Province | Subbasin | % |
---|---|---|
Columbia River Estuary | Columbia Estuary | 50.00% |
Elochoman | 5.00% | |
Grays | 5.00% | |
Lower Columbia | Columbia Lower | 30.00% |
Kalama | 5.00% | |
Sandy | 5.00% |
Previous: | Next: |
---|---|
n/a |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Hannah Dondy-Kaplan | Bonneville Power Administration | Yes | Env. Compliance Lead | hadondy-kaplan@bpa.gov | (503) 230-4071 |
Jason Karnezis | Bonneville Power Administration | Yes | COR | jpkarnezis@bpa.gov | (503) 230-3098 |
Glenn Lamb | Columbia Land Trust | No | Supervisor | glamb@columbialandtrust.org | |
Scott McEwen | Columbia Land Trust | Yes | Interested Party | smcewen@columbialandtrust.org | (360) 213-1210 |
David Roberts | Bonneville Power Administration | Yes | F&W Approver | daroberts@bpa.gov | (503) 230-4511 |
Ian Sinks | Columbia Land Trust | Yes | Contract Manager | isinks@columbialandtrust.org | (503) 799-9505 |
Kristi Van Leuven | Bonneville Power Administration | Yes | Contracting Officer | kjvleuven@bpa.gov | (503) 230-3605 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Funding Package - Submit draft to COTR | B: 119. Manage Kandoll Farms Design Contract | 12/31/2012 | 12/31/2012 | |
Produce conceptual designs and preliminary engineering for estuary restoration projects. | C: 175. Produce Conceptual Designs and Preliminary Engineering for Estuary Restoration Projects | 08/30/2012 | 09/28/2012 | |
EC Compliance | D: 165. EC Compliance | 12/31/2012 | 12/31/2012 | |
Remove Dike | F: 180. Kandoll Farm P2 Dike Removal | 09/30/2012 | ||
Tidal Channel Restoration | G: 30. Kandoll Farm P2 Channel Restoration | 09/30/2012 | ||
Non-Native Vegetation Control and Site Preparation | H: 197. Kandoll Farm Vegetation Control and Site Prepatation | 09/30/2012 | 09/30/2012 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened) |
|
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened) |
|
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened) |
|
Cutthroat Trout, Coastal (Oncorhynchus clarkii clarkii) - All Anadromous Populations |
|
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened) |
|
Sturgeon, Green (Acipenser medirostris) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 01/15/2011 | ||||||
B | 119 | Manage Kandoll Farms Design Contract | 01/15/2012 | ||||||
C | 175 | Produce Conceptual Designs and Preliminary Engineering for Estuary Restoration Projects | 01/15/2012 | ||||||
D | 165 | EC Compliance | 01/15/2012 | ||||||
E | 132 | Submit Progress Report for the period (Jan 2012) to (Dec 2012) | 01/15/2012 | ||||||
F | 180 | Kandoll Farm P2 Dike Removal | 08/09/2012 | ||||||
G | 30 | Kandoll Farm P2 Channel Restoration | 08/09/2012 | ||||||
H | 197 | Kandoll Farm Vegetation Control and Site Prepatation | 08/09/2012 |