A29Increase Aquatic and/or Floodplain ComplexityInstall Beaver Dam Support structuresFieldwork. Install beaver dam support (BDS) structures in Bridge Ck as specified by EC, annual work plan and ISEMP Bridge Ck. IMW experimental design. This WE is integrated with, but does not duplicate any work specified by, contract 50685 WE N (Eco Logical Research Inc). This WE will provide field technicians through existing NOAA contracting vehicles to assist with ISEMP restoration actions in Bridge Ck.AECEnvironmental compliance requirements complete07/01/201107/15/2011ConcludedChris Jordan05/05/2011 4:18 PM
A29Increase Aquatic and/or Floodplain ComplexityInstall Beaver Dam Support structuresFieldwork. Install beaver dam support (BDS) structures in Bridge Ck as specified by EC, annual work plan and ISEMP Bridge Ck. IMW experimental design. This WE is integrated with, but does not duplicate any work specified by, contract 50685 WE N (Eco Logical Research Inc). This WE will provide field technicians through existing NOAA contracting vehicles to assist with ISEMP restoration actions in Bridge Ck.BSuggestedSite Plan to include maps, structure types and locations.07/01/201109/01/2011ConcludedChris Jordan05/03/2011 11:00 AM
A29Increase Aquatic and/or Floodplain ComplexityInstall Beaver Dam Support structuresFieldwork. Install beaver dam support (BDS) structures in Bridge Ck as specified by EC, annual work plan and ISEMP Bridge Ck. IMW experimental design. This WE is integrated with, but does not duplicate any work specified by, contract 50685 WE N (Eco Logical Research Inc). This WE will provide field technicians through existing NOAA contracting vehicles to assist with ISEMP restoration actions in Bridge Ck.CSuggestedMaterials for structures purchased and staged at implementation sites07/01/201109/01/2011ConcludedChris Jordan05/03/2011 11:00 AM
A29Increase Aquatic and/or Floodplain ComplexityInstall Beaver Dam Support structuresFieldwork. Install beaver dam support (BDS) structures in Bridge Ck as specified by EC, annual work plan and ISEMP Bridge Ck. IMW experimental design. This WE is integrated with, but does not duplicate any work specified by, contract 50685 WE N (Eco Logical Research Inc). This WE will provide field technicians through existing NOAA contracting vehicles to assist with ISEMP restoration actions in Bridge Ck.DSuggestedCompletion of all structure implementation for the specific system08/01/201110/31/2011ConcludedChris Jordan05/03/2011 11:00 AM
A29Increase Aquatic and/or Floodplain ComplexityInstall Beaver Dam Support structuresFieldwork. Install beaver dam support (BDS) structures in Bridge Ck as specified by EC, annual work plan and ISEMP Bridge Ck. IMW experimental design. This WE is integrated with, but does not duplicate any work specified by, contract 50685 WE N (Eco Logical Research Inc). This WE will provide field technicians through existing NOAA contracting vehicles to assist with ISEMP restoration actions in Bridge Ck.EDELIVIn-water work -- Beaver Dam Support 12/01/2011ConcludedChris Jordan05/03/2011 11:00 AM
B157Collect/Generate/Validate Field and Lab DataMonitor Beaver Dam Support structuresFieldwork. Monitoring the status and condition of beaver ponds and Beaver Dam Support (BDS) structures in Bridge and Murderers Ck.AECEnvironmental compliance requirements complete07/01/201107/15/2011ConcludedChris Jordan05/05/2011 4:19 PM
B157Collect/Generate/Validate Field and Lab DataMonitor Beaver Dam Support structuresFieldwork. Monitoring the status and condition of beaver ponds and Beaver Dam Support (BDS) structures in Bridge and Murderers Ck.B Seasonal beaver pond monitoring09/01/201105/01/2012ConcludedChris Jordan05/03/2011 11:06 AM
B157Collect/Generate/Validate Field and Lab DataMonitor Beaver Dam Support structuresFieldwork. Monitoring the status and condition of beaver ponds and Beaver Dam Support (BDS) structures in Bridge and Murderers Ck.C Seasonal BDS monitoring09/01/201106/01/2012ConcludedChris Jordan05/03/2011 11:06 AM
B157Collect/Generate/Validate Field and Lab DataMonitor Beaver Dam Support structuresFieldwork. Monitoring the status and condition of beaver ponds and Beaver Dam Support (BDS) structures in Bridge and Murderers Ck.DDELIVBeaver Pond and BDS monitoring data 06/30/2012ConcludedChris Jordan05/03/2011 11:06 AM
