Province | Subbasin | % |
---|---|---|
Columbia Plateau | Yakima | 100.00% |
Previous: | Next: |
---|---|
56662 REL 9: 2010-030-00 EXP YN PROVIDE VSP ESTIMATE FOR YAKIMA STEELHEAD MPG |
|
* Expenditures data includes accruals and are based on data through 31-Dec-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Attach Progress Report in Pisces | A: 132. Submit (past due) Progress Report for the period 10/15/2011 through 10/14/2012 | 04/30/2014 | 04/30/2014 | |
Submit BiOp RM&E Report in Taurus for Calendar Year 2013 | B: 141. Submit BiOp RM&E Report in Taurus for Calendar Year 2013 | 04/24/2014 | 04/24/2014 | |
PIT-tag and Radio-tag adult migrating steelhead at Prosser Dam Denil trap across entire run-timing | C: 158. Insert PIT-tags and radio tags into adult steelhead | 05/15/2014 | 05/15/2014 | |
Purchase additional telemetry equipment as needed and maintain existing fixed telemetry sites. | D: 70. Installation and/or maintenance of temporary fixed site radio telemetry receivers | 08/31/2014 | 08/31/2014 | |
PIT-tag juvenile steelhead in the Naches and its tributaries | E: 158. PIT-tag juvenile steelhead | 10/14/2014 | 10/14/2014 | |
Track tagged steelhead throughout Yakima Basin | F: 157. Conduct final year of radio telemetry study | 07/31/2014 | 07/31/2014 | |
Collect biological data for estimating productivity and diversity VSP metrics | G: 157. Collect biological data on migrating adult steelhead | 10/14/2014 | 10/14/2014 | |
Purchase materials and install Naches River PIT-Arrays | H: 70. Purchase Naches array materials, assist with installation | 10/14/2014 | 10/14/2014 | |
EC documents obtained for this contract | I: 165. Provide EC documentation to BPA | 01/01/2014 | 01/01/2014 | |
All administrative tasks fulfilled with timely quality products | J: 119. Manage and administer project | 10/10/2014 | 10/10/2014 | |
Generate and compare Yakima Steelhead populations estimates between independent methods | K: 162. Generate and compare Steelhead population estimates between independent methods | 10/14/2014 | 10/14/2014 |
Primary Focal Species | Work Statement Elements |
---|---|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 132 | Submit (past due) Progress Report for the period 10/15/2011 through 10/14/2012 | 10/15/2013 | ||||||
B | 141 | Submit BiOp RM&E Report in Taurus for Calendar Year 2013 | 10/15/2013 | ||||||
C | 158 | Insert PIT-tags and radio tags into adult steelhead | 01/27/2014 | ||||||
D | 70 | Installation and/or maintenance of temporary fixed site radio telemetry receivers | 10/15/2013 | ||||||
E | 158 | PIT-tag juvenile steelhead | 10/15/2013 | ||||||
F | 157 | Conduct final year of radio telemetry study | 10/15/2013 | ||||||
G | 157 | Collect biological data on migrating adult steelhead | 10/15/2013 | ||||||
H | 70 | Purchase Naches array materials, assist with installation | 07/15/2013 | ||||||
I | 165 | Provide EC documentation to BPA | 10/15/2013 | ||||||
J | 119 | Manage and administer project | 10/15/2013 | ||||||
K | 162 | Generate and compare Steelhead population estimates between independent methods | 10/15/2013 | ||||||
L | 185 | Periodic Status Reports for BPA | 10/15/2013 |