Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 52770: 1987-100-01 EXP UMATILLA ANAD FISH HAB - CTUIR
Project Number:
Title:
Umatilla Anadromous Fish Habitat-Umatilla Tribe
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Umatilla 100.00%
Contract Number:
52770
Contract Title:
1987-100-01 EXP UMATILLA ANAD FISH HAB - CTUIR
Contract Continuation:
Previous: Next:
46159: 1987-100-01 EXP UMATILLA ANAD FISH HAB - CTUIR
  • 57257: 1987-100-01 EXP UMATILLA ANAD FISH HAB - CTUIR
Contract Status:
Closed
Contract Description:
The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose ongoing fish habitat protection, restoration and enhancement, maintenance, and monitoring activities under the CTUIR Umatilla Anadromous Fish Habitat Project (198710001) to achieve the aquatic biological objectives and strategies and management plans established in the Umatilla Subbasin Plan (NPCC, 2004) and the Northwest Power and Conservation Council (NPCC) Fish and Wildlife Program (NPPC 2000).

The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore functional floodplain, channel, and watershed processes to provide sustainable and healthy habitat for aquatic species in the Umatilla River Basin, including Threatened Mid-Columbia summer steelhead.  Project work further supports the CTUIR Department of Natural Resource ecological (River Vision 2008) and First Foods mission statements to sustain production.

The following is an agreement between BPA and CTUIR to provide funds for implementing habitat enhancement actions in the Umatilla River Basin.
Account Type(s):
Expense
Contract Start Date:
02/01/2011
Contract End Date:
01/31/2012
Current Contract Value:
$3,486,221
Expenditures:
$3,486,221

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Upload SOW, budget, property inventory for upcoming contract period to Pisces. B: 119. Manage and Administer Project 11/01/2011 12/05/2011
Receipt of environmental compliance clearance from BPA C: 165. Produce Environmental Compliance Documentation 01/31/2012 01/31/2012
Attach 2009 Annual Progress Report in Pisces D: 132. Produce Annual Progress Report for the FY 2009 period (Feb 2009) to (Jan 2010) 01/31/2012
Attach 2010 Annual Progress Report in Pisces E: 132. Produce Annual Progress Report for the FY 2010 period (Feb 2010) to (Jan 2011) 11/30/2011
List of final projects F: 114. CTUIR Umatilla Subbasin Restoration Coordination 01/31/2012 01/31/2012
Provide technical input and summaries to enhance or protect natural resources in the subbasin. G: 122. Review and provide technical input on issues and topics that affect the areas natural resource 01/31/2012 01/31/2012
Coordinate watershed association activities H: 191. Umatilla River Watershed coordination duties 01/31/2012 01/31/2012
Complete outreach and education activities I: 99. Public Outreach and Education 01/31/2012 01/31/2012
Produce methods for monitoring project effectiveness J: 156. Incorporate developed strategic and scientifically accepted monitoring methods for application 01/31/2012 01/31/2012
Complete data collection and summarized findings K: 157. Monitoring and Evaluation CTUIR Umatilla Anadromous Fish Habitat Project 01/31/2012 01/31/2012
Maximize survival of planted trees and shrubs in enhancement project areas L: 22. Maintain trees and shrubs, and grass seeding in Umatilla River Basin habitat enhancement areas 01/31/2012 01/31/2012
Complete scheduled tree and shrub plantings in project areas M: 47. Supplement riparian areas of existing and new projects with additional vegetation 01/31/2012 01/31/2012
Treat 512 acres (109 riparian & 403 upland) in enhancement areas N: 53. Control of noxious weeds in project areas by physical and chemical means 01/31/2012 01/31/2012
Maintain proper operation of instream habitat structures O: 186. Inspect and maintain function of instream improvement structures 01/31/2012 01/31/2012
Maintenance of land or structures associated with conservation easements P: 186. Maintenance of habitat features associated with project conservation easements 01/31/2012 01/31/2012
Complete channel reconstruction and in-stream enhancement on 1.1 miles of stream Q: 29. Meacham Creek floodplain restoration and in-stream enhancement, river miles 6.0 to 7.0 11/30/2011 11/30/2011
Complete levee removal floodplain enhancements to Meacham Creek R: 180. Enhance floodplain connectivity and function via levee setback on Meacham Creek, river miles 6.0-7.0 01/31/2012 01/31/2012
3 miles of fence constructed on Meacham Creek S: 40. Install riparian fence enclosure in Meacham Creek, river miles 2.0-9.0 01/31/2012 12/30/2011
Oversight of fence construction in Isquulktpe Watershed T: 100. Construction oversight of boundary fence in Isquulktpe Watershed 11/30/2011 11/30/2011
Maintain 355 acres (61 riparian, 294 upland) in project area U: 22. Enhance native vegetation growth in the B&G Resources Property, Umatilla River (RM 41-44) 11/30/2011 09/30/2011
Project Design and Implementation Plan V: 175. Birch Creek Taylor Dam Removal and Habitat Restoration Project 01/31/2012 01/31/2012
Modify irrigation dam for fish passage W: 84. Tier 2 Work Element: Peterson Dam Modification Project on Birch Creek, river mile 2.5 10/31/2011
Initiate project coordination and identify priority status and implementation need. X: 175. Tier 2 Work Element: Westland/Ramos Habitat Restoration Project Plan 01/31/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 2 instances of WE 22 Maintain Vegetation
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 53 Remove Vegetation
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 2 instances of WE 22 Maintain Vegetation
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 53 Remove Vegetation
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 2 instances of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 122 Provide Technical Review and Recommendation

