All administrative tasks fulfilled with timely quality products |
B: 119. Perform project management and administrative duties |
|
12/31/2021 |
12/31/2021 |
USFS Environmental Compliance on Yakama Nation Fisheries Projects (BPA's EC covered in REL 215) |
D: 165. FY 21 USFS NEPA 2017-164 (BPA's EC covered in REL 215) |
|
12/31/2021 |
12/31/2021 |
Permit and Construction Level Restoration Plans for the Upper Twisp Project Area |
E: 175. Upper Twisp River and Tributaries Project Design (USFS Projects) 2016-162 |
|
12/31/2021 |
|
Finalized Restoration Plan for Twisp Horseshoe USFS Lands |
F: 175. Twisp Horseshoe Phase 2 (USFS) Restoration Engineering 2010-39 |
|
12/31/2021 |
|
Permit Level and Final Designs and Report for the Scaffold Camp Project Area |
G: 175. Scaffold Camp Design 2015-146 |
|
12/31/2021 |
|
Conceptual Designs and Report for the Newby Narrows Project Area |
H: 175. Newby Narrows Phase 2 Designs 2015-153 |
|
12/31/2021 |
12/31/2021 |
Finalize Restoration Plan for the Fawn Creek Project Area |
I: 175. Fawn Creek Project - Design 2015-147 |
|
12/31/2021 |
|
Conceptual Designs and Report for the Old Yeller Project Area of the Chewuch River |
J: 175. Chewuch Old Yeller (USFS) Concpetual Designs 2019-208 |
|
12/31/2021 |
12/31/2021 |
Confidential Water Rights Evaluation |
K: 154. Methow Basin EWD Instream Flow Project - Water Rights Assessment 2015-152 |
|
12/31/2021 |
|
Alternative Water Delivery Feasibility Assessment |
L: 175. Methow Basin EWD Instream Flow Project - Eng. Feasibility Assessment 2015-152 |
|
12/31/2021 |
|
Nason Creek N1 DOT Permit Level Designs |
N: 175. Nason Creek N1 DOT Design 2018-198 |
|
12/31/2021 |
|
Finalize Conceptual and Permitting Designs and Report for the Upper Nason Creek Project Area |
O: 175. Upper Nason Creek Design 2020-207 |
|
12/31/2021 |
12/31/2021 |
Chiwawa Fan Finalized Restoration Plan |
P: 175. Chiwawa Fan - Design 2016-165 |
|
12/31/2021 |
|
Permit Level Restoration Plan for the Chiwawa River Outlet Project Area |
Q: 175. Chiwawa Outlet Design 2019-205 |
|
12/31/2021 |
|
Lower Wenatchee Reach 3 Concept Level Restoration Plan and Permitting Plan Sets |
R: 175. Lower Wenatchee River Reach 3 Design 2017-186 |
|
12/31/2021 |
|
Permit and Construction Level Restoration Plans for the Silver Falls and Fox Creek Sites |
S: 175. Entiat Silver Falls and Fox Creek Restoration Design 2019-210 |
|
12/31/2021 |
12/31/2021 |
Conceptual Designs and Report for the Mad River (USFS) Project Area |
T: 175. Mad River (USFS) Conceptual Design 2017-172 |
|
12/31/2021 |
|
Construction Management Complete |
W: 100. Chewuch RM 4.6 Oversight 2017-176 |
|
12/31/2021 |
12/31/2021 |
Completed channel construction |
X: 30. Chewuch RM 4.6 Construction 2017-176 |
|
12/31/2021 |
12/31/2021 |
Construction Management Complete |
Y: 100. M2 Alder Creek Floodplain Design and Oversight (w/Golden Doe) 2017-191 |
|
12/31/2021 |
12/30/2021 |
Completed channel construction |
Z: 30. M2 Alder Creek Floodplain Construction 2017-191 |
|
12/31/2021 |
|
Completed Wood Structure Installations |
AA: 29. M2 Golden Doe Mainstem Wood Structures 2017-191 |
|
12/31/2021 |
12/30/2021 |
Construction Management Complete |
AC: 100. Skinney Creek Construction Oversight 2015-144 |
|
12/31/2021 |
12/31/2021 |
Completed channel construction |
AD: 30. Skinney Creek Construction (Channel Reconstruction) 2015-144 |
|
12/31/2021 |
12/31/2021 |
Completed Channel construction |
AE: 29. Skinney Creek Construction (Large Wood Restoration) 2015-144 |
|
12/31/2021 |
12/31/2021 |
Construction Management Complete |
AF: 100. Nason Confluence - Construction Management 2013-105 |
|
12/31/2021 |
12/31/2021 |
Completed channel construction |
AG: 30. Nason Confluence Construction 2013-105 |
|
12/31/2021 |
12/31/2021 |
Construction Management Complete |
AH: 100. Entiat Upper Stillwaters USFS Construction Management 2017-167 |
|
12/31/2021 |
12/31/2021 |
Completed channel construction |
AI: 30. Entiat Upper Stillwaters USFS Construction 2017-167 |
|
12/31/2021 |
08/06/2021 |