Maintain fish production and rearing facilities |
B: 61. O&M for maintenance of facilities |
|
01/31/2025 |
|
Transport eyed eggs from the Wentachee and Methow basins to lower Columbia River facilities for rearing to pre-smolt stage |
C: 66. Transport BY24 Coho eyed-eggs from incubation facilities to rearing facilities |
|
01/31/2025 |
|
Broodstock adults for the Methow and Wenatchee programs |
D: 66. Trap 2024 Coho broodstock at Dryden, Tumwater, Wells Dam (east and west ladders), Methow FH, Winthrop NFH, and Leavenworth NFH (backup site only) |
|
12/15/2024 |
|
Trinity Pilot Project and preparation for contracting/construction |
E: 115. Trinity Site Development for spring Chinook & coho |
|
06/01/2024 |
06/01/2024 |
Effective implementation management and timely contract administration |
F: 119. Manage and Administer 2024-2025 Project for Mid Columbia Coho Restoration & Upper Columbia Spring Chinook and Steelhead known as Upper Columbia Production Projects |
|
01/31/2025 |
|
Completed Annual Report |
G: 132. Finalize annual reporting of the CY24 period (2/1/24 through 1/31/25) |
|
01/15/2025 |
|
Produce accessible, error-checked datasets |
H: 157. Analyze genetic tissue samples for PBT analysis of parental groups |
|
01/31/2025 |
03/01/2024 |
Produce accessible, error-checked datasets |
I: 157. Collect/Generate Field and Lab Data to determine 2024 emergence timing, growth and distribution |
|
01/31/2025 |
|
Produce accessible, error-checked datasets |
J: 157. Extract CWT from 2024 brood coho snouts collected at spawning and on spawning ground surveys |
|
01/31/2025 |
|
Produce accessible, error-checked datasets |
K: 157. Collect biological data from 2024 coho brood at spawning |
|
01/31/2025 |
|
Produce accessible, error-checked datasets |
L: 157. Conduct spawning ground surveys for the 2024 return year in the Methow Basin |
|
01/31/2025 |
|
Produce accessible, error-checked datasets |
M: 157. Conduct spawning ground surveys for the 2024 return year in the Wenatchee Basin |
|
01/31/2025 |
|
PIT tag 10,000 summer steelhead |
N: 158. PIT tag up to 10,000 BY23 steelhead parr in the Methow Basin for 2025 releases |
|
11/30/2024 |
|
Methow and Wenatchee acclimated PIT tagged juveniles |
O: 158. Mark/Tag Animals - PIT-tag up to 80,000 BY23 coho pre-smolts |
|
01/31/2025 |
|
CWT & PBT marking of MCCRP |
P: 158. Mark/Tag Animals - Subcontract CWT and/or PBT of approximately 1,700,000 BY24 coho pre-smolts |
|
11/30/2024 |
|
Coho database management for MCCRP |
Q: 160. Enter data into and maintain local databases |
|
01/31/2025 |
|
Deliverable: An accessible, error-checked data set with metadata |
R: 162. Analyze and interpret M&E data from 2024 |
|
01/31/2025 |
|
Produce Environmental Compliance documents |
S: 165. Revise/Update Environmental Compliance Documentation for all applicable work on Coho Reintroduction and UCSCSA final site list compliance for acclimation |
|
01/31/2025 |
|
Produce an Annual Hatchery Operation Plan |
T: 174. Hatchery Operations and Facility Plans |
|
01/31/2025 |
|
Produce an Annual Hatchery Operations Plan. |
U: 174. Update Upper Columbia Spring Chinook & Steelhead Acclimation (UCSCSA) Plan as sites become identified as part of the implementation schedule |
|
01/31/2025 |
|
Spawn approximately 750 coho brood adults for 2026 program releases in the Methow Basin |
V: 176. Spawn 2024 brood coho at Winthrop NFH |
|
12/30/2024 |
|
Spawn Coho at Leavenworth National Hatchery |
W: 176. Spawn 2024 brood coho at Leavenworth NFH |
|
12/25/2024 |
|
Coho acclimation at Goat Wall Pond |
X: 176. Acclimate/Release Coho BY2022: Methow: Goat Wall Pond |
|
05/30/2024 |
05/29/2024 |
Coho acclimation at Twisp Weir Pond |
Y: 176. Acclimation/Release Coho BY2022: Methow: Twisp Weir |
|
05/01/2024 |
05/01/2024 |
Coho acclimation at Chewuch AP |
Z: 176. Acclimation/Release Coho BY2022: Methow: Chewuch Acclimation Facility |
|
05/05/2024 |
05/01/2024 |
Coho acclimation at Mid-Valley Pond |
AA: 176. Acclimation/Release Coho BY2022: Methow: Mid Valley Ponds |
|
06/01/2024 |
06/01/2024 |
Coho and steelhead Acclimation at Early Winters Ponds |
AB: 176. Acclimation/Release Coho and Winthrop NFH steelhead BY2022: Methow: Early Winters |
|
06/01/2024 |
05/01/2024 |
Coho acclimation at Lower Twisp Ponds |
AC: 176. Acclimation/Release Coho BY2022: Methow: Lower Twisp Ponds |
|
05/15/2024 |
05/15/2024 |
Coho acclimation at 8-Mile Pond |
AD: 176. Acclimation/Release Coho BY2022: Methow: Eightmile Ranch |
|
06/15/2024 |
06/15/2024 |
Coho Acclimation at Leavenworth National Hatchery |
AE: 176. Release Coho BY2022: Wenatchee: Leavenworth NFH |
|
04/25/2024 |
04/25/2024 |
Acclimate coho at Coulter Pond |
AF: 176. Acclimation/Release Coho BY2022: Wenatchee: Coulter pond |
|
06/30/2024 |
06/30/2024 |
Acclimate coho at Butcher Pond |
AG: 176. Acclimation/Release Coho BY2022: Wenatchee: Butcher pond |
|
06/30/2024 |
06/30/2024 |
Acclimate and release coho from Rohlfing Pond |
AH: 176. Acclimation/Release Coho BY2022: Wenatchee: Rohlfing's pond |
|
06/30/2024 |
06/30/2024 |
Acclimate and release coho from Beaver Pond |
AI: 176. Acclimation/Release Coho BY2022: Wenatchee: Beaver Creek Pond |
|
06/30/2024 |
06/30/2024 |
Acclimate and volitionally release coho at Powerline Pond |
AJ: 176. Acclimation/Release Coho BY2022: Wenatchee; Powerline Pond |
|
06/30/2024 |
06/30/2024 |
Coordinate with regional stakeholders |
AK: 191. Coordination of Plan with Regional Stakeholders |
|
01/31/2025 |
|
Produce an Annual Operations Plan |
AL: 174. Produce an Annual Operations Plan |
|
01/31/2025 |
|