Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 48846: 199604200 EXP RESTORE SALMON CR ANAD FISH
Project Number:
Title:
Restore Salmon Creek Anadromous Fish
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Columbia Cascade Okanogan 100.00%
Contract Number:
48846
Contract Title:
199604200 EXP RESTORE SALMON CR ANAD FISH
Contract Continuation:
Previous: Next:
43648: 1996-042-00 EXP RESTORE SALMON CR ANAD FISH
  • 53459: 1996-042-00 EXP RESTORE SALMON CR ANADROMOUS FISH
Contract Status:
Closed
Contract Description:
Since 1910, water from Salmon Creek has been stored in Conconully Reservoir, which is delivered to orchards and fields within the Okanogan Irrigation District, via ~ 12 miles of Salmon Creek.  In addition, a dam was constructed on Salmon Lake, which augments storage of Conconully Reservoir.   Water from the North Fork of Salmon Creek is diverted into Salmon Lake via a feeder canal.  Both reservoirs are near the town of Conconully, about 17 miles northwest of Okanogan. Two pumping plants supplement the  water supply during water-short years.  Shell Rock Pump Station lifts water from the Okanogan River, and Duck Lake Pumping Plant withdraws water from Duck Lake.

Salmon Creek, a tributary to the Okanogan River, is considered to be one of the most significant opportunities to restore summer steelhead in the Okanogan Basin.  This project reconnects the Okanogan River with approximately 11 miles of habitat conducive for spawning and rearing of summer steelhead.  During controlled water releases in 2003, approximately 25 cfs was required for fish migration downstream of the diversion dam.  During 2008 a "low-flow" channel was constructed downstream of the diversion dam which provided suitable fish passage conditions at approximately 10 cfs.  The low flow channel extended the duration of water available through a 12-year water lease program.  

Evaluation of the migration conditions and the stability of the low-flow channel will be conducted over the next several years.  Minor modifications of the low-flow channel will be implemented concurrent with identification/evaluation.  Large-scale modifications will involve evaluation, design, permitting and heavy-machinery.  The large scale modifications will likely be implemented after the water release for that year.  Coordination and exchange of information with the irrigation district, landowners along Salmon Creek, local government, state fish and wildlife and other natural resource management entities will continue.
Account Type(s):
Expense
Contract Start Date:
08/01/2010
Contract End Date:
07/31/2011
Current Contract Value:
$196,997
Expenditures:
$196,997

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Colette Adolph Colville Confederated Tribes Yes Administrative Contact colette.adolph@colvilletribes.com (509) 422-5652
Chris Fisher Colville Confederated Tribes Yes Contract Manager chris.fisher@colvilletribes.com (509) 422-7427
Billy Gunn Colville Confederated Tribes Yes Administrative Contact billy.gunn@colvilletribes.com (509) 422-7740
Joy Juelson J&J Environmental No Interested Party jjuelson@gmail.com (509) 293-6719
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Terri Mail Colville Confederated Tribes Yes Administrative Contact terri.mail@colvilletribes.com (509) 634-2124
Cindy McCartney Colville Confederated Tribes No Administrative Contact cindy.mccartney@colvilletribes.com (509) 634-2112
Jennifer McKim Colville Confederated Tribes Yes Interested Party jennifer.mckim@colvilletribes.com (509) 422-7418
Michelle O'Malley Bonneville Power Administration Yes Env. Compliance Lead mmomalley@bpa.gov (503) 230-5138
Joe Peone Colville Confederated Tribes No Supervisor joe.peone@colvilletribes.com (509) 634-2113
Jenna Peterson Bonneville Power Administration No Interested Party jepeterson@bpa.gov (503) 230-3018
David Roberts Bonneville Power Administration Yes COR daroberts@bpa.gov (503) 230-4511
Norma Sanchez Colville Confederated Tribes Yes Administrative Contact norma.sanchez@colvilletribes.com (509) 634-2109
Tom Sargent Colville Confederated Tribes No Interested Party tom.sargent@colvilletribes.com (509) 634-2853
Kimberly Upham Bonneville Power Administration Yes Interested Party kaupham@bpa.gov (503) 230-3196
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance Requirements A: 165. Environmental Compliance Requirements 08/31/2010 09/26/2010
Funding Package - Submit draft to COTR B: 119. Develop SOW, Budget for 2011 04/01/2011 04/01/2011
Coordinate annual activities with landowners, local govts., irrigation district, WDFW and UCR C: 191. Coordinate annual activities with landowners, local govts., OID, WDFW and UCRSRB 07/31/2011 05/16/2011
Coordination with National Marine Fisheries Service and Bureau of Reclamation D: 189. Coordination with National Marine Fisheries Service and Bureau of Reclamation 03/31/2011 06/07/2011
Evaluation of fish passage conditions during controlled releases. E: 157. Evaluate fish passage conditions during controlled releases. 07/15/2011 06/30/2011
Low flow channel evaluation and potential modification F: 30. Low flow channel evaluation for potential modification 07/31/2011
Stable fish passage into Salmon Creek from the Okanogan River G: 30. Construct point bar and fish passage at confluence 10/15/2010 10/15/2010
Attach Progress Report in Pisces J: 132. Submit Progress(Annual) Report for the period (8/1/2009) to (7/31/2010) 06/30/2011 06/30/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 2 instances of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 35 Develop Pond
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance Requirements 08/01/2010
B 119 Develop SOW, Budget for 2011 08/01/2010
C 191 Coordinate annual activities with landowners, local govts., OID, WDFW and UCRSRB 08/01/2010
D 189 Coordination with National Marine Fisheries Service and Bureau of Reclamation 08/01/2010
E 157 Evaluate fish passage conditions during controlled releases. 08/01/2010
F 30 Low flow channel evaluation for potential modification 08/01/2010
G 30 Construct point bar and fish passage at confluence 09/28/2010
H 35 Survey, evaluate, design and modify pond for acclimation 08/01/2010
I 185 Periodic Status Reports for BPA 08/01/2010
J 132 Submit Progress(Annual) Report for the period (8/1/2009) to (7/31/2010) 08/01/2010