Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56662 REL 77: 1996-035-01 EXP YAKAMA RESERVATION WATERSHED PROJECT
Project Number:
Title:
Yakama Reservation Watershed Project
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
56662 REL 77
Contract Title:
1996-035-01 EXP YAKAMA RESERVATION WATERSHED PROJECT
Contract Continuation:
Previous: Next:
56662 REL 50: 1996-035-01 EXP YAKIMA RESERVATION WATERSHED PROJECT (YRWP)
  • 56662 REL 99: 1996-035-01 EXP YAKAMA RESERVATION WATERSHED PROJECT
Contract Status:
Closed
Contract Description:
The YRWP works to restore natural function to the Satus, Toppenish and Ahtanum Watersheds. Our restoration and monitoring efforts take a comprehensive approach to the restoration of habitat for fisheries resources including steelhead and bull trout.
Account Type(s):
Expense
Contract Start Date:
03/01/2015
Contract End Date:
02/29/2016
Current Contract Value:
$1,085,439
Expenditures:
$1,085,439

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Shannon Adams Yakama Confederated Tribes Yes Contract Manager adas@yakamafish-nsn.gov (509) 945-0754
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Loverne George Yakama Confederated Tribes Yes Administrative Contact geol@yakamafish-nsn.gov (509) 865-5121x6364
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Josh Hall Yakama Confederated Tribes Yes Technical Contact hajo@yakamafish-nsn.gov (509) 945-0754
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Michelle O'Malley Bonneville Power Administration Yes COR mmomalley@bpa.gov (503) 230-5138
Tim Resseguie Yakama Confederated Tribes Yes Technical Contact rest@yakamafish-nsn.gov (509) 945-7409
Paul Ward Yakama Confederated Tribes No Supervisor warp@yakamafish-nsn.gov (509) 949-4129


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
SOW and LIB submitted B: 119. Manage Restoration Projects 09/30/2015 12/16/2015
List of Selected Projects (and contingency projects) to be implemented C: 114. Select habitat improvement actions and identify possible projects for next fiscal year 11/02/2015 09/30/2015
Project databases that are maintained and up to date. D: 160. Update Project Database 02/29/2016 02/29/2016
Disseminated data E: 161. Create informal summary reports and maps 02/29/2016 02/29/2016
5 outreach sessions completed F: 99. Conduct field and classroom education at local schools 02/29/2016 02/29/2016
Technical review and input provided to various policy and planning efforts G: 122. Input to various Tribal planning and policy efforts 02/29/2016 02/29/2016
Completed environmental documentation H: 165. Environmental Compliance 02/29/2016 02/29/2016
Completed Annual Report submitted to BPA I: 132. Produce Project Annual Report for FY15 02/29/2016 02/29/2016
Outmigration estimate and other data from screw traps J: 157. Operate rotary screw traps for steelhead 07/15/2015 06/30/2015
Complete three pass surveys in Satus and Ahtanum Creeks K: 157. Conduct steelhead and bull trout spawner surveys 08/31/2015 06/30/2015
PIT tag detections L: 157. Collect PIT tag detection data from antenna array on Ahtanum Creek 02/29/2016 02/29/2016
Redd distribution and adult abundance index M: 162. Analyze redd count data 06/30/2015 06/30/2015
Steelhead Outmigrant metrics N: 162. Analyze Steelhead Outmigrant Data 08/31/2015 08/31/2015
Water temperature record O: 157. Collect water temperature data 02/29/2016 02/29/2016
Weekly manual discharge measurements P: 157. Collect discharge measurements 02/29/2016 02/29/2016
Monitor water level in monitoring wells Q: 157. Collect data from monitoring wells 02/29/2016 02/29/2016
Wapato Irrigation Project diversions managed for minimum instream flow. R: 186. Assist with the operation of diversions and screens on Ahtanum Creek 02/29/2016 02/29/2016
water diversion managed at 6 diversions to provide minimum streamflow S: 186. Assist with operation of diversions and screens on Toppenish Creek 02/29/2016 02/29/2016
Functioning fences, wells, stock tanks, and habitat improvements T: 186. Maintain livestock wells/stock tanks/livestock fences/improved springs 02/29/2016 02/29/2016
Install Barb Wire and Buck & Pole Fence U: 40. Install Riparian/Meadow Barb Wire and Buck & Pole Fence At Camas Patch 02/29/2016 02/29/2016
Maintain vegetation V: 198. Maintain pre-existing vegetation 02/29/2016 02/29/2016
Starvation Flats Design W: 175. Starvation Flats Meadow Restoration 02/29/2016 02/29/2016
Toppenish Creek River Mile 37 Project Design X: 175. Toppenish Creek River Mile 37 Project 02/29/2016 02/29/2016
Lakebeds Meadow Culvert Removal Y: 85. Lakebeds Meadow Culvert Removal 09/30/2015 10/09/2015
Install Barb Wire and Buck & Pole Fence Z: 40. Install Riparian/ Meadow Barb Wire and Buck and Pole Fence at Toppenish Creek Meadow 09/30/2015 02/29/2016
Install Barb Wire and Buck & Pole Fence AA: 40. Install Riparian/ Meadow Barb Wire and Buck and pole Fence at Toppenish Creek RM 37 09/30/2015 02/29/2016
Install Barb Wire and Buck & Pole Fence AB: 40. Install Riparian/Meadow Barb Wire and buck and pole fence at Logy Creek 02/28/2016 02/29/2016
Lakebeds road removal and closure AC: 33. Lakebeds Road decommision and closure 11/30/2015 10/09/2015
Produce final engineer designs AD: 175. Ahtanum 62nd floodplain enhancment 02/29/2016 02/29/2016

