Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 60707: 2008-301-00 EXP HABITAT RESTORATION PLAN/DESIGN IMPLEMENT WSR
Project Number:
Title:
Habitat Restoration Planning/Design/Implementation within boundaries of Warm Springs Reservation, lower Deschutes River, Oregon
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Deschutes 100.00%
Contract Number:
60707
Contract Title:
2008-301-00 EXP HABITAT RESTORATION PLAN/DESIGN IMPLEMENT WSR
Contract Continuation:
Previous: Next:
56858: 2008-301-00 EXP HABITAT RESTORATION PLAN/DESIGN IMPLEMENT WSR
  • 64623: 2008-301-00 EXP HABITAT RESTORATION PLAN/DESIGN IMPLEMENT WSR
Contract Status:
Closed
Contract Description:
The Confederated Tribes of the Warm Springs Reservation of Oregon (CTWSRO) will develop and execute the Confederated Tribes of the Warm Springs Reservation of Oregon Habitat Restoration Program (CTWSHRP).  This program will focus on projects aimed at improving instream habitat along with holistic watershed restoration directed at factors limiting salmonid production.  Projects will occur mostly on the Warm Springs Indian Reservation.  

Projects will target four limiting factors including habitat complexity and quantity, fine sediment, water temperature and altered hydrology.  These projects will be tiered to the Deschutes River Subbasin Plan, and the Mid-Columbia Steelhead Recovery Plan.  All of the projects will focus on the Tribes goal of sustaining harvestable levels of fish for many generations.  The limiting factors were developed using guidance from the U.S. Fish and Wildlife Service (USFWS) and NOAA Fisheries matrix indicator methods for making Endangered Species Determinations and were linked with biological monitoring and production data collected by Tribal Fisheries staff on the Reservation.

Instream and watershed restoration projects are important in this portion of the Deschutes Basin for several reasons.  The 660,000 acre Warm Springs Indian Reservation provides critical habitat for wild populations of spring Chinook salmon, Mid-Columbia summer steelhead, bull trout, redband trout, Pacific lamprey, and a variety of other native non-salmonid species.  Protection and maintenance of these populations is important to Tribal culture and future harvest opportunities.  The new regulatory license agreement for the Pelton-Round Butte Hydroelectric Complex (~river mile 100) requires the co-owners to reintroduce salmon and steelhead into the upper Deschutes Basin.  The populations downstream of the hydro complex on the Reservation will provide the donor stock for rebuilding the populations upstream.      

The CTWSHRP will use funding from the recent Memorandum of Agreement between the Tribes and the Bonneville Power Administration (BPA) matched with funding from the National Resources Conservation Service (NRCS), the Pacific Coastal Salmon Recovery Fund, the Oregon Watershed Enhancement Board, the Pelton-Round Butte Fund, and other competitive sources.  Additionally, the program will have access to restoration funding received through the American Transport Inc. 1999 gasoline spill settlement fund.  It is anticipated that over the next ten years (2008-2018) these funds will exceed $6 million dollars.

Projects will be planned by Tribal staff from the Fish Habitat Program, designed by the NRCS or other technical assistance providers, and implemented by both Tribal and non-tribal contractors.  All projects will pass through the Tribe’s Integrated Resource Management Planning process and complete the required Endangered Species Act (ESA) consultation.
Account Type(s):
Expense
Contract Start Date:
03/01/2013
Contract End Date:
02/28/2014
Current Contract Value:
$283,759
Expenditures:
$283,759

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
NEPA Compliance Requirements Complete for Habitat Restoration Projects To Be Implemented A: 165. Obtain Environmental Compliance 02/28/2014 02/19/2014
Riparian Fence Monitoring Report B: 186. Maintain Riparian Fencing 02/28/2014 02/19/2014
Riparian Fence Monitoring Report C: 186. Maintain Water Developments 02/28/2014 02/19/2014
Riparian Fence Monitoring Report D: 186. Mill Creek Riparian Fence Construction 02/28/2014 02/19/2014
Habitat Planning Design and Implementation Annual Report E: 197. Vegetation Management 02/28/2014 02/19/2014
Quartz Creek Restoration Project Completion Report F: 30. Quartz Creek Restoration & Realignment 02/28/2014 11/15/2013
Timeline and Implementation Schedule for Mill Creek at Potter's Ponds G: 175. Mill Creek & Potter's Pond 02/28/2014 02/19/2014
2012 Effectiveness Monitoring H: 157. Collect Monitoring Data on Habitat Restoration & Protection Projects 02/28/2014 02/19/2014
Out Year Planning Summary I: 114. Identify & Select Projects for Future Implementation 02/28/2014 02/19/2014
Education & Outreach Summary J: 99. Communication with Tribal Public 02/28/2014 02/19/2014
Attach Progress Report in Pisces K: 132. Submit Progress Report for the Period (March 2012) to (Feb 2013) 01/31/2014 07/15/2013
Funding Package - Submit Package To COTR M: 119. Manage Project 10/31/2013 10/31/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Deschutes River Summer/Fall ESU
  • 3 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 197 Maintain/Remove Vegetation
  • 3 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 197 Maintain/Remove Vegetation
  • 3 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 197 Maintain/Remove Vegetation
  • 3 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Bull (S. confluentus) (Threatened)
  • 3 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 197 Maintain/Remove Vegetation
  • 3 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Environmental Compliance 03/01/2013
B 186 Maintain Riparian Fencing 03/01/2013
C 186 Maintain Water Developments 03/01/2013
D 186 Mill Creek Riparian Fence Construction 05/07/2013
E 197 Vegetation Management 01/06/2014
F 30 Quartz Creek Restoration & Realignment 01/06/2014
G 175 Mill Creek & Potter's Pond 03/01/2013
H 157 Collect Monitoring Data on Habitat Restoration & Protection Projects 01/06/2014
I 114 Identify & Select Projects for Future Implementation 03/01/2013
J 99 Communication with Tribal Public 03/01/2013
K 132 Submit Progress Report for the Period (March 2012) to (Feb 2013) 03/01/2013
L 185 Periodic Status Reports for BPA 03/01/2013
M 119 Manage Project 03/01/2013