Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 62378: 2011-018-00 EXP PEND OREILLE RIVER BASIN INITIATIVE
Project Number:
Title:
Pend Oreille River Basin Initiative: Land Acquisitions, Watershed Restoration, Conservation Hatchery
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
62378
Contract Title:
2011-018-00 EXP PEND OREILLE RIVER BASIN INITIATIVE
Contract Continuation:
Previous: Next:
58411: 2011-018-00 EXP PEND OREILLE RIVER BASIN INITIATIVE
  • 66035: 2011-018-00 EXP PEND OREILLE RIVER BASIN INITIATIVE
Contract Status:
Closed
Contract Description:
This project supports implementing larger-scale projects to improve local watershed health and ecosystem conditions and function within the Pend Oreille subbasin, consistent with the NPCC Sub-Basin Plan. The Kalispel Tribe has a history of matching & leveraging  funds from various sources (e.g. SRFB, DOE, DOT, BIA, USFS) to implement large scale watershed projects.  Land management and watershed restoration will be based upon the jointly-developed objectives and expected performance outcomes. There is an opportunity for cost share on culvert removal projects in the LeClerc Watershed. This is a cooperative project with the US Forest Service and Salmon Recovery Funding Board (SRFB).  A total of 3 culverts that are blockages to fish passage will be replaced.  Two of these culverts are on streams that are tributaries to East Branch LeClerc and the other culvert is on West Branch LeClerc. This project will also develop a CE-QUAL-W2 temperature model of the Priest River between Priest Lake and the Pend Oreille River to investigate the potential impact of cooler flows released from Priest Lake.

This project includes plans to design and implement a feasibility study for a westslope cutthroat and/or bull trout conservation aquaculture facility. The Tribe will obtain BPA concurrence about purpose and need, and project objectives to be served through conservation aquaculture – including agreement about appropriate cost-share (relative to the magnitude of the impacts attributable to the FCRPS and Albeni Falls Dam in particular) – before beginning the Northwest Power and Conservation Council’s Major Projects Review (3-STEP) process in about years 5 through 7.
  
• Target Habitats: Pend Oreille River and its tributaries both upstream and downstream of Albeni Falls Dam.

• Projected Benefits: Land acquisitions and conservations easements in core bull trout and westslope cutthroat watersheds.  Large scale tributary fish passage projects.  Improved ecosystem function through re-establishment of ecological conditions that foster abundance, diversity, and productivity of affected species.  A better understanding of westslope cutthroat and bull trout rebuilding needs and objectives; greater definition of the purposes to be served through conservation aquaculture; and the possible construction of a production facility commencing after the ten-year term of this agreement.  

• References: Intermountain Subbasin Plan (Pend Oreille Subbasin), Draft Bull Trout Recovery Plan (Chapter 23)
Account Type(s):
Expense
Contract Start Date:
08/01/2013
Contract End Date:
07/31/2014
Current Contract Value:
$141,673
Expenditures:
$141,673

* Expenditures data includes accruals and are based on data through 30-Sep-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Matthew Berger Kalispel Tribe Yes Technical Contact mberger@knrd.org (509) 447-7244
Jason Connor Kalispel Tribe Yes Interested Party jconnor@knrd.org (509) 447-7285
Ray Entz Kalispel Tribe Yes Supervisor rentz@knrd.org (509) 445-1147
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Joe Maroney Kalispel Tribe Yes Supervisor jmaroney@knrd.org (509) 447-7272
Jason Olson Kalispel Tribe No Contract Manager jolson@knrd.org (509) 447-7290
Jolene Seymour Kalispel Tribe Yes Administrative Contact jseymour@kalispeltribe.com (509) 445-1147
Jennifer Snyder Bonneville Power Administration Yes Env. Compliance Lead jasnyder@bpa.gov (503) 230-4187
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Virgil Watts III Bonneville Power Administration Yes COR vlwatts@bpa.gov (503) 230-4625


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Obtain Required Permits B: 165. Obtain Required Permits 07/21/2014 07/21/2014
Fulfill all administrative tasks with quality products and in a timely manner. C: 119. Manage and fulfill all administrative tasks 07/31/2014 07/31/2014
Replace East Branch LeClerc Creek culverts sites No. 1520386 and 1520387 D: 184. Replace East Branch LeClerc Creek culverts sites No. 1520386 and 1520387 07/31/2014
Replace West Branch LeClerc Creek Culvert site No. 1520372 E: 184. Replace West Branch LeClerc Creek Culvert site No. 1520372 07/31/2014
Attach Progress Report in Pisces F: 132. Submit Progress Report for the period Aug 1,2013 to July 31,2014 07/31/2014 07/31/2014
Temperature model of the Priest River G: 34. Temperature model of the Priest River 04/24/2014 04/01/2014
Project coordination among all stakeholders H: 189. Coordination with other entities on restoration efforts 07/31/2014 07/31/2014
Install fence around Indian Creek Ponds I: 40. Install fence around Indian Creek Ponds 06/27/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 34 Develop Alternative Water Source
  • 1 instance of WE 40 Install Fence
  • 2 instances of WE 184 Install Fish Passage Structure
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 34 Develop Alternative Water Source
  • 1 instance of WE 184 Install Fish Passage Structure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 08/01/2013
B 165 Obtain Required Permits 08/01/2013
C 119 Manage and fulfill all administrative tasks 08/01/2013
D 184 Replace East Branch LeClerc Creek culverts sites No. 1520386 and 1520387 05/05/2014
E 184 Replace West Branch LeClerc Creek Culvert site No. 1520372 05/05/2014
F 132 Submit Progress Report for the period Aug 1,2013 to July 31,2014 08/01/2013
G 34 Temperature model of the Priest River 08/01/2013
H 189 Coordination with other entities on restoration efforts 08/01/2013
I 40 Install fence around Indian Creek Ponds 09/08/2014