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/01/2011
B 119 Manage and Administer Project 02/01/2011
C 165 Produce Environmental Compliance Documentation 02/01/2011
D 132 Produce Annual Progress Report for the FY 2009 period (Feb 2009) to (Jan 2010) 02/01/2011
E 132 Produce Annual Progress Report for the FY 2010 period (Feb 2010) to (Jan 2011) 02/01/2011
F 114 CTUIR Umatilla Subbasin Restoration Coordination 02/01/2011
G 122 Review and provide technical input on issues and topics that affect the areas natural resource 02/01/2011
H 191 Umatilla River Watershed coordination duties 02/01/2011
I 99 Public Outreach and Education 02/01/2011
J 156 Incorporate developed strategic and scientifically accepted monitoring methods for application 02/01/2011
K 157 Monitoring and Evaluation CTUIR Umatilla Anadromous Fish Habitat Project 02/01/2011
L 22 Maintain trees and shrubs, and grass seeding in Umatilla River Basin habitat enhancement areas 02/01/2011
M 47 Supplement riparian areas of existing and new projects with additional vegetation 02/01/2011
N 53 Control of noxious weeds in project areas by physical and chemical means 02/01/2011
O 186 Inspect and maintain function of instream improvement structures 02/01/2011
P 186 Maintenance of habitat features associated with project conservation easements 02/01/2011
Q 29 Meacham Creek floodplain restoration and in-stream enhancement, river miles 6.0 to 7.0 02/01/2011
R 180 Enhance floodplain connectivity and function via levee setback on Meacham Creek, river miles 6.0-7.0 02/01/2011
S 40 Install riparian fence enclosure in Meacham Creek, river miles 2.0-9.0 02/01/2011
T 100 Construction oversight of boundary fence in Isquulktpe Watershed 02/01/2011
U 22 Enhance native vegetation growth in the B&G Resources Property, Umatilla River (RM 41-44) 02/01/2011
V 175 Birch Creek Taylor Dam Removal and Habitat Restoration Project 02/01/2011
W 84 Tier 2 Work Element: Peterson Dam Modification Project on Birch Creek, river mile 2.5 02/01/2011
X 175 Tier 2 Work Element: Westland/Ramos Habitat Restoration Project Plan 02/01/2011