Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 54312: 1992-061-05 EXP ALBENI FALLS WL KOOTENAI
Project Number:
Title:
Albeni Falls Wildlife Mitigation-Kootenai Tribe
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
54312
Contract Title:
1992-061-05 EXP ALBENI FALLS WL KOOTENAI
Contract Continuation:
Previous: Next:
49074: 1992-061-05 EXP ALBENI FALLS WL KOOTENAI
  • 58323: 1992-061-05 EXP ALBENI FALLS WL KOOTENAI
Contract Status:
Closed
Contract Description:
Performance/Budget Period: 06/01/11 - 05/31/12
Contract Description:
Natural resources, including flora and fauna have shaped the culture of the Kootenai Tribe of Idaho (Tribe) for thousands of years. The aboriginal territories of the Kootenai Tribe of Idaho people were far reaching with traditional hunting, fishing, and gathering activities extending into British Columbia, Western Montana, and all of Northern Idaho; many of the areas and resources traditionally used by the Tribe have been lost, anadromous salmonids no longer journey up the Upper Columbia River and its tributaries, and wapato no longer blooms on the drained wet meadows. Even today, the Kootenai white sturgeon and burbot struggle to maintain historic spawning grounds. It is the goal of the Tribe to promote full mitigation of the impacts suffered by the people of the Kootenai Tribe of Idaho and the fish, water, wildlife, and plant resources upon which they depended, as a direct and indirect result of the development and operation of the Federal Columbia River Power System (FCRPS).

Coordination and cooperation between all agencies and Upper Columbia United Tribes (UCUT), including the Kootenai Tribe of Idaho, will ensure Albeni Falls wildlife mitigation activities are consistent with the Northwest Power and Conservation Council's (NWPCC) Columbia Basin Fish and Wildlife Program and the Columbia Basin Fish and Wildlife Authority (CBFWA). The purpose of this work statement is to provide funds to the Tribe to participate in the Albeni Falls Interagency Work Group (Work Group) and implementation of Albeni Falls Wildlife Mitigation Project - 9206100 (Project). The Kootenai Tribe of Idaho project work statement and process follows the newly adopted program (NWPPC 2000) and the 1995 Fish and Wildlife Program by focusing its efforts on the mitigation of fish and wildlife losses attributable to the development, operation and management of the Columbia River Basin hydroelectric facilities. This project will also complement, support, and integrate ongoing and future fisheries, wildlife and ecological studies in the Kootenai River Basin.

Wildlife management plans are being developed for the Nimz Ranch (~700ac) and will be incorporated into the larger Tribal Conservation Area Plan along with the Trout Creek Peninsula (112 acres) in the Kootenai River valley and Perkins Lake (98 acres) in the Moyie River basin. The Kootenai Tribe of Idaho has met with community groups, agencies, governments and local individuals, including but not limited to local farmers, sportsman groups and county officials, in order to address public concerns regarding wetland/riparian mitigation and conservation activities. This community-oriented approach (membership in Kootenai Valley Resource initiative [KVRI], and development of the “Kootenai River Valley Wetland and Riparian Conservation Strategy”) has protracted the short-term mitigation activities of the Tribal mitigation program, but at this measured pace the Tribal mitigation program hopes to accomplish a more stable, long-lived wildlife mitigation strategy and ensure the success of local wildlife management activities in the future. The Kootenai Tribe of Idaho is reviewing mitigation opportunities that combine local values, issues, and address potential concerns regarding land purchases in the Kootenai aboriginal territories.

The Tribe is implementing preliminary floral and fauna surveys, mapping and tracking weeds and cultural plants, and monitoring water elevations related to areas of potential cottonwood/willow recruitment. The Tribe has developed a Conservation Area Plan, where individual project management plans will be attached and incorporated this year.

Natural tree regeneration (cottonwood) on depositional areas along the Kootenai River (Trout Creek Peninsula) showed promise during early surveys, but high winter flows by Libby Dam flooded, scoured and drown a large percentage of all surveyed natural regeneration. Surveys of water timing/duration/depth, and other factors influencing natural recruitment have been documented. The Tribe will utilize observational data and related river data (#20020800) to show the related impacts of winter high flows due to power peaking operation from Libby Dam (associated work in #2002-011-00) and develop management options to increase river bank pioneering species.

Long term funding of mitigation project operations and maintenance actions are based on ecological principles and activities that protect and/or maintain functional target habitats and associated habitat units (HU's) while ensuring project viability and integrity. O&M also includes administrative functions and practices that support protection and operations and maintenance measures on project lands.