C160Create/Manage/Maintain DatabaseDevelop pilot enterprise-level data management systemDue to the large-scale data collection effort undertaken by ISEMP, and the project's goal of data analysis and interpretation, the project must develop its own approach to data management that takes into explicit account the versioning of protocols, the spatial/temporal representativeness of the data elements, the data flow from generators to managers, and ultimately, the output of data to data analysts. As such, the project will develop novel tools for the management and communication of monitoring data, monitoring data collection protocols and monitoring data flow. In addition, these tools will be implemented on a sub-basin scale and offered to the co-manager community to facilitate all of the above objectives. (SDM). This WE specifically involves the following actions: maintain, enhance and document Status and Trend Effectiveness Monitoring (STEM) database; maintain, enhance and document STEM data query and delivery website.A Load data into STEM database07/01/201106/30/2012ConcludedChris Jordan05/04/2011 2:56 PM
C160Create/Manage/Maintain DatabaseDevelop pilot enterprise-level data management systemDue to the large-scale data collection effort undertaken by ISEMP, and the project's goal of data analysis and interpretation, the project must develop its own approach to data management that takes into explicit account the versioning of protocols, the spatial/temporal representativeness of the data elements, the data flow from generators to managers, and ultimately, the output of data to data analysts. As such, the project will develop novel tools for the management and communication of monitoring data, monitoring data collection protocols and monitoring data flow. In addition, these tools will be implemented on a sub-basin scale and offered to the co-manager community to facilitate all of the above objectives. (SDM). This WE specifically involves the following actions: maintain, enhance and document Status and Trend Effectiveness Monitoring (STEM) database; maintain, enhance and document STEM data query and delivery website.B Maintain and update STEM database07/01/201106/30/2012ConcludedChris Jordan05/04/2011 2:56 PM
C160Create/Manage/Maintain DatabaseDevelop pilot enterprise-level data management systemDue to the large-scale data collection effort undertaken by ISEMP, and the project's goal of data analysis and interpretation, the project must develop its own approach to data management that takes into explicit account the versioning of protocols, the spatial/temporal representativeness of the data elements, the data flow from generators to managers, and ultimately, the output of data to data analysts. As such, the project will develop novel tools for the management and communication of monitoring data, monitoring data collection protocols and monitoring data flow. In addition, these tools will be implemented on a sub-basin scale and offered to the co-manager community to facilitate all of the above objectives. (SDM). This WE specifically involves the following actions: maintain, enhance and document Status and Trend Effectiveness Monitoring (STEM) database; maintain, enhance and document STEM data query and delivery website.C Data analysis and delivery support10/01/201106/30/2012ConcludedChris Jordan05/04/2011 2:56 PM
C160Create/Manage/Maintain DatabaseDevelop pilot enterprise-level data management systemDue to the large-scale data collection effort undertaken by ISEMP, and the project's goal of data analysis and interpretation, the project must develop its own approach to data management that takes into explicit account the versioning of protocols, the spatial/temporal representativeness of the data elements, the data flow from generators to managers, and ultimately, the output of data to data analysts. As such, the project will develop novel tools for the management and communication of monitoring data, monitoring data collection protocols and monitoring data flow. In addition, these tools will be implemented on a sub-basin scale and offered to the co-manager community to facilitate all of the above objectives. (SDM). This WE specifically involves the following actions: maintain, enhance and document Status and Trend Effectiveness Monitoring (STEM) database; maintain, enhance and document STEM data query and delivery website.D STEM website enhancements10/01/201106/30/2012ConcludedChris Jordan05/04/2011 2:56 PM
