Province | Subbasin | % |
---|---|---|
Columbia Plateau | Walla Walla | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Dawn Boorse | Bonneville Power Administration | No | Env. Compliance Lead | drboorse@bpa.gov | (503) 230-5678 |
Wendy Harris | Walla Walla Basin Watershed Council | Yes | Contract Manager | wendy.harris@wwbwc.org | (541) 938-2170 |
Brenda Heister | Bonneville Power Administration | Yes | Contracting Officer | bsheister@bpa.gov | (503) 230-3531 |
Peter Lofy | Bonneville Power Administration | Yes | F&W Approver | ptlofy@bpa.gov | (503) 230-4193 |
Chris Sheets | Walla Walla Basin Watershed Council | No | Administrative Contact | chris.sheets@wwbwc.org | (541) 938-2170 |
Brian Wolcott | Walla Walla Basin Watershed Council | Yes | Supervisor | brian.wolcott@wwbwc.org | (541) 938-2170 |
Tracey Yerxa | Bonneville Power Administration | Yes | COR | tyerxa@bpa.gov | (503) 230-4738 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Funding Package - Submit draft to COTR | B: 119. Admin oversight for Cap Activities | 07/01/2011 | 09/30/2011 | |
2-year Report submitted | C: 132. Submit 2-year report for September 2008 through August 2010 | 10/31/2012 | 10/31/2012 | |
Environmental Compliance complete | D: 165. Environmental Compliance Documentation for all cap actions | 01/31/2011 | 06/04/2011 | |
Trumbull Recharge Project Constructed | E: 98. Trumbull Recharge Site | 10/31/2012 | 10/31/2012 | |
Anspach Recharge Project Constructed | F: 98. Anspach Recharge Project | 10/31/2012 | 10/31/2012 | |
On farm pond constructed on Morris property | G: 151. Morris Bulge | 08/19/2011 | 11/07/2011 | |
Flow measuring device installed at Spence Ditch | H: 148. Spence Ditch Measurement Devices | 02/29/2012 | 03/24/2012 | |
Flow measuring device installed at Zell Ditch | I: 148. Zell Ditch Measurement Devices | 10/31/2012 | 10/31/2012 | |
Flow measuring device installed at Perkins Ditch | J: 148. Perkins Ditch Measurement Devices | 10/31/2012 | 10/31/2012 | |
West Little Walla Walla North Piped | K: 149. West Little Walla Walla Project - North Piping | 10/31/2012 | 10/31/2012 | |
West Little Walla Walla South Piped | L: 149. Cancelled: West Little Walla Walla Project - South Piping | 10/31/2012 | ||
West Little Walla Walla Diversions Installed | M: 84. West Little Walla Walla Project - Diversion Installations | 10/28/2011 | 10/13/2011 | |
Young Weir Installed | N: 84. Young Weir & Pond Project | 01/31/2012 | 12/30/2011 | |
Boyd Weir Replacement and Pond Enlargement | O: 84. Boyd Replace Weir and Enlarge Pond | 12/31/2011 | 12/30/2011 | |
Brooks Weir Installed | P: 84. Brooks Weir | 08/30/2011 | 04/30/2011 | |
Underwood Weir Installed | Q: 84. Underwood Weir | 08/30/2011 | 12/30/2011 | |
Negotiate In-stream Water Right Transactions | R: 154. In-stream Water Right Transactions | 10/31/2012 | 10/31/2012 | |
Designs for above projects complete | S: 175. Produce Designs for BPA Projects | 03/31/2012 | 03/31/2012 | |
Pre-Acquisition Activities Completed | T: 172. Pre-acquisition activities for purchase or easement of recharge site | 10/31/2012 | ||
Drain Fields for Recharge Expansion Installed | U: 98. Complete Hudson Bay Recharge Expansion | 08/31/2011 | 06/30/2011 | |
Recharge Design | V: 175. Recharge Design | 08/31/2012 | 08/31/2012 | |
Frog Designs | W: 175. Frog Design | 01/31/2012 | 01/31/2012 | |
Flow measuring device installed | X: 148. Little Walla Walla Measuring Devices | 10/31/2012 | 10/31/2012 | |
