Province | Subbasin | % |
---|---|---|
Columbia Gorge | Hood | 100.00% |
Previous: | Next: |
---|---|
n/a |
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
All required environmental and land use permits secured. | B: 165. Environmental Compliance | 03/27/2015 | 03/27/2015 | |
Manage Contract | C: 119. Contract Management | 09/30/2018 | 11/22/2017 | |
Construct four concrete raceways at the MFFF. | D: 171. Install concrete raceways. | 09/29/2017 | 09/15/2017 | |
Install predator fencing. | E: 171. Construct predator fencing around Moving Falls Fish Facility (MFFF). | 01/31/2017 | 01/31/2017 | |
MFFF water intake inspected. | F: 171. Inspect MFFF water intake for blockage. | 10/15/2015 | 08/06/2015 | |
MFFF ladder AWS slide gate installed. | G: 171. Install slide gate in MFFF auxillary water supply (AWS). | 12/18/2015 | 09/30/2015 | |
Sixteen trays (in two to four stacks) installed in PFH hatch house. | H: 171. Reduce Egg Tray Densities in Parkdale Fish Hatchery Hatch House | 07/31/2017 | 06/30/2017 | |
PFH alarm system upgraded. | I: 171. Upgrade HRPP alarm system. | 09/29/2018 | 12/22/2017 | |
Report summarizing contract accomplishments | L: 132. Submit Progress Reports for the period March 2015 - September 2017 and October 2017 - September 2018 | 06/30/2020 | ||
PFH early rearing tanks enclosed | M: 171. Enclose Parkdale Fish Hatchery early rearing tanks | 12/15/2017 | 12/14/2017 | |
Complete the Certification of the Moving Falls Facility Water Right | Q: 154. Complete water right certification for MFFF | 12/31/2017 | 12/21/2017 | |
Complete risk assessment and determine next phase. | R: 175. PFH Berm Phase I: Prepare designs and specifications for Parkdale Berm | 09/30/2018 | 09/28/2018 | |
PFH Phase II berm work completed. | S: 61. PFH Berm Phase II: Implement preferred alternative from Phase I risk assessment. | 09/30/2019 | 08/31/2017 | |
Properly Functioning Intake Structure at Moving Falls | T: 61. Maintain/repair water intake structure at the Moving Falls Fish Facility | 12/31/2018 | 06/13/2018 | |
HRPP Master Plan updated. | U: 196. HRPP Master Plan Update | 09/30/2019 | 09/30/2019 | |
MFFF access road improved. | V: 171. Moving Falls Access Road Improvement | 06/26/2020 | 06/19/2020 | |
Two grey water pumps replaced. | W: 61. Replace grey water lift station at PFH | 06/30/2020 | 12/20/2019 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (Oncorhynchus tshawytscha) - All Populations |
|
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened) |
|
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened) |
|
Steelhead (Oncorhynchus mykiss) - All Populations |
|
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 03/01/2015 | ||||||
B | 165 | Environmental Compliance | 03/01/2015 | ||||||
C | 119 | Contract Management | 03/01/2015 | ||||||
D | 171 | Install concrete raceways. | 03/02/2016 | ||||||
E | 171 | Construct predator fencing around Moving Falls Fish Facility (MFFF). | 03/02/2015 | ||||||
F | 171 | Inspect MFFF water intake for blockage. | 03/01/2015 | ||||||
G | 171 | Install slide gate in MFFF auxillary water supply (AWS). | 03/02/2015 | ||||||
H | 171 | Reduce Egg Tray Densities in Parkdale Fish Hatchery Hatch House | 03/02/2015 | ||||||
I | 171 | Upgrade HRPP alarm system. | 03/01/2015 | ||||||
J | 175 | Dee Mill adult fish trap planning. | 03/01/2015 | ||||||
K | 171 | Neal Creek steelhead acclimation infrastructure development. | 03/02/2015 | ||||||
L | 132 | Submit Progress Reports for the period March 2015 - September 2017 and October 2017 - September 2018 | 03/01/2015 | ||||||
M | 171 | Enclose Parkdale Fish Hatchery early rearing tanks | 05/22/2017 | ||||||
N | 175 | Plan adult fish trapping facility in Neal Creek. | 03/01/2015 | ||||||
O | 171 | Construction of the Neal Creek adult fish trap | |||||||
P | 172 | Purchase MFFF land from Weyerhaeuser | 03/01/2015 | ||||||
Q | 154 | Complete water right certification for MFFF | 03/01/2015 | ||||||
R | 175 | PFH Berm Phase I: Prepare designs and specifications for Parkdale Berm | 09/15/2018 | ||||||
S | 61 | PFH Berm Phase II: Implement preferred alternative from Phase I risk assessment. | 10/15/2018 | ||||||
T | 61 | Maintain/repair water intake structure at the Moving Falls Fish Facility | 03/01/2015 | ||||||
U | 196 | HRPP Master Plan Update | |||||||
V | 171 | Moving Falls Access Road Improvement | 09/30/2019 | ||||||
W | 61 | Replace grey water lift station at PFH | 01/16/2020 |