Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 67995: 1988-064-00 EXP KOOTENAI R WHITE STURGEON
Project Number:
Title:
Kootenai River Native Fish Conservation Aquaculture Program
Stage:
Implementation
Area:
Province Subbasin %
Mountain Columbia Kootenai 100.00%
Contract Number:
67995
Contract Title:
1988-064-00 EXP KOOTENAI R WHITE STURGEON
Contract Continuation:
Previous: Next:
63815: 1988-064-00 EXP KOOTENAI R WHITE STURGEON
  • 71451: 1988-064-00 EXP KOOTENAI RIVER WHITE STURGEON
Contract Status:
Closed
Contract Description:
Fish and wildlife resources in the Kootenai drainage were historically abundant and were used by the Kootenai Tribe for cultural and subsistence purposes.  Over the past decades, native fish and wildlife populations have declined significantly due to large-scale habitat and ecosystem changes.  The Kootenai River White Sturgeon Study and Conservation Aquaculture Project was initiated by the Kootenai Tribe of Idaho as a stopgap measure in 1989 to produce fish from wild Kootenai River adults until effective habitat restoration measures could be identified and implemented.  Aquaculture techniques were applied to the Kootenai River white sturgeon population in response to concerns that missing year classes, failed recruitment, and skewed age class structure were threatening this population with extinction. An independently produced conservation breeding plan to preserve the population' s remaining genetic variation was implemented in 1994 (Kincaid 1993). The population was listed as endangered under the Endangered Species Act (ESA 1973) in 1994 (USFWS 1994), due to unmitigated population decline and predominant recruitment failure on a decadal scale.  

A USFWS Recovery Plan for the population was completed during 1999 (USFWS 1999).  Subsequent concerns regarding duration, breadth, and magnitude of Kootenai River ecosystem degradation in Montana, Idaho, and British Columbia, and repeated failure to restore natural recruitment during the past decade suggested that a conservation hatchery program was warranted to preclude extinction. Without hatchery intervention, population extinction is certain during the next 20-40 years. With intervention, assuming ongoing natural recruitment failure, this hatchery program will contribute to demographic restoration and protection of remaining genetic variability during the next 30 to 50 years, while improvements in the Kootenai River ecosystem occur to collectively reestablish natural production and ecological function.

The Kootenai River White Sturgeon Conservation Aquaculture Program has expanded since the initial implementation of the Kincaid Plan in 1994.  Since then, the Program has: 1) produced, released, and monitored frequent year classes of captive-reared progeny from wild, native brood stock, 2) continued to preserve within-population genetic diversity, 3) minimized disease introduction and transmission, and 4) substantially contributed to the developing field of white sturgeon conservation aquaculture. The program is designed to preserve the locally adapted Kootenai River white sturgeon genotypes, phenotypes, and associated life history traits and restore age class structure to maximize future population viability and persistence.  The program incorporates an adaptive management approach and will be modified as necessary, following collection and analysis of the most recent and most complete empirical datasets.  These datasets will then be used in updated ecosystem, demographic, and genetic models to guide the Program and maximize it's effectiveness and success, in the broader context of Kootenai River ecosystem restoration.

Burbot Conservation Aquaculture Summary
Native burbot (Lota lota) in the Kootenai River in Idaho have been petitioned for ESA listing, are Red Listed in B. C., and are a designated species of special concern in Idaho and Montana. It is believed that at one time, the burbot fishery in Idaho produced many thousands of fish each winter. Tribal elders report that burbot (ling) were extremely abundant in the Kootenai River in Idaho and were a main staple for the Tribe in the late winter/early spring months.  The Kootenai Tribe relied heavily upon this important subsistence fishery and tribal members were very adept at using weirs and traps.  Burbot also provided a valuable social, sport, and commercial fishery but the fishery collapsed soon after the completion of Libby Dam. Burbot were once very important to the anglers of Kootenay Lake, as well. Creel data from the West Arm of Kootenay Lake revealed that during some years, the harvest of burbot exceeded 26,000 fish. Just as in Idaho, the Canadian fishery collapsed soon after Libby Dam began operations.

An investigation initiated in 1993 was implemented by IDFG to assess burbot abundance, distribution, size, reproductive success, and movement, and to identify factors limiting burbot in the Kootenai River in Idaho and British Columbia. A total of only 17 burbot were caught in 1993 (CPUE of one burbot/33 net days) and 8 in 1994 (CPUE of one burbot/111 net days).  Only one burbot was captured between Bonners Ferry and the Montana border, with no evidence of reproduction in Idaho. Unspawned females have been caught (post spawn) that were reabsorbing eggs, as have males (one month post spawn) that were in various stages of gonadal maturity. Burbot sampling during the winter of 1993 through 1994 at the mouths of Kootenai River tributaries in Idaho occurred with anticipation of intercepting a spawning run of fish from Kootenay Lake or the lower Kootenai/y River, but no burbot were caught. Cooperative sampling in the British Columbia river reach suggested that burbot were only slightly more abundant in the lower river. Telemetry studies have shown that the population is transboundary.  