Funding Package - Submit draft to COTR | Y: 119. Year 2 Admin oversight for Cap Activities | 08/31/2012 | 08/31/2012 | |
Environmental Compliance complete | Z: 165. Environmental Compliance Documentation for all cap actions | 03/31/2012 | 03/31/2012 | |
7730 feet of pipeline installed during this phase | AA: 149. Hyline - Install Final phase of pipeline | 10/31/2012 | 10/31/2012 | |
Replaced, Automated and tested Frog Headgates | AB: 84. Frog Diversion Headgate and Automation | 10/31/2012 | 10/31/2012 | |
Zell Ditch Diversion | AC: 84. Zell Ditch Diversion | 10/31/2012 | 10/31/2012 | |
White Ditch Piping Project Designs | AD: 175. Produce Final Designs for White Ditch Piping | 10/31/2012 | 10/31/2012 | |
1-year Report submitted | AE: 132. Submit 1-year report for September 2010 through August 2011 | 10/31/2012 | 10/31/2012 | |
Stillman Ditch Piping | AF: 149. Stillman Ditch Piping | 10/31/2012 | 10/31/2012 | |
Finalized Smith Sill Engineered Drawings | AG: 175. Smith Fish Passage Barrier Modification Engineered Designs | 09/10/2012 | 09/10/2012 | |
Construction Management Complete | AH: 100. Project Oversight for Smith Sill on mainstem Walla Walla River | 10/31/2012 | 10/01/2012 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 09/01/2010 | ||||||
B | 119 | Admin oversight for Cap Activities | 09/01/2010 | ||||||
C | 132 | Submit 2-year report for September 2008 through August 2010 | 09/01/2010 | ||||||
D | 165 | Environmental Compliance Documentation for all cap actions | 09/01/2010 | ||||||
E | 98 | Trumbull Recharge Site | 04/21/2011 | ||||||
F | 98 | Anspach Recharge Project | 04/19/2011 | ||||||
G | 151 | Morris Bulge | 09/01/2010 | ||||||
H | 148 | Spence Ditch Measurement Devices | 09/01/2010 | ||||||
I | 148 | Zell Ditch Measurement Devices | 09/01/2010 | ||||||
J | 148 | Perkins Ditch Measurement Devices | 09/01/2010 | ||||||
K | 149 | West Little Walla Walla Project - North Piping | 04/19/2011 | ||||||
L | 149 | Cancelled: West Little Walla Walla Project - South Piping | 04/19/2011 | ||||||
M | 84 | West Little Walla Walla Project - Diversion Installations | 04/20/2011 | ||||||
N | 84 | Young Weir & Pond Project | 04/19/2011 | ||||||
O | 84 | Boyd Replace Weir and Enlarge Pond | 04/19/2011 | ||||||
P | 84 | Brooks Weir | 04/19/2011 | ||||||
Q | 84 | Underwood Weir | 04/19/2011 | ||||||
R | 154 | In-stream Water Right Transactions | 09/01/2010 | ||||||
S | 175 | Produce Designs for BPA Projects | 09/01/2010 | ||||||
T | 172 | Pre-acquisition activities for purchase or easement of recharge site | 09/01/2010 | ||||||
U | 98 | Complete Hudson Bay Recharge Expansion | 06/15/2011 | ||||||
V | 175 | Recharge Design | 09/01/2010 | ||||||
W | 175 | Frog Design | 09/01/2010 | ||||||
X | 148 | Little Walla Walla Measuring Devices | 09/01/2010 | ||||||
Y | 119 | Year 2 Admin oversight for Cap Activities | 09/01/2010 | ||||||
Z | 165 | Environmental Compliance Documentation for all cap actions | 09/01/2010 | ||||||
AA | 149 | Hyline - Install Final phase of pipeline | 09/01/2010 | ||||||
AB | 84 | Frog Diversion Headgate and Automation | 04/21/2011 | ||||||
AC | 84 | Zell Ditch Diversion | 09/24/2012 | ||||||
AD | 175 | Produce Final Designs for White Ditch Piping | 09/01/2010 | ||||||
AE | 132 | Submit 1-year report for September 2010 through August 2011 | 09/01/2010 | ||||||
AF | 149 | Stillman Ditch Piping | 08/01/2012 | ||||||
AG | 175 | Smith Fish Passage Barrier Modification Engineered Designs | 09/01/2010 | ||||||
AH | 100 | Project Oversight for Smith Sill on mainstem Walla Walla River | 09/01/2010 |