Province | Subbasin | % |
---|---|---|
Columbia Cascade | Okanogan | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental Compliance Requirements | B: 165. Environmental Compliance Requirements | 09/15/2011 | 09/15/2011 | |
Funding Package - Submit draft to COTR | C: 119. Develop SOW, Budget for 2012 | 03/01/2012 | 03/16/2012 | |
Coordinate annual activities with landowners, local govts., irrigation district, WDFW and UCR | D: 191. Coordinate annual activities with landowners, local govts., OID, WDFW and UCRSRB | 06/29/2012 | 06/04/2012 | |
Coordination with National Marine Fisheries Service and Bureau of Reclamation | E: 161. Coordination with National Marine Fisheries Service and Bureau of Reclamation | 04/30/2012 | 04/30/2012 | |
Evaluation of fish passage conditions during controlled releases. | F: 157. Evaluate fish passage conditions during controlled releases. | 07/15/2012 | 06/04/2012 | |
Low flow channel evaluation and potential modification | G: 30. Low flow channel evaluation for potential modification | 06/29/2012 | 06/29/2012 | |
Increase bank stability along Salmon Creek | H: 29. Develop a design to stabilize bank, and provide construction oversight for bank stabilization | 03/15/2012 | 03/23/2012 | |
Attach Progress Report in Pisces | I: 132. Submit Progress(Annual) Report for the period (8/1/2010) to (7/31/2011) | 06/29/2012 | 03/23/2012 | |
Complete streambank stabilization project downstream of the Knutson's bridge crossing | J: 29. Install hardened rock toe downstream of landowner bridge to increase bank stability | 03/15/2012 | 03/23/2012 |
Primary Focal Species | Work Statement Elements |
---|---|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 08/01/2011 | ||||||
B | 165 | Environmental Compliance Requirements | 08/01/2011 | ||||||
C | 119 | Develop SOW, Budget for 2012 | 08/01/2011 | ||||||
D | 191 | Coordinate annual activities with landowners, local govts., OID, WDFW and UCRSRB | 08/01/2011 | ||||||
E | 161 | Coordination with National Marine Fisheries Service and Bureau of Reclamation | 08/01/2011 | ||||||
F | 157 | Evaluate fish passage conditions during controlled releases. | 08/01/2011 | ||||||
G | 30 | Low flow channel evaluation for potential modification | |||||||
H | 29 | Develop a design to stabilize bank, and provide construction oversight for bank stabilization | |||||||
I | 132 | Submit Progress(Annual) Report for the period (8/1/2010) to (7/31/2011) | 08/01/2011 | ||||||
J | 29 | Install hardened rock toe downstream of landowner bridge to increase bank stability | 02/27/2012 |