Province | Subbasin | % |
---|---|---|
Columbia Plateau | Crab | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Attach Annual Progress Report in Pisces | B: 132. Submit Progress Report for the period Feb 2012 to Jan 2013 | 06/30/2013 | 07/31/2013 | |
Numbers and species of waterfowl pairs using TD2 waters in the spring. | C: 157. Spring waterfowl pair counts | 07/31/2013 | ||
Seed 20 acres of moist soil vegetation at TD-1 project site | D: 47. Moist soil seeding in TD-1 | 08/31/2013 | 09/02/2013 | |
TD-1 cells tilled | E: 181. Till cells at TD1 | 08/31/2013 | 08/30/2013 | |
Maintenance of desirable, control of undesirable/invasive vegetation at TD-1 | F: 197. Monitor and maintain desirable vegetation, control undesirable vegetation at TD-1 | 12/20/2013 | 10/17/2013 | |
Control of undesirable/invasive vegetation at TD-2 project site | G: 197. Control undesirable vegetation at TD-2 | 12/20/2013 | 10/17/2013 | |
Environmental Compliance | H: 165. Environmental compliance documentation | 01/31/2014 | 12/31/2013 | |
Armor dikes at the TD-1 site | I: 186. Inspect and repair water control structures and dikes at TD-1 site | 01/31/2014 | 12/31/2013 | |
Armor dikes at the TD-2 site | J: 186. Inspect and repair dikes at TD-2 site | 01/31/2014 | 12/31/2013 | |
Seed disturbed soil at TD-1 | K: 186. Seed disturbed soil at TD-1 site | 01/31/2014 | 12/31/2013 | |
Seed disturbed soil at TD-2 | L: 186. Seed disturbed soil at TD-2 site | 01/31/2014 | 12/31/2013 | |
Water in wetland cells at TD-1 | M: 186. Operate water control structures at TD-1 | 01/31/2014 | 12/13/2013 | |
Wildlife Area Administrative duties | N: 119. WDFW Administrative Requirements | 01/31/2014 | 12/31/2013 | |
Numbers and species of waterfowl using TD1 and TD2 waters through the fall and winter | O: 157. Fall and winter waterfowl counts | 01/31/2014 | 11/30/2013 | |
BPA required administrative duties completed | P: 119. BPA Administrative requirements | 01/31/2014 | 12/31/2013 |
Primary Focal Species | Work Statement Elements |
---|---|
Wildlife |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 02/01/2013 | ||||||
B | 132 | Submit Progress Report for the period Feb 2012 to Jan 2013 | 02/01/2013 | ||||||
C | 157 | Spring waterfowl pair counts | 02/01/2013 | ||||||
D | 47 | Moist soil seeding in TD-1 | 04/30/2013 | ||||||
E | 181 | Till cells at TD1 | 04/30/2013 | ||||||
F | 197 | Monitor and maintain desirable vegetation, control undesirable vegetation at TD-1 | 04/30/2013 | ||||||
G | 197 | Control undesirable vegetation at TD-2 | 04/30/2013 | ||||||
H | 165 | Environmental compliance documentation | 02/01/2013 | ||||||
I | 186 | Inspect and repair water control structures and dikes at TD-1 site | 04/30/2013 | ||||||
J | 186 | Inspect and repair dikes at TD-2 site | 04/30/2013 | ||||||
K | 186 | Seed disturbed soil at TD-1 site | 04/30/2013 | ||||||
L | 186 | Seed disturbed soil at TD-2 site | 04/30/2013 | ||||||
M | 186 | Operate water control structures at TD-1 | 02/01/2013 | ||||||
N | 119 | WDFW Administrative Requirements | 02/01/2013 | ||||||
O | 157 | Fall and winter waterfowl counts | 02/01/2013 | ||||||
P | 119 | BPA Administrative requirements | 02/01/2013 |