Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56662 REL 15: 1996-035-01 EXP YAKIMA RESERVATION WATERSHED PROJECT (YRWP)
Project Number:
Title:
Yakama Reservation Watershed Project
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
56662 REL 15
Contract Title:
1996-035-01 EXP YAKIMA RESERVATION WATERSHED PROJECT (YRWP)
Contract Continuation:
Previous: Next:
57335: 1996-035-01 EXP YAKAMA RESERVATION WATERSHED PROJECT
  • 56662 REL 50: 1996-035-01 EXP YAKIMA RESERVATION WATERSHED PROJECT (YRWP)
Contract Status:
Closed
Contract Description:
The YRWP works to restore natural function to the Satus, Toppenish and Ahtanum Watersheds. Our restoration and monitoring efforts take a comprehensive approach to the restoration of habitat for fisheries resources including steelhead and bull trout.
Account Type(s):
Expense
Contract Start Date:
03/01/2013
Contract End Date:
02/28/2014
Current Contract Value:
$892,416
Expenditures:
$892,416

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Shannon Adams Yakama Confederated Tribes Yes Contract Manager adas@yakamafish-nsn.gov (509) 945-0754
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Kelly Clayton Yakama Confederated Tribes Yes Technical Contact clak@yakamafish-nsn.gov (509) 945-7195
Ryan DeKnikker Yakama Confederated Tribes Yes Technical Contact dekr@yakamafish-nsn.gov (509) 945-5389
Loverne George Yakama Confederated Tribes Yes Administrative Contact geol@yakamafish-nsn.gov (509) 865-5121x6364
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Tana Hoptowit Yakama Confederated Tribes Yes Interested Party hopt@yakamafish-nsn.gov (509) 865-5121x6318
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Michelle O'Malley Bonneville Power Administration Yes COR mmomalley@bpa.gov (503) 230-5138
Tim Resseguie Yakama Confederated Tribes Yes Technical Contact rest@yakamafish-nsn.gov (509) 945-7409
Brandon Rogers Yakama Confederated Tribes Yes Interested Party rogb@yakamafish-nsn.gov (509) 949-4109
Paul Ward Yakama Confederated Tribes No Supervisor warp@yakamafish-nsn.gov (509) 949-4129


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
FY14 SOW and LIB submitted B: 119. Manage Restoration Projects 02/28/2014 02/25/2014
List of Selected Projects (and contingency projects) to be implemented in 2014 C: 114. Select habitat improvement actions and identify possible projects for 2014 09/30/2013 09/30/2013
Project databases that are maintained and up to date. D: 160. Update Project Database 02/28/2014 02/25/2014
Disseminated data E: 161. Create informal summary reports and maps 02/28/2014 02/25/2014
5 outreach sessions completed F: 99. Conduct field and classroom education at local schools 02/28/2014 02/25/2014
Technical review and input provided to various policy and planning efforts G: 122. Input to various Tribal planning and policy efforts 02/28/2014 02/25/2014
Completed environmental documentation H: 165. Environmental Compliance 02/28/2014 02/25/2014
Attach Progress Report in Pisces I: 132. Submit Progress Report for the prior contract period (March 2012) to (Feb 2013) 01/31/2014 02/27/2014
Completed 2012 and 2013 RPA Report submitted in Taurus J: 98. Submit RPA reports for CY 12 and CY13 02/28/2014 02/27/2014
Outmigration estimate and other data from screw traps K: 157. Operate rotary screw traps 10/31/2013 10/31/2013
Complete three pass surveys in Satus and Ahtanum Creeks L: 157. Conduct spawner surveys 12/15/2013 12/15/2013
15 miles of completed snorkel surveys M: 157. Conduct snorkel surveys 10/15/2013 10/15/2013
Complete 1500 meters of surveys N: 157. Conduct habitat surveys 10/15/2013 10/15/2013
Water temperature record O: 157. Collect water temperature data 11/30/2013 11/30/2013
Weekly manual discharge measurements P: 157. Collect discharge measurements 02/28/2014 02/25/2014
Monitor water level in monitoring wells Q: 157. Collect data from monitoring wells 02/28/2014 02/25/2014
Wapato Irrigation Project diversions managed for minimum instream flow. R: 186. Manage Operation of Upper and Lower WIP canals on Ahtanum Creek 02/28/2014 02/25/2014
water diversion managed at Olney lateral to provide minimum streamflow S: 186. Assist with operation of Olney Lateral 02/28/2014 02/25/2014
Functioning fences, wells, stock tanks, and habitat improvements T: 186. Maintain livestock wells/stock tanks/livestock fences/improved springs 02/28/2014 02/25/2014
outmigration estimates and timing information U: 162. Analyze smolt outmigration data 08/31/2013 08/31/2013
Index of spawner abundance and spawning distribution V: 162. Analyze spawner survey data 07/31/2013 07/31/2013
Water temperature record and descriptive statistics W: 162. Analyze water temperature data 11/30/2013 11/15/2013
Habitat metrics and indicators X: 162. Analyze habitat survey data 12/31/2013 12/01/2013
Spatial Fish Density Y: 162. Analyze snorkel survey data 12/31/2013 11/01/2013
technical review recommendations provided Z: 122. Project engineering support 02/28/2014 09/30/2013
Simcoe Creek Bank Stabilization Construction AB: 29. CCR30322 CANCELED WE - Simcoe Creek Bank Stabilization Project (construction) 09/30/2013
Construction oversight AC: 100. CCR30322 CANCELED WE - Simcoe Creek Bank Stabilization Project (construction oversight) 09/30/2013
Technical Review Recommendations provided AE: 122. CCR30322 NEW WE - Project consultation on construction and engineering 02/28/2014
Toppenish Creek Reach Assessment and Restoration Strategy AF: 114. CCR30322 NEW WE -Toppenish Creek Reach Assessment and Restoration Strategy 02/28/2014
South Fork Ahtanum Forest Road Improvement AG: 38. CCR30322 NEW WE - South Fork Ahtanum Forest Road Improvement Project 10/31/2013
Upper Toppenish Creek Culvert Removal and Ford Installation AH: 85. CCR30322 NEW WE - Upper Toppenish Creek Culvert Removal and Ford Installation 10/31/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 3 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 38 Improve Road for Instream Habitat Benefits
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 98 Other
  • 2 instances of WE 114 Identify and Select Projects
  • 2 instances of WE 175 Produce Design
  • 7 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 4 instances of WE 162 Analyze/Interpret Data
  • 1 instance of WE 100 Construction Management