Native burbot in the Idaho and Canadian portion of the Kootenai River drainage are at risk of becoming extinct.   Overexploitation of burbot in Kootenay Lake and Kootenai River was a concern for fish managers when it became evident the fishery was at risk of failing.  Measures were taken to reduce exploitation by reduction in creel limits and fishery closures but none of these measures restored the fishery.  Examples of stock rebound in overexploited burbot populations with fishery restrictions or closures have been documented, although habitat was generally intact in such cases. Operation of Libby Dam for hydropower (including power peaking) and flood control during the winter months has resulted in more erratic flows that are up to 3 fold higher than pre-dam conditions and warmer winter water temperatures. In addition, Lake Koocanusa, the impoundment created by Libby Dam, acts as a nutrient sink and has reduced productivity of the river.  Potential threats to the population include: current winter flow management, power peaking, changes in river temperature, loss of slough and side-channel habitat from diking, nutrient loss, and spring management of Kootenay Lake.

In 2002, KTOI convened a burbot recovery committee of local stakeholders and scientists from agencies in the Kootenai/y drainage to identify and implement conservation strategies to help alleviate threats to the species.  Conservation strategies identified in recovery plan for burbot include: ecosystem recovery, development of a winter flow plan, spring management of Kootenay Lake levels, use of donor stocks, captive broodstock and culture.   As with white sturgeon, conservation aquaculture will play a positive role in the recovery of this species, while efforts to restore habitat conditions necessary for the survival and natural production of burbot continue.  A Memorandum of Understanding signed by the participating management agencies and stakeholders defines the commitment of the participants to implement the conservation strategy to restore burbot in the Kootenai/y drainage. Through this project, culture techniques for native burbot have been developed and refined, in cooperation with the co-managers and U of I.

We are starting the first year of expanded production for sturgeon and first year of production for burbot with expanded facilities at Twin Rivers Hatchery while still implementing ongoing operations, maintenance and monitoring and evaluation including:
• Upgrades of the Kootenai sturgeon production facilities at the existing Tribal Sturgeon Hatchery near Bonners Ferry, Idaho
• Developing, completing and start-up documentation and operations for Twin Rivers Sturgeon and Burbot Hatchery at the confluence of the Moyie and Kootenai Rivers
• Collecting native Kootenai sturgeon broodstock from the Kootenai River
• Collecting native burbot broodstock from within basin sources (i.e. Moyie Lake stock from British Columbia)
• Spawning, incubating, and rearing Kootenai sturgeon (both Tribal and Twin Rivers facilities)  and burbot (Twin Rivers)
• Refining aquaculture techniques for both sturgeon and burbot
• Releasing Kootenai sturgeon and burbot at appropriate developmental stages to suitable habitat in the Kootenai River
• Supporting operations, maintenance and monitoring at both Tribal and Twin Rivers facilities
Account Type(s):
Expense
Contract Start Date:
02/01/2015
Contract End Date:
01/31/2016
Current Contract Value:
$2,855,535
Expenditures:
$2,855,535

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
John Barco III Bonneville Power Administration No Interested Party jwbarco@bpa.gov (503) 230-3223
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Sue Ireland Kootenai Tribe Yes Supervisor ireland@kootenai.org (208) 267-3620
Solomonn Marsh Bonneville Power Administration Yes Contracting Officer spmarsh@bpa.gov (503) 230-3943
Edna Runyan Kootenai Tribe Yes Administrative Contact edna@kootenai.org (208) 267-3620
Alison Squier Ziji Creative Resources No Interested Party zcr1@cableone.net (208) 367-9366
Dan Warren D J Warren and Associates, Inc. Yes Interested Party dan.warren@djwassociates.com (541) 929-4639
Virgil Watts III Bonneville Power Administration Yes COR vlwatts@bpa.gov (503) 230-4625
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Shawn Young Kootenai Tribe Yes Contract Manager young@kootenai.org (208) 597-4490


