Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 67546: 1987-100-02 EXP UMATILLA ANAD FISH HABITAT - ODFW
Project Number:
Title:
Umatilla Anadromous Fish Habitat-Oregon Department of Fish and Wildlife (ODFW)
Stage:
Closed
Area:
Province Subbasin %
Columbia Plateau Umatilla 100.00%
Contract Number:
67546
Contract Title:
1987-100-02 EXP UMATILLA ANAD FISH HABITAT - ODFW
Contract Continuation:
Previous: Next:
63615: 1987-100-02 EXP UMATILLA ANAD FISH HABITAT - ODFW
  • 70410: 1987-100-02 EXP UMATILLA ANADROMOUS FISH HABITAT - ODFW
Contract Status:
Closed
Contract Description:
The Umatilla Anadromous Fish Habitat Program (UAFHP) is responsible for the protection, enhancement, and rehabilitation of stream ecosystems on private lands within the Umatilla River Subbasin.  Project activities are implemented under long-term agreements with landowners.  Past activities include the construction of grazing control fences and off-channel watering facilities, fish passage barrier remediation, channel rehabilitation, native plant enhancement on riparian areas and management of noxious weeds.

For FY 2015 the UAFHP does not have any implementation actions planned at this time.  However, the program has several other tasks scheduled for the year which will aid in identifying and selecting future implementation projects.  First, The UAFHP is participating in and providing technical review for the Birch Creek Geomorphic Assessment and Action Plan sponsored by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR).  This assessment will identify critical locations for future implementation actions within the Birch Creek drainage.  Second, The UAFHP is proposing to perform habitat condition surveys in the upper Meacham Creek drainage.  Hancock Forest Management has recently purchased large land holdings in upper Meacham Creek.  The UAFHP will develop a map identifying all private land holdings in upper Meacham Creek and contact property owners to gain access to said properties.  Habitat condition surveys will be performed, and critical areas for future restoration projects will be identified.  Surveys will also be performed on current projects to determine if any additional restoration action is needed.  Finally, the UAFHP has proposed to develop an Access database for the project in order to more efficiently track and organize large archived data.  The UAFHP will also plant 1000 native trees and shrubs on the Hoeft dam removal site and other locations as the discretion of the program biologist and senior technician.      

In addition to these new tasks for FY 2015, the UAFHP will also continue to coordinate and provide technical assistance to other agencies throughout the basin to complete fish habitat restoration projects.  The UAFHP also proposes the continued maintenance of 275.77 acres of riparian and stream habitat within the Umatilla River Sub-basin.  Specifically, 13 miles of fence, 17 off-channel watering facilities, and 130 acres of native vegetation will be maintained to meet program objectives.  Also, two surface flow monitoring systems and 10 temperature probes will be operated and maintained throughout the contract period to monitor the status and trends of water temperature, stream flows and fish habitat in the Birch and Meacham Creek watersheds.

For FY 2015, the UAFHP will also continue outreach and education by participating in outdoor school, continue to seek out landowners for future projects and renewing cooperative agreements, and will also actively investigate for trespass cattle on all riparian fencing projects.
Account Type(s):
Expense
Contract Start Date:
10/01/2014
Contract End Date:
09/30/2015
Current Contract Value:
$268,726
Expenditures:
$268,726

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Investigate current fencing projects for livestock trespass. A: 26. Investigate for trespass cattle within riparian fence 09/30/2015 09/30/2015
Plant riparian native tree species, seed, at Hoeft Dam removal site. B: 47. Plant Riparian Tree Species, seed disturbed areas 12/31/2014 12/12/2014
Watershed and Habitat Restoration Outreach and Education C: 99. Watershed and Habitat Restoration Outreach and Education 09/30/2015 09/30/2015
Identify and Select Projects in the Umatilla River Subbasin D: 114. Identify and Select Projects in the Umatilla River Subbasin 09/30/2015 09/30/2015
Produce habitat condition inventory for upper Meacham Creek drainage. E: 115. Produce Habitat condition inventory for Upper Meacham Creek drainage 09/30/2015
All administrative tasks fulfilled with timely quality products F: 119. Umatilla Anadromous Fish Habitat Program management 09/30/2015 09/30/2015
provide technical review for Birch Creek Geomorphic Assessment/other projects G: 122. technical review in partnership with CTUIR on Birch Creek Geomorphic Assessment/other projects 09/30/2015 09/30/2015
FY2014 (Oct 2013-Sept 2014) Annual Progress Report H: 132. Annual Progress Report for FY2014 activities (Oct 2013 - Sep 2014) 05/16/2015 05/16/2015
Operate and Maintain Flow Gauging Stations I: 157. Operate and Maintain Flow Gauging Stations 09/30/2015 09/30/2015
accessible, error-checked dataset of water temperatures at upper Meacham Creek. J: 157. Collect stream temperature data on two sites in the upper Meacham Creek headwaters 09/30/2015 09/30/2015
UAFH program database K: 160. Create comprehensive database for UAFH program 09/30/2015 09/30/2015
Environmental Compliance for FY 2015 L: 165. Environmental Compliance for 2014-2015 09/30/2015 09/30/2015
Maintain riparian fence/water developments in current CO-OP agreements N: 186. Maintain Riparian fence/water developments under current CO-OP agreements 09/30/2015 09/30/2015
Maintain Instream Structures O: 186. Maintain Instream Structures on 10 Birch Creek locations 09/30/2015 09/30/2015
Document stream restoration projects/change over time using photopoints P: 186. Document stream restoration projects/change over time using photopoints 09/30/2015 09/30/2015
Coordinate projects in the Umatilla basin with partner agencies Q: 191. Coordinate projects in the Umatilla basin with partner agenices/personnel 09/30/2015 09/30/2015
Maintain Riparian Vegetation along East, West and Main Stem Birch Creek R: 198. Maintain Riparian Vegetation along East, West and Main Stem Birch Creek 09/30/2015 09/30/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 115 Produce Inventory or Assessment
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 3 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 26 Investigate for trespass cattle within riparian fence 10/01/2014
B 47 Plant Riparian Tree Species, seed disturbed areas 10/01/2014
C 99 Watershed and Habitat Restoration Outreach and Education 10/01/2014
D 114 Identify and Select Projects in the Umatilla River Subbasin 10/01/2014
E 115 Produce Habitat condition inventory for Upper Meacham Creek drainage 10/01/2014
F 119 Umatilla Anadromous Fish Habitat Program management 10/01/2014
G 122 technical review in partnership with CTUIR on Birch Creek Geomorphic Assessment/other projects 10/01/2014
H 132 Annual Progress Report for FY2014 activities (Oct 2013 - Sep 2014) 10/01/2014
I 157 Operate and Maintain Flow Gauging Stations 10/01/2014
J 157 Collect stream temperature data on two sites in the upper Meacham Creek headwaters 10/01/2014
K 160 Create comprehensive database for UAFH program 10/01/2014
L 165 Environmental Compliance for 2014-2015 10/01/2014
M 185 Periodic Status Reports for BPA 10/01/2014
N 186 Maintain Riparian fence/water developments under current CO-OP agreements 10/01/2014
O 186 Maintain Instream Structures on 10 Birch Creek locations 10/01/2014
P 186 Document stream restoration projects/change over time using photopoints 10/01/2014
Q 191 Coordinate projects in the Umatilla basin with partner agenices/personnel 10/01/2014
R 198 Maintain Riparian Vegetation along East, West and Main Stem Birch Creek 10/01/2014