Contract 58058: 2007-398-00 CAP MANASTASH FLOW ENHANCEMENT
Project Number:
Title:
Yakima Basinwide Tributary Passage and Flow
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
58058
Contract Title:
2007-398-00 CAP MANASTASH FLOW ENHANCEMENT
Contract Continuation:
Previous: Next:
45233: 2007-398-00 CAP MANASTASH FLOW ENHANCEMENT
Contract Status:
Closed
Contract Description:
This contract covers the capital portion of the Manastash Creek Instream Flow Enhancement Project, which is part of the larger Manastash Creek Restoration Project.  The expense portion is covered by contracted number 54238.

The overall Manastash Creek Restoration Project includes providing fish screens to protect fish from entrainment in irrigation systems, removing barriers to fish passage and improving instream flow. The Manastash Creek Instream Flow Enhancement Project's purpose is to accomplish the final goal, improving instream flow in lower Manastash Creek, by identifying and implementing projects. This project is guided by the Manastash Creek Restoration Project Instream Flow Enhancement Implementation Plan completed by the Manastash Steering Committee.   The KCCD will work with all water right owners to identify water conservation projects in water delivery systems and water application systems (on-farm), potential options to convert to groundwater, and to match water right owners with groups who purchase or lease water rights. This contract not only identifies projects and implements projects, it will also serve to identify and secure additional funding sources to complete projects.  The Manastash Steering Committee will play a key role in prioritizing projects for implementation.

This contract will also include remaining funds from the BPA fish screening and passage portion of the project.  The remaining screening and passage funds will be used on project tasks not yet completed and diversion modifications.  This includes, modifying the Barnes Road check structure, making facility improvements to Keach Jensen and Manastash Water Ditch Association, Abandoned Dam restoration and removal, installing and programming water metering telemetry for each diversion, removal and restoration of Reed, Hatfield, and Anderson, and coordinating installation of WDFW Pit Tag detectors at Barnes and MWDA diversion. The remaining funds and tasks will be competed by KCCD and HDR Engineering.  

2012 will be the final year of this contract; if FY2013 funds are approved for this project, it cannot be guaranteed that unspent contract funds remaining at the end of this contract will be approved for rescheduling to a new contract in 2013.
Account Type(s):
Capital
Contract Start Date:
09/01/2012
Contract End Date:
08/31/2013
Current Contract Value:
$339,000
Expenditures:
$339,000

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration No Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Anna Lael Kittitas County Conservation District Yes Supervisor anna.lael@kccd.net (509) 925-3352x7
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Jay Marcotte Bonneville Power Administration Yes COR jgmarcotte@bpa.gov (503) 230-3943
Sherry Swanson Kittitas County Conservation District Yes Contract Manager sherry-swanson@conservewa.net (509) 925-3352x6
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Documentation and assistance to support BPA's Environmental Compliance Group B: 165. Environmental Compliance Documentation 08/31/2013 08/31/2013
Project Engineering and Design C: 175. Engineering and Designs 08/31/2013 08/31/2013
MWDA Pipeline - MWDA diversion to Hanson Road D: 149. MWDA pipeline - MWDA Diversion to Hanson Road 08/31/2013
Dyk Sprinkler Conversion #2 E: 150. Dyk Sprinkler Conversion #2 04/30/2013 04/11/2013
Mellergaard Sprinkler Conversion F: 150. Mellergaard Sprinkler Conversion 12/31/2012 11/30/2012
Harrell Sprinkler Conversion #2 G: 150. Harrell Sprinkler Conversion #2 06/30/2013 06/15/2013
Harrell Sprinkler Conversion #3 H: 150. Harrell Sprinkler Conversion #3 08/31/2013
Acquire 2nd Class MWDA water in perpetuity. I: 164. Acquire Water Instream at Manastash Diversion via donations 10/31/2012 10/24/2012
Trust Reed Diversion water rights in perpetuity. J: 164. Acquire Water Instream at Reed Diversion via donation 08/31/2013 08/31/2013
Water Right Transactions K: 154. Develop Water Rights Transactions and Negotiate donations of water rights 08/31/2013 08/31/2013
Fulfill all administrative tasks with quality products and in a timely manner. L: 119. Manage Projects 08/31/2013 08/31/2013
Construction Management Complete M: 100. Remaining Fish Screen/Passage Projects 08/31/2013 08/31/2013
Attach Progress Report in Pisces N: 132. Submit Final Progress Report for the period Sept 2012 through Aug 2013 08/31/2013 08/31/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 149 Install Pipeline
  • 3 instances of WE 150 Install Sprinkler
  • 1 instance of WE 154 Develop and Negotiate Water Right Transaction
  • 2 instances of WE 164 Acquire Water Instream
  • 1 instance of WE 100 Construction Management
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 150 Install Sprinkler

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 09/01/2012
B 165 Environmental Compliance Documentation 09/01/2012
C 175 Engineering and Designs 09/01/2012
D 149 MWDA pipeline - MWDA Diversion to Hanson Road 12/03/2012
E 150 Dyk Sprinkler Conversion #2 10/02/2012
F 150 Mellergaard Sprinkler Conversion 09/01/2012
G 150 Harrell Sprinkler Conversion #2 10/09/2012
H 150 Harrell Sprinkler Conversion #3 08/26/2013
I 164 Acquire Water Instream at Manastash Diversion via donations 09/01/2012
J 164 Acquire Water Instream at Reed Diversion via donation 09/01/2012
K 154 Develop Water Rights Transactions and Negotiate donations of water rights 09/01/2012
L 119 Manage Projects 09/01/2012
M 100 Remaining Fish Screen/Passage Projects 09/01/2012
N 132 Submit Final Progress Report for the period Sept 2012 through Aug 2013 09/01/2012