SOW and LIB submitted |
B: 119. Manage Restoration Projects |
|
09/30/2015 |
12/16/2015 |
List of Selected Projects (and contingency projects) to be implemented |
C: 114. Select habitat improvement actions and identify possible projects for next fiscal year |
|
11/02/2015 |
09/30/2015 |
Project databases that are maintained and up to date. |
D: 160. Update Project Database |
|
02/29/2016 |
02/29/2016 |
Disseminated data |
E: 161. Create informal summary reports and maps |
|
02/29/2016 |
02/29/2016 |
5 outreach sessions completed |
F: 99. Conduct field and classroom education at local schools |
|
02/29/2016 |
02/29/2016 |
Technical review and input provided to various policy and planning efforts |
G: 122. Input to various Tribal planning and policy efforts |
|
02/29/2016 |
02/29/2016 |
Completed environmental documentation |
H: 165. Environmental Compliance |
|
02/29/2016 |
02/29/2016 |
Completed Annual Report submitted to BPA |
I: 132. Produce Project Annual Report for FY15 |
|
02/29/2016 |
02/29/2016 |
Outmigration estimate and other data from screw traps |
J: 157. Operate rotary screw traps for steelhead |
|
07/15/2015 |
06/30/2015 |
Complete three pass surveys in Satus and Ahtanum Creeks |
K: 157. Conduct steelhead and bull trout spawner surveys |
|
08/31/2015 |
06/30/2015 |
PIT tag detections |
L: 157. Collect PIT tag detection data from antenna array on Ahtanum Creek |
|
02/29/2016 |
02/29/2016 |
Redd distribution and adult abundance index |
M: 162. Analyze redd count data |
|
06/30/2015 |
06/30/2015 |
Steelhead Outmigrant metrics |
N: 162. Analyze Steelhead Outmigrant Data |
|
08/31/2015 |
08/31/2015 |
Water temperature record |
O: 157. Collect water temperature data |
|
02/29/2016 |
02/29/2016 |
Weekly manual discharge measurements |
P: 157. Collect discharge measurements |
|
02/29/2016 |
02/29/2016 |
Monitor water level in monitoring wells |
Q: 157. Collect data from monitoring wells |
|
02/29/2016 |
02/29/2016 |
Wapato Irrigation Project diversions managed for minimum instream flow. |
R: 186. Assist with the operation of diversions and screens on Ahtanum Creek |
|
02/29/2016 |
02/29/2016 |
water diversion managed at 6 diversions to provide minimum streamflow |
S: 186. Assist with operation of diversions and screens on Toppenish Creek |
|
02/29/2016 |
02/29/2016 |
Functioning fences, wells, stock tanks, and habitat improvements |
T: 186. Maintain livestock wells/stock tanks/livestock fences/improved springs |
|
02/29/2016 |
02/29/2016 |
Install Barb Wire and Buck & Pole Fence |
U: 40. Install Riparian/Meadow Barb Wire and Buck & Pole Fence At Camas Patch |
|
02/29/2016 |
02/29/2016 |
Maintain vegetation |
V: 198. Maintain pre-existing vegetation |
|
02/29/2016 |
02/29/2016 |
Starvation Flats Design |
W: 175. Starvation Flats Meadow Restoration |
|
02/29/2016 |
02/29/2016 |
Toppenish Creek River Mile 37 Project Design |
X: 175. Toppenish Creek River Mile 37 Project |
|
02/29/2016 |
02/29/2016 |
Lakebeds Meadow Culvert Removal |
Y: 85. Lakebeds Meadow Culvert Removal |
|
09/30/2015 |
10/09/2015 |
Install Barb Wire and Buck & Pole Fence |
Z: 40. Install Riparian/ Meadow Barb Wire and Buck and Pole Fence at Toppenish Creek Meadow |
|
09/30/2015 |
02/29/2016 |
Install Barb Wire and Buck & Pole Fence |
AA: 40. Install Riparian/ Meadow Barb Wire and Buck and pole Fence at Toppenish Creek RM 37 |
|
09/30/2015 |
02/29/2016 |
Install Barb Wire and Buck & Pole Fence |
AB: 40. Install Riparian/Meadow Barb Wire and buck and pole fence at Logy Creek |
|
02/28/2016 |
02/29/2016 |
Lakebeds road removal and closure |
AC: 33. Lakebeds Road decommision and closure |
|
11/30/2015 |
10/09/2015 |
Produce final engineer designs |
AD: 175. Ahtanum 62nd floodplain enhancment |
|
02/29/2016 |
02/29/2016 |