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 03/01/2013
B 119 Manage Restoration Projects 03/01/2013
C 114 Select habitat improvement actions and identify possible projects for 2014 03/01/2013
D 160 Update Project Database 03/01/2013
E 161 Create informal summary reports and maps 03/01/2013
F 99 Conduct field and classroom education at local schools 03/01/2013
G 122 Input to various Tribal planning and policy efforts 03/01/2013
H 165 Environmental Compliance 03/01/2013
I 132 Submit Progress Report for the prior contract period (March 2012) to (Feb 2013) 03/01/2013
J 98 Submit RPA reports for CY 12 and CY13 05/01/2013
K 157 Operate rotary screw traps 05/01/2013
L 157 Conduct spawner surveys 03/01/2013
M 157 Conduct snorkel surveys 03/01/2013
N 157 Conduct habitat surveys 03/01/2013
O 157 Collect water temperature data 03/01/2013
P 157 Collect discharge measurements 03/01/2013
Q 157 Collect data from monitoring wells 03/01/2013
R 186 Manage Operation of Upper and Lower WIP canals on Ahtanum Creek 05/01/2013
S 186 Assist with operation of Olney Lateral 05/01/2013
T 186 Maintain livestock wells/stock tanks/livestock fences/improved springs 05/01/2013
U 162 Analyze smolt outmigration data 03/01/2013
V 162 Analyze spawner survey data 03/01/2013
W 162 Analyze water temperature data 03/01/2013
X 162 Analyze habitat survey data 03/01/2013
Y 162 Analyze snorkel survey data 03/01/2013
Z 122 Project engineering support 03/01/2013
AA 175 Simcoe Creek Bank Stabilization Project (design extension) 03/01/2013
AB 29 CCR30322 CANCELED WE - Simcoe Creek Bank Stabilization Project (construction)
AC 100 CCR30322 CANCELED WE - Simcoe Creek Bank Stabilization Project (construction oversight) 03/01/2013
AD 175 Camas Patch Meadow Assessment & Project Identification Project (conceptual designs) 03/01/2013
AE 122 CCR30322 NEW WE - Project consultation on construction and engineering 03/01/2013
AF 114 CCR30322 NEW WE -Toppenish Creek Reach Assessment and Restoration Strategy 03/01/2013
AG 38 CCR30322 NEW WE - South Fork Ahtanum Forest Road Improvement Project 11/15/2013
AH 85 CCR30322 NEW WE - Upper Toppenish Creek Culvert Removal and Ford Installation 11/15/2013