Upload SOW, budget, property inventory for upcoming contract period to Pisces. |
B: 119. Manage and Administer Project |
|
11/01/2012 |
11/01/2012 |
Receipt of environmental compliance clearance on project work elements from BPA |
C: 165. Produce Environmental Compliance Documentation |
|
01/31/2013 |
01/31/2013 |
Attach 2011 Annual Progress Report in Pisces |
D: 132. Produce Annual Progress Report for the FY 2011 period (Feb 2011) to (Jan 2012) |
|
01/31/2013 |
01/31/2013 |
Attach Progress Report in Pisces |
E: 132. Submit combined 2009/2010 Progress Report- carry over from FY11 contract |
|
11/30/2012 |
11/30/2012 |
List of final projects |
F: 114. CTUIR Umatilla Subbasin Restoration Coordination |
|
01/31/2013 |
12/31/2012 |
Provide technical input and summaries to enhance or protect natural resources in the subbasin. |
G: 122. Review and provide technical input on issues and topics that affect the areas natural resource |
|
01/31/2013 |
01/31/2013 |
Coordinate watershed association activities |
H: 191. Umatilla River Watershed coordination duties |
|
01/31/2013 |
01/31/2013 |
Complete outreach and education activities |
I: 99. Public Outreach and Education |
|
01/31/2013 |
12/31/2012 |
Maximize survival of native vegetation in enhancement project areas |
J: 197. Maintain vegetation and control noxious weeds in project areas within the Umatilla River Basin |
|
01/31/2013 |
12/31/2012 |
Complete scheduled tree and shrub plantings in project areas |
K: 47. Supplement riparian areas of existing and new projects with additional vegetation |
|
01/31/2013 |
01/31/2013 |
Maintain proper operation of instream habitat structures |
L: 186. Inspect and maintain function of instream improvement structures |
|
01/31/2013 |
01/31/2013 |
Maintenance of land or structures associated with conservation easements |
M: 186. Maintenance of habitat features associated with project conservation easements |
|
01/31/2013 |
01/31/2013 |
Meacham Creek Restoration Design and Implementation Plan, River Miles 7.0-8.5 |
N: 175. Meacham Creek Restoration Reach Design, river miles 7.0 to 8.5 |
|
01/31/2013 |
01/31/2013 |
Maintain 355 acres (61 riparian, 294 upland) in project area |
O: 197. Enhance native vegetation growth in the B&G Resources Property, Umatilla River (RM 41-44) |
|
11/30/2012 |
11/30/2012 |
Construction technical oversight of the Birch Creek Taylor Dam Removal and Habitat Restoration Proj |
P: 100. Construction Oversight of the Birch Creek Taylor Dam Removal and Habitat Restoration Project |
|
01/31/2013 |
01/31/2013 |
Construction technical oversight of the West Birch Creek Low Dam Removal and Habitat Rest Project |
Q: 100. Construction Oversight of the West Birch Creek Low Barrier Removal and Habitat Restoration Project |
|
01/31/2013 |
01/31/2013 |
Produce methods for monitoring project effectiveness |
R: 156. Incorporate developed strategic and scientifically accepted monitoring methods for application |
|
01/31/2013 |
01/31/2013 |
Incorporate project effectiveness data into project activities and annual BPA reporting |
S: 115. Field Data Collection |
|
01/31/2013 |
01/31/2013 |
Data findings are incorporated annually into project activities. |
T: 159. Monitoring and Evaluation CTUIR Umatilla Anadromous Fish Habitat Project |
|
01/31/2013 |
01/31/2013 |
Samples analyzed and data uploaded to CTUIR water quality data base |
U: 157. Meacham Creek Water Quality ISCO Sampling and Analysis |
|
01/31/2013 |
01/31/2013 |
Written summary report describing the 2011 and 2012 findings compared to previous work. |
V: 157. Macroinvertebrate study for evaluating Meacham Creek restoration effectiveness |
|
01/31/2013 |
01/31/2013 |
Upload about 150 project effectiveness photo point photos to CTUIR data depository. |
W: 157. Project Effectiveness Photo Point Monitoring |
|
01/31/2013 |
01/31/2013 |
A summary report with data analysis and findings will be incorporated into the annual report. |
X: 157. Geomorphic-Hyporheic Flow Study on Meacham Creek |
|
01/31/2013 |
01/31/2013 |
USGS posted real-time accurate instantaneous stream flow data |
Y: 157. Meacham Flow/Hydrology Monitoring (USGS) |
|
01/31/2013 |
01/31/2013 |
Final report and summarized data uploaded in a data repository |
Z: 157. Meacham CHaMP Compatible Salmonid Habitat Surveys |
|
01/31/2013 |
01/31/2013 |
Attach Meacham Creek Floodplain Restoration and In-Stream Enhancement Phase 1 Completion Report |
AA: 141. Meacham Creek Floodplain Restoration and In-Stream Enhancement Phase 1 Completion Report |
|
11/15/2012 |
11/15/2012 |