C160Create/Manage/Maintain DatabaseDevelop pilot enterprise-level data management systemDue to the large-scale data collection effort undertaken by ISEMP, and the project's goal of data analysis and interpretation, the project must develop its own approach to data management that takes into explicit account the versioning of protocols, the spatial/temporal representativeness of the data elements, the data flow from generators to managers, and ultimately, the output of data to data analysts. As such, the project will develop novel tools for the management and communication of monitoring data, monitoring data collection protocols and monitoring data flow. In addition, these tools will be implemented on a sub-basin scale and offered to the co-manager community to facilitate all of the above objectives. (SDM). This WE specifically involves the following actions: maintain, enhance and document Status and Trend Effectiveness Monitoring (STEM) database; maintain, enhance and document STEM data query and delivery website.E Provide web services to deliver ISEMP data07/01/201106/30/2012ConcludedChris Jordan05/04/2011 2:56 PM
C160Create/Manage/Maintain DatabaseDevelop pilot enterprise-level data management systemDue to the large-scale data collection effort undertaken by ISEMP, and the project's goal of data analysis and interpretation, the project must develop its own approach to data management that takes into explicit account the versioning of protocols, the spatial/temporal representativeness of the data elements, the data flow from generators to managers, and ultimately, the output of data to data analysts. As such, the project will develop novel tools for the management and communication of monitoring data, monitoring data collection protocols and monitoring data flow. In addition, these tools will be implemented on a sub-basin scale and offered to the co-manager community to facilitate all of the above objectives. (SDM). This WE specifically involves the following actions: maintain, enhance and document Status and Trend Effectiveness Monitoring (STEM) database; maintain, enhance and document STEM data query and delivery website.F Database documentation02/01/201206/30/2012ConcludedChris Jordan05/04/2011 2:56 PM
C160Create/Manage/Maintain DatabaseDevelop pilot enterprise-level data management systemDue to the large-scale data collection effort undertaken by ISEMP, and the project's goal of data analysis and interpretation, the project must develop its own approach to data management that takes into explicit account the versioning of protocols, the spatial/temporal representativeness of the data elements, the data flow from generators to managers, and ultimately, the output of data to data analysts. As such, the project will develop novel tools for the management and communication of monitoring data, monitoring data collection protocols and monitoring data flow. In addition, these tools will be implemented on a sub-basin scale and offered to the co-manager community to facilitate all of the above objectives. (SDM). This WE specifically involves the following actions: maintain, enhance and document Status and Trend Effectiveness Monitoring (STEM) database; maintain, enhance and document STEM data query and delivery website.G Website documentation02/01/201206/30/2012ConcludedChris Jordan05/04/2011 2:56 PM
C160Create/Manage/Maintain DatabaseDevelop pilot enterprise-level data management systemDue to the large-scale data collection effort undertaken by ISEMP, and the project's goal of data analysis and interpretation, the project must develop its own approach to data management that takes into explicit account the versioning of protocols, the spatial/temporal representativeness of the data elements, the data flow from generators to managers, and ultimately, the output of data to data analysts. As such, the project will develop novel tools for the management and communication of monitoring data, monitoring data collection protocols and monitoring data flow. In addition, these tools will be implemented on a sub-basin scale and offered to the co-manager community to facilitate all of the above objectives. (SDM). This WE specifically involves the following actions: maintain, enhance and document Status and Trend Effectiveness Monitoring (STEM) database; maintain, enhance and document STEM data query and delivery website.HDELIVEnterprise-level tools to manage project data 06/30/2012ConcludedChris Jordan05/04/2011 2:56 PM