Monitoring and evaluation (M&E) is an integral component of long-term O&M. Monitoring target habitats (via HEP/vegetation surveys) and associated fish and wildlife species (via surveys on loss assessment species or surrogates) is necessary to ensure that post enhancement habitat activities fulfill the long-term maintenance of habitats and species being mitigated.

The project goal is to continue ongoing implementation of the Albeni Falls Wildlife Mitigation Project. This contract has been developed to cover personnel and operating costs for a 12-month contract period with the following objectives:

• Identify potential mitigation actions by identifying willing landowner participants and cost-sharing partnerships, building relationships with entities interested in wildlife mitigation, and meeting with City, County, and local stakeholders.
• Secure conservation easements, fee-title, and lease agreements by pursuing site information and title research, writing easement terms and conditions with landowners, verifying maps, fence boundaries, and legal descriptions, coordinating completion of property appraisal and review, and developing option/purchase agreements.
• Fulfill NEPA and BPA funding requirements by coordinating completion of cultural resource surveys, hazardous waste surveys and providing information for NEPA assessment.
• When possible provide cost-share funding for projects by determining cost-share and funding entity’s role in the proposed project.
• Coordinate ongoing efforts with inter-tribal departments and outside entities where coordination will likely include the identification of habitat sites suitable for partnership funding and providing technical assistance.
• Coordinate completion of biological baseline surveys of specific habitat areas to determine starting point for monitoring and evaluation of biological objectives.
• Incorporate management plans into wider conservation area plan: fish and wildlife habitat, recreation and access, fire protection, noxious weeds, information and education, operation and maintenance, and monitoring and evaluation. The management plans will define the management program.
• Coordinate enhancement activities defined in the individual site plans. Activities may include, but are not limited to, fencing, controlled burns, planting native vegetation, property clean up, and cultivating cropland.
• Coordinate operations and maintenance activities on mitigation project lands. Activities may include maintenance of fences, property and habitat improvements, access, water structures, and information and education facilities, enforcement of easement terms, and noxious weed control.
• Provide assistance with monitoring and evaluation activities on mitigation lands. Activities may include training, continuing HEP analysis to determine changes in habitat quality, site-specific monitoring and/or sampling of terrestrial vegetation, public use, and habitat use.
• Coordinate mitigation implementation activities associated with the Albeni Falls Interagency Work Group (AFIWG), such as preparing for and, at times, facilitating work group meetings, coordinating open houses and public outreach efforts, assisting project proponents with the development of project proposals and coordinating annual funding proposals and budget projections.
• Coordinate and develop Albeni Falls Wildlife Mitigation Project presentations to the Wildlife Caucus. Such materials may include slides, overheads, budgets, spreadsheets, site-specific information, etc.
• Develop administrative work statement and budget and maintain site-specific operating budgets for individual mitigation parcels. Oversee and develop budget revisions as necessary.
• Coordinate with the Work Group the development of an annual report of Albeni Falls Wildlife Mitigation implementation activities.
Account Type(s):
Expense
Contract Start Date:
06/01/2011
Contract End Date:
05/31/2012
Current Contract Value:
$343,991
Expenditures:
$343,991

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Katey Grange Bonneville Power Administration Yes Env. Compliance Lead kcgrange@bpa.gov (503) 230-4047
Sue Ireland Kootenai Tribe Yes Supervisor ireland@kootenai.org (208) 267-3620
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Rosemary Mazaika Bonneville Power Administration No Interested Party rxmazaika@bpa.gov (503) 230-5869
Jenna Peterson Bonneville Power Administration No Interested Party jepeterson@bpa.gov (503) 230-3018
Edna Runyan Kootenai Tribe Yes Administrative Contact edna@kootenai.org (208) 267-3620
Scott Soults Kootenai Tribe Yes Contract Manager soults@kootenai.org (208) 267-3620
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Virgil Watts III Bonneville Power Administration Yes COR vlwatts@bpa.gov (503) 230-4625