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Administrative Oversight B: 119. Provide Administrative Oversight of the Kootenai Tribal Fisheries Program (KTOI) 01/31/2016 01/31/2016
Kootenai Tribal and Twin Rivers Hatchery Maintenance C: 61. Kootenai Tribal and Twin Rivers Hatchery Maintenance (KTOI) 01/31/2016 01/31/2016
Kootenai Tribal and Twin Rivers Sturgeon Hatchery Production D: 176. Kootenai Tribal and Twin Rivers Hatchery Production - Sturgeon (KTOI/BCFFS) 01/31/2016 01/31/2016
Twin Rivers Hatchery Production - Burbot E: 176. Kootenai Twin River Hatchery Production - Burbot (KTOI) 01/31/2016 10/31/2015
Mark 2014 Year class of white sturgeon F: 158. Mark Sturgeon before Release (KTOI) 11/30/2015 05/01/2015
Mark subsample of 2015 Year class of Burbot G: 158. Mark Subsample of Burbot before Release (KTOI) 10/15/2015 10/15/2015
Maintain and Monitor Fish Health H: 60. Maintain and Monitor Fish Health at the Kootenai Tribal and Twin Rivers Hatcheries (KTOI/BCFFS) 01/31/2016 01/31/2016
Genetic Research and Data Presentation I: 157. Sturgeon Genetic Research (UC Davis) 01/31/2016 01/31/2016
Sturgeon and Burbot Monitoring - Telemetry J: 157. Kootenai Sturgeon and Burbot Telemetry (BCMFLNRO) 01/31/2016 01/31/2016
Kootenai Sturgeon Monitoring and Evaluation K: 157. Juvenile Sturgeon Index Sampling (BCMFLNRO) 01/31/2016 01/31/2016
Moyie Lake Burbot Broodstock Development L: 157. Burbot Broodstock Development (BC MFLNRO/KTOI) 01/31/2016 01/31/2016
Study plan for applying burbot spawning-sounds to restoration/management activities M: 174. Produce Study Plan Applying Burbot Spawning Criteria to Habitat Restoration (TTU-USGS) 01/31/2016 01/31/2016
Optimize conservation aquaculture techniques for Burbot in coordination with U of I N: 174. Optimize Conservation Aquaculture Techniques for Burbot (U of I ARI/KTOI) 01/31/2016 01/31/2016
Burbot and White Sturgeon Recovery Planning O: 157. Burbot and Sturgeon Recovery Planning (BCMFLNRO) 01/31/2016 01/31/2016
Monitor kokanee P: 98. Monitor Kokanee (KTOI) 01/31/2016 09/30/2015
Kootenai Tribal Fisheries Program Outreach Q: 99. Kootenai Tribal Fisheries Program Outreach (KTOI/ZIJI) 01/31/2016 01/31/2016
Draft out year budgets and SOW that meets KTOI and BPA requirements R: 119. Manage & Administer Projects (DJW) 01/31/2016 01/31/2016
Fish Culture Procedures Manuals for Tribal and Twin Rivers Hatcheries S: 174. Produce Operational Fish Culture Procedures for Sturgeon and Burbot (DJW) 01/31/2016 01/31/2016
Implementation support for Kootenai River Native Fish Conservation Aquaculture Program T: 174. Program Support and APR Meetings (ZIJI) 01/31/2016 01/31/2016
Annual Progress Report U: 132. Submit Progress Report for the period (February 1, 2015) to (January 31, 2016) (KTOI) 01/31/2016 01/31/2016
Provide BPA with any required EC documentation V: 165. Provide BPA with any required EC documentation 01/31/2016 01/31/2016

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Burbot (Lota lota)
  • 1 instance of WE 176 Produce Hatchery Fish
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 4 instances of WE 174 Produce Plan
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
Kokanee (Oncorhynchus nerka)
  • 1 instance of WE 98 Other
Sturgeon, White (A. transmontanus) - Kootenai River DPS (Endangered)
  • 1 instance of WE 176 Produce Hatchery Fish
  • 1 instance of WE 60 Maintain Fish Health
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 2 instances of WE 174 Produce Plan
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/01/2015
B 119 Provide Administrative Oversight of the Kootenai Tribal Fisheries Program (KTOI) 02/01/2015
C 61 Kootenai Tribal and Twin Rivers Hatchery Maintenance (KTOI) 02/01/2015
D 176 Kootenai Tribal and Twin Rivers Hatchery Production - Sturgeon (KTOI/BCFFS) 02/01/2015
E 176 Kootenai Twin River Hatchery Production - Burbot (KTOI) 02/01/2015
F 158 Mark Sturgeon before Release (KTOI) 02/01/2015
G 158 Mark Subsample of Burbot before Release (KTOI) 02/01/2015
H 60 Maintain and Monitor Fish Health at the Kootenai Tribal and Twin Rivers Hatcheries (KTOI/BCFFS) 02/01/2015
I 157 Sturgeon Genetic Research (UC Davis) 02/01/2015
J 157 Kootenai Sturgeon and Burbot Telemetry (BCMFLNRO) 02/01/2015
K 157 Juvenile Sturgeon Index Sampling (BCMFLNRO) 02/01/2015
L 157 Burbot Broodstock Development (BC MFLNRO/KTOI) 02/01/2015
M 174 Produce Study Plan Applying Burbot Spawning Criteria to Habitat Restoration (TTU-USGS) 02/01/2015
N 174 Optimize Conservation Aquaculture Techniques for Burbot (U of I ARI/KTOI) 02/01/2015
O 157 Burbot and Sturgeon Recovery Planning (BCMFLNRO) 02/01/2015
P 98 Monitor Kokanee (KTOI) 02/01/2015
Q 99 Kootenai Tribal Fisheries Program Outreach (KTOI/ZIJI) 02/01/2015
R 119 Manage & Administer Projects (DJW) 02/01/2015
S 174 Produce Operational Fish Culture Procedures for Sturgeon and Burbot (DJW) 02/01/2015
T 174 Program Support and APR Meetings (ZIJI) 02/01/2015
U 132 Submit Progress Report for the period (February 1, 2015) to (January 31, 2016) (KTOI) 02/01/2015
V 165 Provide BPA with any required EC documentation 02/01/2015