring data collection protocols and monitoring data flow. In addition, these tools will be implemented on a sub-basin scale and offered to the co-manager community to facilitate all of the above objectives. (SDM). This WE specifically involves the following actions: maintain, enhance and document Status and Trend Effectiveness Monitoring (STEM) database; maintain, enhance and document STEM data query and delivery website. | A | | Load data into STEM database | 07/01/2011 | 06/30/2012 | Concluded | Chris Jordan | 05/04/2011 2:56 PM |
C | 160 | Create/Manage/Maintain Database | Develop pilot enterprise-level data management system | Due to the large-scale data collection effort undertaken by ISEMP, and the project's goal of data analysis and interpretation, the project must develop its own approach to data management that takes into explicit account the versioning of protocols, the spatial/temporal representativeness of the data elements, the data flow from generators to managers, and ultimately, the output of data to data analysts. As such, the project will develop novel tools for the management and communication of monitoring data, monitoring data collection protocols and monitoring data flow. In addition, these tools will be implemented on a sub-basin scale and offered to the co-manager community to facilitate all of the above objectives. (SDM). This WE specifically involves the following actions: maintain, enhance and document Status and Trend Effectiveness Monitoring (STEM) database; maintain, enhance and document STEM data query and delivery website. | B | | Maintain and update STEM database | 07/01/2011 | 06/30/2012 | Concluded | Chris Jordan | 05/04/2011 2:56 PM |
C | 160 | Create/Manage/Maintain Database | Develop pilot enterprise-level data management system | Due to the large-scale data collection effort undertaken by ISEMP, and the project's goal of data analysis and interpretation, the project must develop its own approach to data management that takes into explicit account the versioning of protocols, the spatial/temporal representativeness of the data elements, the data flow from generators to managers, and ultimately, the output of data to data analysts. As such, the project will develop novel tools for the management and communication of monitoring data, monitoring data collection protocols and monitoring data flow. In addition, these tools will be implemented on a sub-basin scale and offered to the co-manager community to facilitate all of the above objectives. (SDM). This WE specifically involves the following actions: maintain, enhance and document Status and Trend Effectiveness Monitoring (STEM) database; maintain, enhance and document STEM data query and delivery website. | C | | Data analysis and delivery support | 10/01/2011 | 06/30/2012 | Concluded | Chris Jordan | 05/04/2011 2:56 PM |
C | 160 | Create/Manage/Maintain Database | Develop pilot enterprise-level data management system | Due to the large-scale data collection effort undertaken by ISEMP, and the project's goal of data analysis and interpretation, the project must develop its own approach to data management that takes into explicit account the versioning of protocols, the spatial/temporal representativeness of the data elements, the data flow from generators to managers, and ultimately, the output of data to data analysts. As such, the project will develop novel tools for the management and communication of monitoring data, monitoring data collection protocols and monitoring data flow. In addition, these tools will be implemented on a sub-basin scale and offered to the co-manager community to facilitate all of the above objectives. (SDM). This WE specifically involves the following actions: maintain, enhance and document Status and Trend Effectiveness Monitoring (STEM) database; maintain, enhance and document STEM data query and delivery website. | D | | STEM website enhancements | 10/01/2011 | 06/30/2012 | Concluded | Chris Jordan | 05/04/2011 2:56 PM |
C | 160 | Create/Manage/Maintain Database | Develop pilot enterprise-level data management system | Due to the large-scale data collection effort undertaken by ISEMP, and the project's goal of data analysis and interpretation, the project must develop its own approach to data management that takes into explicit account the versioning of protocols, the spatial/temporal representativeness of the data elements, the data flow from generators to managers, and ultimately, the output of data to data analysts. As such, the project will develop novel tools for the management and communication of monitoring data, monitoring data collection protocols and monitoring data flow. In addition, these tools will be implemented on a sub-basin scale and offered to the co-manager community to facilitate all of the above objectives. (SDM). This WE specifically involves the following actions: maintain, enhance and document Status and Trend Effectiveness Monitoring (STEM) database; maintain, enhance and document STEM data query and delivery website. | E | | Provide web services to deliver ISEMP data | 07/01/2011 | 06/30/2012 | Concluded | Chris Jordan | 05/04/2011 2:56 PM |
C | 160 | Create/Manage/Maintain Database | Develop pilot enterprise-level data management system | Due to the large-scale data collection effort undertaken by ISEMP, and the project's goal of data analysis and interpretation, the project must develop its own approach to data management that takes into explicit account the versioning of protocols, the spatial/temporal representativeness of the data elements, the data flow from generators to managers, and ultimately, the output of data to data analysts. As such, the project will develop novel tools for the management and communication of monitoring data, monitoring data collection protocols and monitoring data flow. In addition, these tools will be implemented on a sub-basin scale and offered to the co-manager community to facilitate all of the above objectives. (SDM). This WE specifically involves the following actions: maintain, enhance and document Status and Trend Effectiveness Monitoring (STEM) database; maintain, enhance and document STEM data query and delivery website. | F | | Database documentation | 02/01/2012 | 06/30/2012 | Concluded | Chris Jordan | 05/04/2011 2:56 PM |
C | 160 | Create/Manage/Maintain Database | Develop pilot enterprise-level data management system | Due to the large-scale data collection effort undertaken by ISEMP, and the project's goal of data analysis and interpretation, the project must develop its own approach to data management that takes into explicit account the versioning of protocols, the spatial/temporal representativeness of the data elements, the data flow from generators to managers, and ultimately, the output of data to data analysts. As such, the project will develop novel tools for the management and communication of monitoring data, monitoring data collection protocols and monitoring data flow. In addition, these tools will be implemented on a sub-basin scale and offered to the co-manager community to facilitate all of the above objectives. (SDM). This WE specifically involves the following actions: maintain, enhance and document Status and Trend Effectiveness Monitoring (STEM) database; maintain, enhance and document STEM data query and delivery website. | G | | Website documentation | 02/01/2012 | 06/30/2012 | Concluded | Chris Jordan | 05/04/2011 2:56 PM |
C | 160 | Create/Manage/Maintain Database | Develop pilot enterprise-level data management system | Due to the large-scale data collection effort undertaken by ISEMP, and the project's goal of data analysis and interpretation, the project must develop its own approach to data management that takes into explicit account the versioning of protocols, the spatial/temporal representativeness of the data elements, the data flow from generators to managers, and ultimately, the output of data to data analysts. As such, the project will develop novel tools for the management and communication of monitoring data, monitoring data collection protocols and monitoring data flow. In addition, these tools will be implemented on a sub-basin scale and offered to the co-manager community to facilitate all of the above objectives. (SDM). This WE specifically involves the following actions: maintain, enhance and document Status and Trend Effectiveness Monitoring (STEM) database; maintain, enhance and document STEM data query and delivery website. | H | DELIV | Enterprise-level tools to manage project data | | 06/30/2012 | Concluded | Chris Jordan | 05/04/2011 2:56 PM |
| | | | | | | | | | | | |