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 3 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 33 Decommission Road/Relocate Road
  • 4 instances of WE 40 Install Fence
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 114 Identify and Select Projects
  • 3 instances of WE 175 Produce Design
  • 6 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 2 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 03/01/2015
B 119 Manage Restoration Projects 03/01/2015
C 114 Select habitat improvement actions and identify possible projects for next fiscal year 03/01/2015
D 160 Update Project Database 03/01/2015
E 161 Create informal summary reports and maps 03/01/2015
F 99 Conduct field and classroom education at local schools 03/01/2015
G 122 Input to various Tribal planning and policy efforts 03/01/2015
H 165 Environmental Compliance 03/01/2015
I 132 Produce Project Annual Report for FY15 03/01/2015
J 157 Operate rotary screw traps for steelhead 03/01/2015
K 157 Conduct steelhead and bull trout spawner surveys 03/01/2015
L 157 Collect PIT tag detection data from antenna array on Ahtanum Creek 03/01/2015
M 162 Analyze redd count data 03/01/2015
N 162 Analyze Steelhead Outmigrant Data 03/01/2015
O 157 Collect water temperature data 03/01/2015
P 157 Collect discharge measurements 03/19/2015
Q 157 Collect data from monitoring wells 03/19/2015
R 186 Assist with the operation of diversions and screens on Ahtanum Creek 03/19/2015
S 186 Assist with operation of diversions and screens on Toppenish Creek 03/19/2015
T 186 Maintain livestock wells/stock tanks/livestock fences/improved springs 03/01/2015
U 40 Install Riparian/Meadow Barb Wire and Buck & Pole Fence At Camas Patch 03/01/2015
V 198 Maintain pre-existing vegetation 03/01/2015
W 175 Starvation Flats Meadow Restoration 03/01/2015
X 175 Toppenish Creek River Mile 37 Project 03/01/2015
Y 85 Lakebeds Meadow Culvert Removal
Z 40 Install Riparian/ Meadow Barb Wire and Buck and Pole Fence at Toppenish Creek Meadow 03/01/2015
AA 40 Install Riparian/ Meadow Barb Wire and Buck and pole Fence at Toppenish Creek RM 37 03/19/2015
AB 40 Install Riparian/Meadow Barb Wire and buck and pole fence at Logy Creek 03/01/2015
AC 33 Lakebeds Road decommision and closure
AD 175 Ahtanum 62nd floodplain enhancment 03/01/2015