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
2010 -2011 Kootenai Tribe Albeni Falls Report B: 132. Submit Annual Report 05/31/2012
Permitting and documentation complete C: 165. Complete Permit Applications and Provide Documentation for Compliance 05/31/2012 05/31/2012
Coordination of project activities complete D: 189. Coordinate Activities Related to C&I, O&M, RM&E With Interdepartmental and Outside Entities 05/31/2012 05/31/2012
Completed title search E: 172. Conduct pre-acquisition processes (appraisals, title reports, etc.) 05/31/2012 05/31/2012
Completed hazardous waste survey F: 172. Completion of hazardous waste assessment as part of the pre-acquisition process 05/31/2012 05/31/2012
Completed engineering survey of boundaries G: 172. Completion of engineering surveys of boundaries as part of the pre-acquisition process 05/31/2012 05/31/2012
Complete preliminary HU assessment H: 115. Assess Baseline Conditions for New Projects and Provide O&M Updates on Existing Projects 05/31/2012 05/31/2012
Management plans complete I: 174. Complete OM&E Mgmt Plans and incorporate updates 05/31/2012 05/31/2012
Project M&E analysis and evaluation complete J: 162. Interpret M&E Data and Measures to Evaluate Habitat Enhancements 05/31/2012 05/31/2012
Management of data and database complete K: 160. Manage and Maintain Integrated Database 05/31/2012 05/31/2012
FY12 contracting package, September Accrual estimates, contract oversight. L: 119. Oversight of Implementation, Construction, O&M, RM&E of Existing Projects 05/31/2012 05/31/2012
HEP surveys, data and report compliation M: 87. Assist in HEP surveys, data assessment and reporting 05/31/2012 05/31/2012
Wildlife Surveys Complete N: 157. Conduct Appropriate Wildlife Surveys on an Annual Basis 05/31/2012 05/31/2012
Report Nuisance Animal Activities - refer to WE132 O: 190. Control Nuisance Animals 05/31/2012 05/31/2012
Remove interior fencing,scrap fencing and farm related debris P: 27. Remove fencing and farm debris 05/31/2012 05/31/2012
Artificial nest structures completed and monitored Q: 36. Construct, erect and maintain artificial nests 05/31/2012 05/31/2012
Removal of undesirable plants completed R: 53. Hand Removal Of Undesirable Plant Species 05/31/2012 05/31/2012
Completed phased bioengineering on erosion areas S: 47. Passive Bioengineered Plan and Establish Erosion Planting 05/31/2012 05/31/2012
Trespass and Enforcement Activities Complete T: 26. Secure Properties and Provide Enforcement Management 05/31/2012 05/31/2012
Maintenance of native vegetation complete U: 22. Maintain Existing Native Vegetation 05/31/2012 05/31/2012
Fence Maintenance Complete V: 186. Maintain Fence on Properties 05/31/2012 05/31/2012
Maintain and repair facility structures W: 186. Maintain facility structures for site operations 05/31/2012 05/31/2012
Assess the potential to develop a burbot pond X: 35. Develop burbot rearing pond 05/31/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 22 Maintain Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 27 Remove Debris
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 35 Develop Pond
  • 1 instance of WE 36 Develop Terrestrial Habitat Features
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 53 Remove Vegetation
  • 1 instance of WE 87 Prepare HEP Report
  • 3 instances of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 06/01/2011
B 132 Submit Annual Report 06/01/2011
C 165 Complete Permit Applications and Provide Documentation for Compliance 06/01/2011
D 189 Coordinate Activities Related to C&I, O&M, RM&E With Interdepartmental and Outside Entities 06/01/2011
E 172 Conduct pre-acquisition processes (appraisals, title reports, etc.) 06/01/2011
F 172 Completion of hazardous waste assessment as part of the pre-acquisition process 06/01/2011
G 172 Completion of engineering surveys of boundaries as part of the pre-acquisition process 06/01/2011
H 115 Assess Baseline Conditions for New Projects and Provide O&M Updates on Existing Projects 07/29/2011
I 174 Complete OM&E Mgmt Plans and incorporate updates 06/01/2011
J 162 Interpret M&E Data and Measures to Evaluate Habitat Enhancements 06/01/2011
K 160 Manage and Maintain Integrated Database 06/01/2011
L 119 Oversight of Implementation, Construction, O&M, RM&E of Existing Projects 06/01/2011
M 87 Assist in HEP surveys, data assessment and reporting 06/01/2011
N 157 Conduct Appropriate Wildlife Surveys on an Annual Basis 07/21/2011
O 190 Control Nuisance Animals 07/21/2011
P 27 Remove fencing and farm debris 07/21/2011
Q 36 Construct, erect and maintain artificial nests 07/21/2011
R 53 Hand Removal Of Undesirable Plant Species 07/29/2011
S 47 Passive Bioengineered Plan and Establish Erosion Planting 08/02/2011
T 26 Secure Properties and Provide Enforcement Management 06/01/2011
U 22 Maintain Existing Native Vegetation 07/21/2011
V 186 Maintain Fence on Properties 07/21/2011
W 186 Maintain facility structures for site operations 07/29/2011
X 35 Develop burbot rearing pond 07/29/2011