Effective implementation management and timely contract administration |
B: 119. Perform project management and administrative duties |
|
12/31/2024 |
|
USFS Environmental Compliance on Yakama Nation Fisheries Projects |
D: 165. FY24 USFS NEPA 2017-164 |
|
12/31/2024 |
|
Final Construction Plan for the Chewuch USFS Project Area |
E: 175. Chewuch USFS Designs Phase 3 & 4 - 2019-208 |
|
12/31/2024 |
|
Permit Level and Final Designs and Report for the Wolf Creek USFS Project Area |
F: 175. Wolf Creek USFS Design Phase 3 & 4 - 2021-213 |
|
12/01/2024 |
|
Confidential Water Rights Evaluation |
G: 154. Methow Basin EWD Instream Flow Project - Water Rights Assessment 2015-152 |
|
12/31/2024 |
|
Permit Level and Final Designs for the Methow Basin EWD Instream Flow Project |
H: 175. Methow Basin EWD Instream Flow Project - Eng. and Design Phase 3 & 4 - 2015-152 |
|
12/31/2024 |
|
Conceptual Designs and Report for the Early Winters USFS Project Area |
I: 175. Early Winters Creek USFS Conceptual Designs - 2014-117 |
|
12/31/2024 |
|
Conceptual Designs and Report for the Upper Methow Project Area |
J: 175. Upper Methow Conceptual Designs - 2023-218 |
|
12/31/2024 |
|
Conceptual Designs and Report for the W2 Foghorn Project Area |
K: 175. W2 Foghorn Reach Conceptual Designs - 2023-219 |
|
12/31/2024 |
|
Conceptual Designs and Report for the 1890s Outlet Project |
L: 175. 1890s Outlet Conceptual Design - 2011-65 |
|
12/31/2024 |
|
Conceptual Designs and Report for the Two Channels Area |
M: 175. Two Channels Conceptual Design - 2011-89 |
|
12/31/2024 |
|
Report drafted and submitted for review |
N: 115. Methow River Reach Assessment Updates (Big Valley & M2) - 2023-220 |
|
12/31/2024 |
|
Nason Creek N1 DOT Permit and Construction Level Designs |
O: 175. Nason Creek N1 DOT Design Phase 3 and 4 - 2018-198 |
|
12/31/2024 |
|
Draft Construction Plan for the Upper Nason Phase 3 Project |
P: 175. Upper Nason Creek Side Channel Redesign Phase 3 2020-207 |
|
12/31/2024 |
|
Final Construction Plan for the Lower Chiwawa Big Meadow Project |
Q: 175. Lower Chiwawa Big Meadow Phases 3 and 4 - 2021-214 |
|
12/31/2024 |
|
Final Construction Plan for the Lower Wenatchee Reach 3 Project Area |
R: 175. Lower Wenatchee River Reach 3 Design Phases 3 and 4 - 2017-186 |
|
12/31/2024 |
|
Nason Creek, Icicle Creek, Chiwaukum Creek, and White River reports drafted and submitted for review |
S: 115. Wenatchee Subbasin Reach Assessments (Nason Creek, Icicle, White River, Chiwaukum) - 2023-221 |
|
12/31/2024 |
|
Draft Construction Plan for the Mad River Outlet Project Area |
T: 175. Mad River Outlet Design Phase 3 - 2021-215 |
|
12/31/2024 |
|
Confidential Water Rights Evaluation |
U: 154. Entiat Basin MRO Instream Flow Project - Water Rights Consulting 2022-217 |
|
12/31/2024 |
|
Alternative Water Delivery Feasibility Assessment |
V: 175. Entiat Basin MRO Instream Flow Project - Eng. Feasibility Assessment 2022-217 |
|
12/31/2024 |
|
Conceptual Designs and Report for the Entiat Stillwaters USFS Project Area |
W: 175. Entiat Stillwaters Design Phase 2 - 2019-210 |
|
12/31/2024 |
|
Report drafted and submitted for review |
X: 115. Middle Entiat Reach Assessment Updates (Grey, Stormy, Preston Reaches) - 2023-222 |
|
12/31/2024 |
|
Construction Management Complete |
Y: 100. Newby Narrows Oversight 2015-153 |
|
12/31/2024 |
|
Side Channel Restoration and Large Wood Habitat added into 0.3 miles of the Twisp River. |
Z: 30. Newby Narrows Construction 2015-153 |
|
12/31/2024 |
|
Construction Management Complete |
AA: 100. Mad River USFS Oversight 2017-172 |
|
12/31/2024 |
|
Large wood habitat and side channel elements added into three miles of the Mad River |
AB: 29. Mad River USFS Construction 2017-172 |
|
12/31/2024 |
|
Construction Management Complete |
AC: 100. Upper Nason Creek Yr 2 Oversight 2020-207 |
|
12/31/2024 |
|
Large wood habitat elements added into 1 mile of Nason Creek |
AD: 29. Upper Nason Creek Yr 2 Construction 2020-207 |
|
12/31/2024 |
|
Construction Management Complete |
AE: 100. Chiwawa Outlet Oversight 2019-205 |
|
12/31/2024 |
|
Large wood habitat elements added into 0.5 miles of the Chiwawa River |
AF: 29. Chiwawa Outlet Construction 2019-205 |
|
12/31/2024 |
|
Construction Management Complete |
AG: 100. Lower Chiwawa USFS Oversight 2021-214 |
|
12/31/2024 |
|
Side Channel Restoration and Large Wood Habitat added into 0.7 miles of the Chiwawa River |
AH: 30. Lower Chiwawa USFS Construction 2021-214 |
|
12/31/2024 |
|